ML021690201
| ML021690201 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/07/2002 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML021690201 (12) | |
Text
Jun.
07, 2002 Page 1 of MANUAL HARD COPY DISTRIBUTION; DOCUMENT TRANSMITTAL 2002-282k6 USER INFORMATION:
1z"T
- TB EMPL#:23244 CA#:0386
-1r'*?'Tr7cLA2, Phone#:
254-3658 TRANSMITTAL INFORMATION:
T0
..L.... L.....L 06/07/2002 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRMI -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/23/2002 ADD MANUAL TABLE OF CONTENTS DATE: 06/06/2002 CATEGORY:
DOCUMENTS TYPE: TRM ID:
TRM1 REPLACE:
REV:N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
TRM APPROVED AMENDMENT TO UNIT I TECHNICAL REQUIREMENTS MANUAL EFFECTIVE DATE 06/0512002 Replace the following pages of the Technical Requirements Manual with the enclosed pages.
The revised pages are identified by Effective Date and contain vertical lines indicating the area of change.
DOCUENT CONTROL_
S ERVICES -SSES EFFECTIVE EFFECTIVE REMOVE PAGES DATE INSERT PAGES DATE TRM / LOES 04/17/2002 TRM / LOES 06/05/2002 3.1-7 and 3.1-8 8/31/1998 TRM / 3.1-7 and TRM / 3.1-8 06/05/2002 3.10-5 and 3.10-6 8/31/1998 TRM /3.10-5 and TRM / 3.10-6 06/05/2002
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title TABLE OF CONTENTS USE AND APPLICATION Pages 1.0-1 through 1.0-3 PLANT PROGRAMS Pages 2.0-1 through 2.0-2 Page TRM/2.0-3 Page 2.0-4 Page TRM/2.0-5 through Page TRM/2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Pages TRM / 2.0-10 through TRM / 2.0-12 Page TRM / 2.0-13 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Pages TRM / 3.0-3 Pages TRM / 3.0-4 REACTIVITY CONTROL SYSTEM",
Pages 3.1-1 through 3.1-6 Pages TRM / 3.1-7 and T*.ý 8N Pages TRM / 3.1-9 anaTiM
- 9.
Page TRM /3.1-10 A Pages 3.1-11 thro."'l I, ol*
if, CORE OPEl Page TRI I1 TOC TRM / 3.2-35 STRUNNTATION s
,'13.3-1 through TRM / 3.3-3 l?,age,,ýUM / 3.3-4
.3-5 through 3.3-8 P P" TRM / 3.3-9 and TRM / 3.3-9a Pages TRM / 3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 through TRM / 3.3-15 Page TRM / 3.3-16 Pages 3.3-17 and 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-21 Pages 3.3-22 and 3.3-23 Pages TRM / 3.3-24 through TRM / 3.3-26 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 EFFECTIVE DATE 06/05/2002 1.0 2.0 Effective Date 04/17/2002 08/31/1998 08/31/1998 08101/2001 08/31/1998 04/02/1999 03/29/2000 04/02/1999 06/16/2000 04/08/1999 03/15/2002 04/08/1999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 08/31/1998 07/07/1999 03/15/2002 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 06/27/2001 08/3111998 12/14/1998 08/31/1998 04/02/1999 10/23/1998 08/31/1998 3.0 3.1 3.2 3.3 3.4 I
SUSQUEHANNA -UNIT 1 TRM / LOES-1
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.5 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.6 EFFECTIVE DATE 06/05/2002 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM / 3.6-4
- Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-7 Page TRM / 3.6-8 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM 3.7-27 Page TRM / 3.7-28 through TRM / 3.7-34a Pages TRM / 3.7-35 through TRM /3.7-37 Pages 3.7-38 through 3.7-40 Pages TRM / 3.7-41 and TRM / 3.7-41a Pages 3.7-42 and 3.7-43 Pages 3.7-44 through 3.7-48 Page TRM / 3.7-49 Pages TRM / 3.7-50 and TRM / 3.7-51 Page TRM / 3.7-52 Pages TRM / 3.7-53 and TRM / 3.7-54 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Pages 3.8-3 and 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-9 Page TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-11 a Pages 3.8-12 through 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Effective Date 08/31/1998 04/17/2000 08/31/1998 08/31/1998 01/07/2002 08/31/1998 07/06/2000 02/12/1999 08/31/1998 08/02/1999 12/29/1999 08/02/1999 11/16/2001 02/01/1999 08/31/1998 08/11/2000 08/31/1998 10/13/1998 06/16/2000 03/09/2001 07/05/2000 07/29/1999 04/02/2002 08/31/1998 04/02/2002 08/31/1998 07/19/2001 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 08/31/1998 3.7 3.8 3.9 SUSQUEHANNA -UNIT 1 TRM / LOES-2
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Title MISCELLANEOUS Pages 3.10-1 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 RADIOACTIVE EFFLUENTS
- Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM / 3.11-22 through TRM / 3.11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 Effective Date 08/31/1998 06/05/2002 04/07/2000 Corrected 04/17/2002 08/31/1998 09/01/1998 08/31/1998 04/02/2002 09/01/1998 08/31/1998 02/05/1999 08/31/1998 EFFECTIVE DATE 06/05/2002 Section 3.10 3.11 3.12 4.0 I
SUSQUEHANNA -UNIT 1 TRM / LOES-3
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL.)
Section Title B 3.0 B 3.1 B 3.2 B 3.3 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7
_ Page TRM / B 3.1-8 Pages B 3.1-9 and B 3.1-10 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-5a Page TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-15 Pages TRM / B 3.3-16 through TRM / B 3.3-20 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4
-Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM / B 3.6-9 EFFECTIVE DATE 06/05/2002 Effective Date 08/31/1998 03/15/2002 07/13/1999 08/31/1998 07/13/1999 02/18/1999 08/31/1998 08/31/1998 04/07/2000 08/31/1998 12/29/2000 01/07/2002 12/17/1998 12/17/1998 12/17/1998 03/30/2001 08/31/1998 04/07/2000 08/31/1998 10/15/1999 08/31/1998 08/31/1998 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002 05/25/2001 B 3.4 B3.5 B3.6 SUSQUEHANNA -UNIT 1 TRM I LOES-4
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / B 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.1 1-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a.
Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15
,Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11-23 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages,TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-10a Pages TRM / B 3.7-11 and TRM / B 3.7-1 la Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM I B 3.7-14a and TRM / B 3.7-14b Pages TRM 1 B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM/B 3.7-21 through TRM/B 3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM / B 3.7-34 and TRM / B 3.7-35 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-17 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 EFFECTIVE DATE 06/05/2002 Effective Date 08/31/1998 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 02/01/1999 08/31/1998 05/11/2001 04/07/2000 08/31/1998 03/09/2001 07/29/1999 07/05/2000 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 08/31/1998 08/23/1999 04/17/2002 08/30/1998 02/01/1999 04/07/2000 02/01/1999 11/01/1999 02/01/1999 08/30/1998 04/02/2002 04/02/2002 04/02/2002 B3.8 B.3.9 SUSQUEHANNA -UNIT 1 TRM / LOES-5
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-23a Page B 3.11-24 Page TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-35 Page TRM / B 3.11-36 04102/2002 08/30/1998 11/01/1999 08/30/1998 02/12/1999 02/05/1999 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 EFFECTIVE DATE 06/05/2002 SUSQUEHANNA -UNIT 1 TRM / LOES-6
Control Rod Block Instrumentation 3.1.3 TABLE 3.1.3-1 (Page 1 of 2)
CONTROL ROD BLOCK INSTRUMENTATION APPLICABLE REQUIRED CONDITIONS MODES OR OTHER CHANNELS REFERENCED FROM SPECIFIED PER TRIP REQUIRED ACTION SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION A.1 REQUIREMENTS VALUE
- 1. APRM
- a. Neutron Flux 2, 5(a) 4 B
TRS 3.1.3.1
< 14% RTP High Setdown TRS 3.1.3.4 TRS 3.1.3.5
- b. Flow Biased 1
4 B
TRS 3.1.3.1 See COLR Simulated Thermal TRO 3.2 (b)
Power - High TRS 3.1.3.2 TRS 3.1.3.4 TRS 3.1.3.5
- c. Fixed Neutron Flux 1
4 B
TRS 3.1.3.1
_ 111% RTP
- High TRS 3.1.3.4 TRS 3.1.3.5
- d. Downscale 1
4 B
TRS 3.1.3.1
> 3% RTP TRS 3.1.3.4 TRS 3.1.3.5
- e. Inop 1,2 4
B TRS 3.1.3.4 NA 5(a) 4 B
TRS 3.1.3.4 NA
- 2. Source Range Monitors
- a. Detector not full 2(c) 3 B
TRS 3.1.3.3 NA in TRS 3.1.3.7 5
2 B
- b. Upscale 2(d) 3 B
TRS 3.1.3.3
_< 4E5 cps TRS 3.1.3.6 TRS 3.1.3.7 5
2 B
TRS 3.1.3.3
_< 4E5 cps TRS 3.1.3.6 TRS 3.1.3.7
- c. Inop 2(d) 3 B
2 B
TRS 3.1.3.3 NA TRS 3.1.3.7 (continued)
When performing Shutdown Margin Demonstration per Technical Specification 3.10.8.
See COLR for single loop operation per Technical Specification 3.4.1, Recirculation Loops Operating When not automatically bypassed with SRM counts Ž_ 100 cps or the IRM channels on range 3 or higher.
When not automatically bypassed with IRM channels on range 8 or higher.
EFFECTIVE DATE 06/05/2002 (a)
(b)
(C)
(d)
TRM / 3.1-7 SUSQUEHANNA -UNIT 1
Control Rod Block Instrumentation 3.1.3 TABLE 3.1.3-1 (Page 2 of 2)
CONTROL ROD BLOCK INSTRUMENTATION APPLICABLE REQUIRED CONDITIONS MODES OR OTHER CHANNELS REFERENCED FROM SPECIFIED PER TRIP REQUIRED ACTION SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION A.1 REQUIREMENTS VALUE
- d. Downscale 2(e) 3 B
TRS 3.1.3.3
>_ 0.5 cpsO0 TRS 3.1.3.6 TRS 3.1.3.7 5 (i) 2 B
TRS 3.1.3.3
> 0.5 cps(ii TRS 3.1.3.6 TRS 3.1.3.7
- a. Detector not full 2, 5 6
B TRS 3.1.3.3 NA in TRS 3.1.3.7
- b. Neutron Flux -
2, 5 6
B TRS 3.1.3.1
< 110/125 High TRS 3.1.3.3 divisions of TRS 3.1.3.5 full scale TRS 3.1.3.7
- c. Inop 2,5 6
- d. Downscale 2'() 5 6
B TRS 3.1.3.1 3/125 TRS 3.1.3.3 divisions TRS 3.1.3.5 of full scale TRS 3.1.3.7
- 4. Scram Discharge-1, 2, 5 (h) 2 C
TRS 3.1.3.4
_s 36.5 gallons Volume Water Level -
TRS 3.1.3.6 High
- 5. Reactor Coolant System Recirculation Flow
- a. Upscale 1
2 C
TRS 3.1.3.4
< 117/125 TRS 3.1.3.5 divisions of full scale
- b. Inop 1
2 C
TRS 3.1.3.4 NA
- c. Comparator 1
2 C
TRS 3.1.3.4
_< 11% flow TRS 3.1.3.5 deviation (e)
When not automatically bypassed with IRMs on range 3 or higher.
Provided signal-to-noise ratio is _> 2. Otherwise >_ 2.8 cps.
(g)
When not automatically bypassed with IRM channels on range 1.
(h)
When more than one control rod is withdrawn. Not applicable to control rods removed per Technical Specification 3.10.5 or 3.10.6.
(i)
Not required when eight or fewer fuel assemblies (adjacent to the SRMs) are in the core.
EFFECTIVE DATE 06/05/2002 SUSQUEHANNA -UNIT1I TRM / 3.1-8
I Shutdown Margin Test RPS Instrumentation 3.10.2 TECHNICAL REQUIREMENT SURVEILLANCE NOTES
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the trip function is maintained.
SURVEILLANCE FREQUENCY TRS 3.10.2.1 Verify SRM is OPERABLE per TRO 3.1.3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> "Control Rod Block Instrumentation" TRS 3.10.2.2 Verify that the RPS circuitry "shorting 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> links" have been removed TRS 3.10.2.3 Perform CHANNEL FUNCTIONAL TEST 7 days TRS 3.10.2.5 Perform CHANNEL CALIBRATION 24 months TRS 3.10.2.4 Perform LOGIC SYSTEM FUNCTIONAL 184 days TEST with "shorting links" removed EFFECTIVE DATE 06/05/2002 I
SUSQUEHANNA - UNIT 1 TRM / 3.10-5
I Shutdown Margin Test RPS Instrumentation 3.10.2 TABLE 3.10.2-1 TRM RPS INSTRUMENTATION CONDITIONS REQUIRED REFERENCED CHANNELS FROM PER TRIP REQUIRED SUR1VEILLANCE FUNCTION SYSTEM ACTION A.1 REQUIREMENTS ALLOWABLE VALUE
- 1. Source Range Monitor (a)
B TRS 3.10.2.1
< 3.3E5 CPS TRS 3.10.2.2 TRS 3.10.2.3 TRS 3.10.2.4 TRS 3.10.2.5
- a.
Neutron Flux-High 6
C TRS 3.10.2.2 (b)
TRS 3.10.2.4
- b.
Inop 6
C TRS 3.10.2.2 N/A TRS 3.10.2.4
- 3. Average Power Range Monitor
- a. Neutron Flux-High, 4
C TRS 3.10.2.2 (b)
Setdown TRS 3.10.2.4
- b. - Inop 4
C TRS 3.10.2.2 N/A TRS 3.10.2.4 (a)
As specified in LCO 3.3.1.2 (b)
As specified in LCO 3.3.1.1 EFFECTIVE DATE 06/05/2002 SUSQUEHANNA - UNIT I TRM / 3.10-6