Exelon Generation Company, LLC www.exeloncoyp.com Nuclear Byron Station 4450 North German Church Road Byron, IL 61010-9794 April 15, 2002 LTR:
BYRON 2002-0042 File:
2.07.0200 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Monthly Operating Report In accordance with Technical Specification 5.6.4, "Monthly Operating Reports," we are submitting the Monthly Operating Report for Byron Station, Units 1 and 2. This report covers the period March 1, 2002, through March 31, 2002.
If you have any questions regarding this report, please contact Mr. William Grundmann, Regulatory Assurance Manager, at (815) 406-2800.
Respectfully, Stephen E. Kuczynski Plant Manager Byron Nuclear Generating Station SEK/DD/dpk Attachment cc:
Regional Administrator - NRC Region III NRC Senior Resident Inspector-Byron Station NRC Project Manager - NRR - Byron Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety
ATTACHMENT BYRON STATION, UNIT 1 AND UNIT 2 MONTHLY OPERATING REPORT EXELON GENERATION COMPANY, LLC FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 NRC DOCKET NOS. STN 50-454 AND STN 50-455
OPERATING DATA REPORT UNIT ONE DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-454 Byron One 04/15/02 D. Drawbaugh (815) 406-2813 REPORTING PERIOD: March, 2002 (Month/Year)
MONTH YEAR TO DATE CUMULATIVE
- 1.
Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
- 2.
Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
- 3.
Number of Hours the Reactor was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
- 4.
Number of Hours the Generator was On Line (also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
- 5.
Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
- 6.
Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
1,187 1,163 315.25 302.18 0
312,031 N/A N/A 1,731.25 1,718.18 0
2,008,709 N/A N/A 122,686.82 121,682.72 0
125,447,286
UNIT SHUTDOWNS DOCKET NO.
50-454 UNIT NAME Byron One DATE 04/15/02 COMPLETED BY D. Drawbauqh TELEPHONE (815) 406-2813 REPORTING PERIOD: March 2002 NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING S: SCHEDULED DOWN (2)
COMMENTS 1
03/12/02 S
441.8 C
2 B1R11
SUMMARY
- B1 R11 Was Executed Per Schedule.
(1)
Reason A - Equipment Failure (Explain)
B - Maintenance Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2)
Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
UNIQUE REPORTING REQUIREMENTS (UNIT ONE) for the month of March, 2002
- 1.
Safety/Relief valve operations for Unit One. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4, "Monthly Operating Report."
VALVES ACTUATED NO. & TYPE ACTUATION PLANT CONDITION DESCRIPTION OF EVENT
- 2.
Licensee generated changes to Offsite Dose Calculation Manual.
None
- 3.
Indications of failed fuel.
None. Fuel Reliability Indicator: (FRI) = 3.90 E-06 j.Ci/cc.
- 4.
Licensee Events Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit One, occurring during the reporting period, March 1, 2002, through March 31, 2002. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73, "Licensee Event Report System."
Licensee Event Reroort Number Occurrence Date Title of Occurrence 454-2002-001-00 454-2002-002-00 03/09/02 03/18/02 Three Main Steam Safety Valve Relief Tests Exceeded Required Tolerance Due to Disk to Nozzle Metallic Bonding and Setpoint Drift Two Pressurizer Safety Valve Relief Tests Exceeded Required Tolerance Due to Setpoint Drift DATE None
OPERATING DATA REPORT UNIT TWO DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-455 Byron Two 04/15/02 D. Drawbaucqh (815) 406-2813 REPORTING PERIOD: March, 2002 (Month/Year)
MONTH YEAR TO DATE CUMULATIVE 1
Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
- 2.
Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
- 3.
Number of Hours the Reactor was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
- 4.
Number of Hours the Generator was On Line (also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
- 5.
Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
- 6.
Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
1,155 1,131 744 744 0
885,773 N/A N/A 2,160 2,160 0
2,570,284 N/A N/A 115,243.38 114,469.28 0
118,564,277
UNIT SHUTDOWNS DOCKET NO.
50-455 UNIT NAME Byron Two DATE 04/15/02 COMPLETED BY D. Drawbaucqh TELEPHONE (815) 406-2813 REPORTING PERIOD: March, 2002 NO.
DATE TYPE DURATION REASON (1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING S: SCHEDULED DOWN (2)
COMMENTS
SUMMARY
- Unit Two On-Line During the Month of March.
(1)
Reason (2)
A - Equipment Failure (Explain)
B - Maintenance Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
UNIQUE REPORTING REQUIREMENTS (UNIT TWO) for the month of March, 2002 Safety/Relief valve operations for Unit Two. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4, "Monthly Operating Report."
VALVES ACTUATED NO. & TYPE ACTUATION PLANT CONDITION DESCRIPTION OF EVENT
- 2.
Licensee generated changes to Offsite Dose Calculation Manual.
None
- 3.
Indications of failed fuel.
None. Fuel Reliability Indicator: (FRI) = 2.21 E-06 jiCi/cc.
- 4.
Licensee Events Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit Two, occurring during the reporting period, March 1, 2002, through March 31, 2002. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73, "Licensee Event Report System."
Licensee Event Report Number Occurrence Date Title of Occurrence None DATE None