ML021690193

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual
ML021690193
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/07/2002
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021690193 (12)


Text

Jun.

07, 2002 Page 1 of MANUAL HARD DOCUMENT T COPY DISTRIBUTION kNSMITTAL 2002-2842/

USER INFORMATION:

Namo. FLAIrMvLAULiLfrB EMPL#:23244 Phone#:

254-3658 TRANSMITTAL INFORMATION:

06/07/2002 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/23/2002 ADD MANUAL TABLE OF CONTENTS DATE: 06/06/2002 CATEGORY:

DOCUMENTS TYPE: TRM ID:

TRM2 REPLACE:

REV:N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

CA#:0386

TRM APPROVED AMENDMENT TO UNIT 2 TECHNICAL REQUIREMENTS MANUAL EFFECTIVE DATE 06/05/2002 Replace the following pages of the Technical Requirements Manual with the enclosed pages.

The revised pages are identified by Effective Date and contain vertical lines indicating the area of change.

EFFECTIVE EFFECTIVE REMOVE PAGES DATE INSERT PAGES DATE "TRM / LOES 04/1712002 TRM / LOES 06/05/2002 3.1-7 and 3.1-8 8/31/1998 TRM / 3.1-7 and TRM / 3.1-8 06/05/2002 3.10-5 and 3.10-6 8/30/98 TRM / 3.10-5 and TRM /3.10-6 06/05/2002 DOCUIMENT CONTROL SERP*iCES - SSES

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title TOC 1.0 Effective Date TABLE OF CONTENTS USE AND APPLICATION Pages 1.0-1 through 1.0-3 2.0 PLANT PROGRAMS Pages 2.0-1 through 2.0-2 Page TRM/2.0-3 Page 2.0-4 Pages TRM / 2.0-5 through TRM / 2.0-7 Pages TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-12 Page TRM / 2.0-13 3.0 3.1 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Pages TRM / 3.0-3 Pages TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS-,

Pages 3.1-1 through 3.1-6,/

Pages TRM / 3.1-7 and TRM /,8 Pages TRM / 3.1-9 and Tf

/ 3.

Page TRM/3.1-10 Pages 3.1-11 through31-'

3.2 CORE OPERATII Page 3.2-1 Pages TRV 3.3 I1 04/02/2002 08/31/1998 08/31/1998 08/01/2001 08/31/1998 04/12/1999 08130/2001 04/12/1999 06/16/2000 04/08/1999 03/15/2002 04108/1999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 08/31/1998 08/31/1998 03/26/2001 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/1411998 06/27/2001 08/31/1998 12/14/1998 08/31/1998

-.04/02/1999 TRM /3.2-28

-1 through TRM / 3.3-3 Pg TR

.3-4 age1.3-through 3.3-8 Pg RM / 3.3-9 and TRM / 3.3-9a gTRM / 3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 through TRM / 3.3-15 Page TRM / 3.3-16 Pages 3.3-17 and 3.3-18

-Pages TRM / 3.3-19 through TRM / 3.3-20 Pages 3.3-21 and 3.3-22 Pages TRM / 3.3-23 through TRM / 3.3-25 EFFECTIVE DATE 06/05/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-1

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL RiQUIREMENTS MANUAL)

Section Title REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 3.5 3.4 EFFECTIVE DATE 06/05/2002 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Page 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-8 Page TRM / 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM /.3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a

- Pages 3.7-41 and 3.7-42 Pages 3.7-43 through 3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Page TRM / 3.7-51 Pages TRM / 3.7-52 and TRM / 3.7-53 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Pages 3.8-3 and 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-8 Page TRM / 3.8-9 Page 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-1 Ia Pages 3.8-12 through 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page.TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Effective Date 10/23/1998 08/31/1998 08/31/1998 04/17/2000 08/31/1998 08/31/1998 01/07/2002 08/31/1998 07/06/2000 02/12/1999 07/29/1999 08/31/1998 08/02/1999 01/21/2000 08/02/1999 11/16/2001 02/01/1999 08/31/1998 08/11/2000 08/31/1998 10/13/1998 03/09/2001 07/05/2000 07/29/1999 04/0212002 08/31/1998 04/02/2002 08/31/1998 08/24/2001 08/31/1998 04/02/2002 04/02/2002 08/31/1998 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 3.6 3.7 3.8 SUSQUEHANNA -UNIT 2 TRM / LOES-2

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title 3.9 Effective Date REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7

- Page TRM 1 3.10-8 3.11 3.12 4.0 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM / 3.11-22 through TRM / 3.11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 08/30/1998 06/05/2002 04/07/2000 corrected 04/17/2002 08/31/1998 09/01/1998 08/31/1998 04/02/2002 09101/1998 08/31/1998 02/05/1999 08/31/1998 EFFECTIVE DATE 06/05/2002 I

SUSQUEHANNA -UNIT 2 TRM /LOES-3

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)-

Section Title B 3.0 B 3.1 B 3.2 B 3.3 B 3.4 B 3.5 B 3.6 B 3.7 Effective Date APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 Pages B 3.1-9 and B 3.1-10 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM/B 3.3-1 Page B 3.3-2 Page TRM/B 3.3-3 and TRM / B 3.3-3A Page TRM / B 3.3-4 Pages TRM / B 3.3-5 and TRM / B 3.3-5a Page TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-15 Page TRM/B 3.3-16 Pages B 3.3-17 through B 3.3-20

- Pages TRM / B 3.3-21 through TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM I B 3.6-9 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a 08/31/1998

  • 03/15/2002 07/13/1999 08/31/1998 07/13/1999 02/18/1999 08/31/1998 08/31/1998 04/07/2000 08/31/1998 12/29/2000 01/07/2002 12/17/1998 12/17/1998 03/30/2001 08/31/1998 04/07/2000 08/31/1998 04/02/1999 08/3111998 10/15/1999 08/31/1998 08/31/1998 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002

.05125/2001 08/31/1998 08/02/1999 08/02/1999 EFFECTIVE DATE 06/05/2002 SUSQUEHANNA -UNIT 2 TRM / LOES-4

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.8 B.3.9 Effective Date Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-1Oa Pages TRM I B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 through TRM/B 3.7-21a Page TRM/B 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM / B 3.7-34 and TRM / B 3.7-35 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-17 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Page TRM / B 3.10-6 and TRM / 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-1 Ia Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11-23 Page TRM / B 3.11-23a Pages B 3.11-24 Page TRM / B 3.11-25 Pages B 3.11-26 through TRM / B 3.11-35 Pages TRM / B 3.11-36 08/02/1999 08/02/1999 08/02/1999 08/02/1999 02/01/1999 08/31/1998 05/11/2001 04/07/2000 08/31/1998 03/09/2001 07/29/1999 07/05/2000 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 10/23/1998 08/31/1998 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 11/01/1999 02/01/1999 08/31/1998 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 11/01/1999 08/31/1998 02/12/1999 EFFECTIVE DATE 06/05/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-5

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 02/05/1999 EFFECTIVE DATE 06/05/2002 SUSQUEHANNA -UNIT 2 TRM / LOES-6

Control Rod Block Instrumentation 3.1.3 TABLE 3.1.3-1 (Page 1 of 2)

CONTROL ROD BLOCK INSTRUMENTATION CONDITIONS APPLICABLE REQUIRED REFERENCED MODES OR OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

1. APRM
a.

Neutron 2,5(a) 4 B

TRS 3.1.3.1

< 14% RTP Flux - High TRS 3.1.3.4 Setdown TRS 3.1.3.5

b.

Flow 1

4 B

TRS 3.1.3.1 See COLR Biased TRS 3.1.3.2 TRO 3.2 (b)

Simulated TRS 3.1.3.4 Thermal TRS 3.1.3.5 Power High

c.

Fixed 1

4 B

TRS3.1.3.1

<111% RTP Neutron TRS 3.1.3.4 Flux - High TRS 3.1.3.5

d.

Downscale 1

4 B

TRS 3.1.3.1

_3% RTP TRS 3.1.3.4 TRS 3.1.3.5

e. Inop 1,2 4

B TRS 3.1.3.4 NA 5(a) 4 B

TRS 3.1.3.4 NA

2.

Source Range Monitors

a.

Detector not full in 2(c) 3 B

TRS 3.1.3.3 NA TRS 3.1.3.7 5

2 B

TRS 3.1.3.3 NA TRS 3.1.3.7

b.

Upscale 2 (d) 3 B

TRS 3.1.3.3

_< 4E5 cps TRS 3.1.3.6 TRS 3.1.3.7 5

2 B

TRS 3.1.3.3

< 4E5 cps TRS 3.1.3.6 TRS 3.1.3.7

c.

Inop 2 (d) 3 B

TRS 3.1.3.3 NA TRS 3.1.3.7 5

2 B

TRS 3.1.3.3 NA TRS 3.1.3.7 (continued)

(a) When performing Shutdown Margin Demonstration per Technical Specification 3.10.8.

(b) See COLR for single loop operation per Technical Specification 3.4.1, Recirculation Loops Operating (c) When not automatically bypassed with SRM counts _> 100 cps or the IRM channels on range 3 or higher.

(d) When not automatically bypassed with IRM channels on range 8 or higher.

EFFECTIVE DATE 06/05/2002 SUSQUEHANNA -UNIT 2 TRM / 3.1-7

Control Rod Block Instrumentation 3.1.3 TABLE 3.1.3-1 (Page 2 of 2)

CONTROL ROD BLOCK INSTRUMENTATION CONDITIONS APPLICABLE REQUIRED REFERENCED MODES OR OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

d.

Downscale 2(e) 3 B

TRS 3.1.3.3

>Ž0.5 cps(')

TRS 3.1.3.6 I

TRS 3.1.3.7 5c) 2 B

TRS 3.1.3.3

Ž0.5 cps(t)

TRS 3.1.3.6 I

TRS 3.1.3.7

3.

Intermediate Range Monitors

a.

Detector 2, 5 6

B TRS 3.1.3.3 NA not full in TRS 3.1.3.7

b.

Neutron 2, 5 6

B TRS 3.1.3.1

< 110/125 Flux-High TRS 3.1.3.3 divisions of full TRS 3.1.3.5 scale TRS 3.1.3.7

c.

Inop 2, 5 6

B TRS 3.1.3.3 NA TRS 3.1.3.7

d.

Downscale 2( 5 6

B TRS 3.1.3.1 3/125 divisions TRS 3.1.3.3 of full scale TRS 3.1.3.5 TRS 3.1.3.7

4. Scram Discharge 1, 2, 5 (h) 2 C

TRS 3.1.3.4

_< 36.5 gallons Volume Water TRS 3.1.3.6 Level-High

5.

Reactor Coolant System Recirculation Flow

a.

Upscale 1

2 C

TRS 3.1.3.4

<5117/125 TRS 3.1.3.5 divisions of full scale

b.

Inop 1

2 C

TRS 3.1.3.4 NA

c.

Comparator 1

2 C

TRS 3.1.3.4

_ 11% flow TRS 3.1.3.5 deviation (e)

When not automatically bypassed with IRMs on range 3 or higher.

Provided signal-to-noise ratio is Ž_ 2. Otherwise Ž_

2.8 cps.

(g)

When notautomatically bypassed with IRM channels on range 1.

(h)

When more than one control rod is withdrawn. Not applicable to control rods removed per Technical Specification 3.10.5 or 3.10.6.

0)

Not required when eight or fewer fuel assemblies (adjacent to the SRMs) are in the core.

EFFECTIVE DATE 06/05/2002 SUSQUEHANNA -UNIT 2 TRM /3.1-8

I Shutdown Margin Test RPS Instrumentation 3.10.2 TECHNICAL REQUIREMENT SURVEILLANCE NOTES------

1. Refer to Table 3.10.2-1 to determine which TRSs apply for each TRM RPS Instrumentation function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the trip function is maintained.

SURVEILLANCE FREQUENCY TRS 3.10.2.1 Verify SRM is OPERABLE per LCO 3.3.1.2 "Source 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Range Monitor (SRM) Instrumentation" TRS 3.10.2.2 Verify that the RPS circuitry "shorting links" have 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> been removed TRS 3.10.2.3 Perform CHANNEL FUNCTIONAL TEST 7 days TRS 3.10.2.5 Perform CHANNEL CALIBRATION 24 months TRS 3.10.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST with 184 days "shorting links" removed EFFECTIVE DATE 06/05/2002 SUSQUEHANNA - UNIT 2 TRM / 3.10-5

TRM Reactor Protection System (RPS) Instrumentation 3.10.2 TABLE 3.10.2-1 TRM RPS INSTRUMENTATION CONDITIONS REFERENCED REQUIRED FROM CHANNELS PER REQUIRED SURVEILLANCE FUNCTION TRIP SYSTEM ACTION A.1 REQUIREMENTS ALLOWABLE VALUE

1.

Sourte Range Monitor (a)

B TRS 3.10.2.1

_< 3.3E5 CPS TRS 3.10.2.2 TRS 3.10.2.3 TRS 3.10.2.4 TRS 3.10.2.5

2.

Intermediate Range Monitor

a.

Neutron Flux-High 6

C TRS 3.10.2.2 (b)

TRS 3.10.2.4

b.

Inop 6

C TRS 3.10.2.2 N/A TRS 3.10.2.4

3.

Average Power Range Monitor

a.

Neutron Flux-High, 4

C.

TRS 3.10.2.2 (b)

Setdown TRS 3.10.2.4

b.

Inop 4

C TRS 3.10.2.2 N/A TRS 3.10.2.4 As specified in LCO 3.3.1.2 As specified in LCO 3.3.1.1 EFFECTIVE DATE 06/05/2002 (a)

(b)

I SUSQUEHANNA - UNIT 2 TRM / 3.10-6