ML021690193
ML021690193 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 06/07/2002 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML021690193 (12) | |
Text
Jun. 07, 2002 Page 1 of MANUAL HARD COPY DISTRIBUTION DOCUMENT T kNSMITTAL 2002-2842/
USER INFORMATION:
Namo. FLAIrMvLAULiLfrB EMPL#:23244 CA#:0386 Phone#: 254-3658 TRANSMITTAL INFORMATION:
06/07/2002 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/23/2002 ADD MANUAL TABLE OF CONTENTS DATE: 06/06/2002 CATEGORY: DOCUMENTS TYPE: TRM ID: TRM2 REPLACE: REV:N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
TRM APPROVED AMENDMENT TO UNIT 2 TECHNICAL REQUIREMENTS MANUAL EFFECTIVE DATE 06/05/2002 Replace the following pages of the Technical Requirements Manual with the enclosed pages.
The revised pages are identified by Effective Date and contain vertical lines indicating the area of change.
EFFECTIVE EFFECTIVE REMOVE PAGES DATE INSERT PAGES DATE "TRM / LOES 04/1712002 TRM / LOES 06/05/2002 3.1-7 and 3.1-8 8/31/1998 TRM / 3.1-7 and TRM / 3.1-8 06/05/2002 3.10-5 and 3.10-6 8/30/98 TRM / 3.10-5 and TRM /3.10-6 06/05/2002 DOCUIMENT CONTROL SERP*iCES - SSES
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/02/2002 1.0 USE AND APPLICATION Pages 1.0-1 through 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Pages 2.0-1 through 2.0-2 08/31/1998 Page TRM/2.0-3 08/01/2001 Page 2.0-4 08/31/1998 Pages TRM / 2.0-5 through TRM / 2.0-7 04/12/1999 Pages TRM / 2.0-8 08130/2001 Pages TRM / 2.0-9 through TRM / 2.0-12 04/12/1999 Page TRM / 2.0-13 06/16/2000 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/08/1999 Pages TRM / 3.0-3 03/15/2002 Pages TRM / 3.0-4 04108/1999 3.1 REACTIVITY CONTROL SYSTEMS-,
Pages 3.1-1 through 3.1-6,/ 08/31/1998 Pages TRM / 3.1-7 and TRM / ,8 06/05/2002 Pages TRM / 3.1-9 and Tf / 3. 02/18/1999 Page TRM/3.1-10 02/18/1999 Pages 3.1-11 through31-' 08/31/1998 3.2 CORE OPERATII Page 3.2-1 08/31/1998 Pages TRV TRM /3.2-28 03/26/2001 3.3 I1
-1 through TRM / 3.3-3 07/16/1999 Pg TR .3-4 11/28/2000 age1.3- through 3.3-8 08/31/1998 Pg RM / 3.3-9 and TRM / 3.3-9a 12/17/1998 gTRM / 3.3-10 and TRM / 3.3-11 12/17/1998 Page TRM / 3.3-12 03/30/2001 Pages TRM / 3.3-13 through TRM / 3.3-15 12/1411998 Page TRM / 3.3-16 06/27/2001 Pages 3.3-17 and 3.3-18 08/31/1998
-Pages TRM / 3.3-19 through TRM / 3.3-20 12/14/1998 Pages 3.3-21 and 3.3-22 08/31/1998 Pages TRM / 3.3-23 through TRM / 3.3-25 -.04/02/1999 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 06/05/2002
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL RiQUIREMENTS MANUAL)
Section Title Effective Date 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 10/23/1998 Pages 3.4-6 through 3.4-13 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 08/31/1998 Page TRM / 3.5-4 04/17/2000 Page 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-8 07/06/2000 Page TRM / 3.6-9 02/12/1999 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Pages TRM / .3.7-4 through TRM / 3.7-10 08/02/1999 Page TRM / 3.7-11 01/21/2000 Pages TRM / 3.7-12 through TRM / 3.7-27 08/02/1999 Pages TRM / 3.7-28 through TRM / 3.7-33 11/16/2001 Pages TRM / 3.7-34 through TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-39 08/31/1998 Pages TRM / 3.7-40 and TRM / 3.7-40a 08/11/2000
- Pages 3.7-41 and 3.7-42 08/31/1998 Pages 3.7-43 through 3.7-48 10/13/1998 Pages TRM / 3.7-49 and TRM / 3.7-50 03/09/2001 Page TRM / 3.7-51 07/05/2000 Pages TRM / 3.7-52 and TRM / 3.7-53 07/29/1999 3.8 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 04/0212002 Pages 3.8-3 and 3.8-4 08/31/1998 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-8 08/31/1998 Page TRM / 3.8-9 08/24/2001 Page 3.8-10 08/31/1998 Page TRM / 3.8-11 04/02/2002 Page TRM / 3.8-1 Ia 04/02/2002 Pages 3.8-12 through 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page.TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 SUSQUEHANNA -UNIT 2 TRM / LOES-2 EFFECTIVE DATE 06/05/2002
SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 06/05/2002 I Page TRM / 3.10-7 04/07/2000 corrected
- Page TRM 1 3.10-8 04/17/2002 3.11 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 08/31/1998 Pages 3.11-13 through 3.11-16 09/01/1998 Pages 3.11-17 through 3.11-21 08/31/1998 Pages TRM / 3.11-22 through TRM / 3.11-24 04/02/2002 Pages 3.11-25 through 3.11-32 09101/1998 Pages 3.11-33 through 3.11-47 08/31/1998 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA -UNIT 2 TRM /LOES-3 EFFECTIVE DATE 06/05/2002
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)-
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 through TRM / B 3.0-15 *03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 07/13/1999 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 07/13/1999 Page TRM / B 3.1-8 02/18/1999 Pages B 3.1-9 and B 3.1-10 08/31/1998 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM/B 3.3-1 04/07/2000 Page B 3.3-2 08/31/1998 Page TRM/B 3.3-3 and TRM / B 3.3-3A 12/29/2000 Page TRM / B 3.3-4 01/07/2002 Pages TRM / B 3.3-5 and TRM / B 3.3-5a 12/17/1998 Page TRM / B 3.3-6 12/17/1998 Pages TRM / B 3.3-7 through TRM / B 3.3-9 03/30/2001 Pages B 3.3-10 through B 3.3-15 08/31/1998 Page TRM/B 3.3-16 04/07/2000 Pages B 3.3-17 through B 3.3-20 08/31/1998
- Pages TRM / B 3.3-21 through TRM / B 3.3-23 04/02/1999 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 08/3111998 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 09/23/1999 Page TRM / B 3.6-5 01/07/2002 Pages TRM / B 3.6-6 through TRM I B 3.6-9 .05125/2001 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 through TRM / B 3.7-7 08/02/1999 Page TRM / B 3.7-7a 08/02/1999 SUSQUEHANNA -UNIT 2 TRM / LOES-4 EFFECTIVE DATE 06/05/2002
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.7-8 through TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-1Oa 08/02/1999 Pages TRM I B 3.7-11 through TRM / B 3.7-14 08/02/1999 Page TRM / B 3.7-14a 08/02/1999 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 through TRM/B 3.7-21a 05/11/2001 Page TRM/B 3.7-22 and TRM/B 3.7-23 04/07/2000 Pages B 3.7-24 through B 3.7-30 08/31/1998 Pages TRM / B 3.7-31 and TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 07/29/1999 Pages TRM / B 3.7-34 and TRM / B 3.7-35 07/05/2000 B 3.8 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 04/02/2002 Page TRM / B 3.8-2a 04/02/2002 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 04/02/2002 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-17 04/02/2002 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-3 08/31/1998 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Page TRM / B 3.10-6 and TRM / 3.10-7 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Pages TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-1 Ia 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 11/01/1999 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Pages TRM / B 3.11-21 through TRM / B 3.11-23 04/02/2002 Page TRM / B 3.11-23a 04/02/2002 Pages B 3.11-24 08/31/1998 Page TRM / B 3.11-25 11/01/1999 Pages B 3.11-26 through TRM / B 3.11-35 08/31/1998 Pages TRM / B 3.11-36 02/12/1999 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 06/05/2002
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 02/05/1999 SUSQUEHANNA -UNIT 2 TRM / LOES-6 EFFECTIVE DATE 06/05/2002
Control Rod Block Instrumentation 3.1.3 TABLE 3.1.3-1 (Page 1 of 2)
CONTROL ROD BLOCK INSTRUMENTATION CONDITIONS APPLICABLE REQUIRED REFERENCED MODES OR OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 1. APRM
Simulated TRS 3.1.3.4 Thermal TRS 3.1.3.5 Power High
- 2. Source Range Monitors
- b. Upscale 2 (d) 3 B TRS 3.1.3.3 _<4E5 cps TRS 3.1.3.6 TRS 3.1.3.7 5 2 B TRS 3.1.3.3 < 4E5 cps TRS 3.1.3.6 TRS 3.1.3.7
(a) When performing Shutdown Margin Demonstration per Technical Specification 3.10.8.
(b) See COLR for single loop operation per Technical Specification 3.4.1, Recirculation Loops Operating (c) When not automatically bypassed with SRM counts _>100 cps or the IRM channels on range 3 or higher.
(d) When not automatically bypassed with IRM channels on range 8 or higher.
SUSQUEHANNA -UNIT 2 TRM / 3.1-7 EFFECTIVE DATE 06/05/2002
Control Rod Block Instrumentation 3.1.3 TABLE 3.1.3-1 (Page 2 of 2)
CONTROL ROD BLOCK INSTRUMENTATION CONDITIONS APPLICABLE REQUIRED REFERENCED CHANNELS FROM MODES OR OTHER SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- d. Downscale 2(e) 3 B TRS 3.1.3.3 >Ž0.5 cps(')
TRS 3.1.3.6 I TRS 3.1.3.7 5c) 2 B TRS 3.1.3.3 Ž0.5 cps(t)
- b. Neutron 2, 5 6 B TRS 3.1.3.1 < 110/125 Flux- High TRS 3.1.3.3 divisions of full TRS 3.1.3.5 scale TRS 3.1.3.7
- d. Downscale - 2( 5 6 B TRS 3.1.3.1 3/125 divisions TRS 3.1.3.3 of full scale TRS 3.1.3.5 TRS 3.1.3.7
36.5 gallons Volume Water TRS 3.1.3.6 Level-High
- 5. Reactor Coolant System Recirculation Flow
- b. Inop 1 2 C TRS 3.1.3.4 NA
- c. Comparator 1 2 C TRS 3.1.3.4 _ 11% flow TRS 3.1.3.5 deviation (e) When not automatically bypassed with IRMs on range 3 or higher.
Provided signal-to-noise ratio is Ž_2. Otherwise Ž_2.8 cps.
(g) When notautomatically bypassed with IRM channels on range 1.
(h) When more than one control rod is withdrawn. Not applicable to control rods removed per Technical Specification 3.10.5 or 3.10.6.
- 0) Not required when eight or fewer fuel assemblies (adjacent to the SRMs) are in the core.
SUSQUEHANNA -UNIT 2 TRM /3.1-8 EFFECTIVE DATE 06/05/2002
I Shutdown Margin Test RPS Instrumentation 3.10.2 TECHNICAL REQUIREMENT SURVEILLANCE
NOTES------
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the trip function is maintained.
SURVEILLANCE FREQUENCY TRS 3.10.2.1 Verify SRM is OPERABLE per LCO 3.3.1.2 "Source 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Range Monitor (SRM) Instrumentation" TRS 3.10.2.2 Verify that the RPS circuitry "shorting links" have 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> been removed TRS 3.10.2.3 Perform CHANNEL FUNCTIONAL TEST 7 days TRS 3.10.2.5 Perform CHANNEL CALIBRATION 24 months TRS 3.10.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST with 184 days "shorting links" removed SUSQUEHANNA - UNIT 2 TRM / 3.10-5 EFFECTIVE DATE 06/05/2002
TRM Reactor Protection System (RPS) Instrumentation 3.10.2 TABLE 3.10.2-1 TRM RPS INSTRUMENTATION CONDITIONS REFERENCED REQUIRED FROM CHANNELS PER REQUIRED SURVEILLANCE FUNCTION TRIP SYSTEM ACTION A.1 REQUIREMENTS ALLOWABLE VALUE
- 1. Sourte Range Monitor (a) B TRS 3.10.2.1 _<3.3E5 CPS TRS 3.10.2.2 TRS 3.10.2.3 TRS 3.10.2.4 TRS 3.10.2.5
- a. Neutron Flux-High 6 C TRS 3.10.2.2 (b)
TRS 3.10.2.4
- 3. Average Power Range Monitor
- a. Neutron Flux-High, 4 C. TRS 3.10.2.2 (b)
Setdown TRS 3.10.2.4
- b. Inop 4 C TRS 3.10.2.2 N/A TRS 3.10.2.4 I (a) As specified in LCO 3.3.1.2 (b) As specified in LCO 3.3.1.1 SUSQUEHANNA - UNIT 2 TRM / 3.10-6 EFFECTIVE DATE 06/05/2002