Letter to W. Eaton Dtd 6/10/02 - Reply to Response to Order for Interim Safeguards and Security Compensatory Measures
ML021610522
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/10/2002
From: Zwolinski J
NRC/NRR/DLPM
To: Eaton W
Entergy Operations
References
TAC MB4132
Download: ML021610522 (5)


Text

June 10, 2002 Mr. William A. Eaton Vice President, Operations Grand Gulf Nuclear Station Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NO. MB4132)

Dear Mr. Eaton:

On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued an Order modifying the operating license for the Grand Gulf Nuclear Station (GGNS) to require compliance with the specified interim safeguards and security compensatory measures. The interim compensatory measures (ICMs) were listed in Attachment 2 to the Order. When issuing the Order, the Commission recognized that you have voluntarily and responsibly implemented additional security measures following the events of September 11, 2001, but in light of the continuing generalized high-level threat environment, the Commission concluded that the security measures should be embodied in an Order consistent with the established regulatory framework.

The Order required responses and actions within specified time frames.Section III.A of the Order required licensees to immediately start implementation of the requirements listed in to the Order and to complete implementation no later than August 31, 2002.

Section III.B of the Order required licensees to notify the Commission: (1) if they are unable to comply with the requirements described in Attachment 2, (2) if compliance with any of the requirements is unnecessary in their specific circumstances, (3) if implementation of any of the requirements would cause the licensee to be in violation of the provisions of any Commission regulation or the facility license, or (4) if implementation of any of the requirements described in would adversely impact the safe operation of the facility.Section III.C.1 of the Order required licensees to submit to the Commission, within 20 days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order.Section IV of the Order noted that in accordance with 10 CFR § 2.202, the licensee must submit an answer to the Order and may request a hearing on the Order within 20 days of the date of the Order and, where good cause is shown, consideration would be given to extend the time to request a hearing.

In a letter dated March 15, 2002 (GNRO-2002/00029), you submitted a response to the Order for GGNS. By letter dated March 15, 2002 (CNRO-2002-00015), Entergy Operations, Inc.

(Entergy), requested an extension of time until June 14, 2002, to respond to ICMs B.2.a(1),

B.2.a(2), and B.2.b, and requested a comparable extension of time to file a request for hearing for those matters. On May 10, 2002 (GNRO-2002-00040), Entergy provided supplementary information for GGNS.

W. Eaton The NRC staff has reviewed these responses and finds that you have satisfied the 20-day reporting requirements of the Order, with the exception of ICMs B.2.a(1), B.2.a(2), and B.2.b.

An extension of time is hereby granted until June 14, 2002, for submission of the required response to these ICMs. An extension of time is granted until June 14, 2002, for your filing of a request for a hearing related to ICMs B.2.a(1), B.2.a(2), and B.2.b.

Your response to ICM B.3.d refers to licensee implementation guidance that has not yet been formally submitted to the NRC staff by NEI. Accordingly, the staff has not made a finding on its acceptability. The staff has found the guidance proposed by NEI in its March 8, 2002, letter to be an acceptable method for licensee implementation of the ICMs, as stated in our letter to NEI dated March 11, 2002. You have referenced the March 8, 2002, guidance in your response to ICM B.3.d. Therefore, we find that your response to ICM B.3.d, exclusive of the additional reference to the unapproved guidance, meets the reporting requirements of the Order. of GNRO-2002/00029 and Attachment 1 of CNRO-2002-00015 provided a list of commitments. The NRC staff regards the specific responses to the Order made to each of the ICMs to be the applicable responses to the Order and, accordingly, has not reviewed the list of commitments.

The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, you are to report to the Commission when you have achieved full compliance with the requirements described in Attachment 2 to the Order.

Please contact Dave Jaffe at (301) 415-1439 if you have any other questions on these issues.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page

W. Eaton The NRC staff has reviewed these responses and finds that you have satisfied the 20-day reporting requirements of the Order, with the exception of ICMs B.2.a(1), B.2.a(2), and B.2.b.

An extension of time is hereby granted until June 14, 2002, for submission of the required response to these ICMs. An extension of time is granted until June 14, 2002, for your filing of a request for a hearing related to ICMs B.2.a(1), B.2.a(2), and B.2.b.

Your response to ICM B.3.d refers to licensee implementation guidance that has not yet been formally submitted to the NRC staff by NEI. Accordingly, the staff has not made a finding on its acceptability. The staff has found the guidance proposed by NEI in its March 8, 2002, letter to be an acceptable method for licensee implementation of the ICMs, as stated in our letter to NEI dated March 11, 2002. You have referenced the March 8, 2002, guidance in your response to ICM B.3.d. Therefore, we find that your response to ICM B.3.d, exclusive of the additional reference to the unapproved guidance, meets the reporting requirements of the Order. of GNRO-2002/00029 and Attachment 1 of CNRO-2002-00015 provided a list of commitments. The NRC staff regards the specific responses to the Order made to each of the ICMs to be the applicable responses to the Order and, accordingly, has not reviewed the list of commitments.

The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, you are to report to the Commission when you have achieved full compliance with the requirements described in Attachment 2 to the Order.

Please contact Dave Jaffe at (301) 415-1439 if you have any other questions on these issues.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page DISTRIBUTION:

PUBLIC SCollins/JJohnson BSheron WBorchardt LMarsh BBoger VDricks SMorris GTracy RCrlenjak EMerschoff, RIV DJaffe OGC ACRS/ACNW SECY G. Hill (2) PDIV-1R/F RMartin RAlbert RSullivan VOrdaz JBelanger RGramm KBrockman, RIV RPalla DJohnson Sheet 1 of 2

Document Name: C:\ORPCheckout\FileNET\ML021610522.wpd Accession No.ML021610522 NRR-106 *See previous concurrence OFFICE DLPM/PM EP DSSA DIPM NSIR OGC(NLO)

NAME RMartin C. Gibson M.Rubin W.Dean A. Madison J. Goldberg DATE 06/6/02 06/5/02 06/6/02 06/6/02 06/6/02 06/6/02 OFFICE PDIV-1/PM

  • PDII-2/LA PDIV-1/SC
  • PDIV/D DLPM/D NAME NKalyanam MMcAllister for RGramm A:CHolden JZwolinski EDunnington DATE 05/ 09/02 06/10/02 05/09/02 06/7/02 06/10/02 OFFICIAL RECORD COPY

Grand Gulf Nuclear Station cc:

Executive Vice President Attorney General

& Chief Operating Officer Department of Justice Entergy Operations, Inc. State of Louisiana P. O. Box 31995 P. O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Wise, Carter, Child & Caraway State Health Officer P. O. Box 651 State Board of Health Jackson, MS 39205 P. O. Box 1700 Jackson, MS 39205 Winston & Strawn 1400 L Street, N.W. - 12th Office of the Governor FloorWashington, DC 20005-3502 State of Mississippi Jackson, MS 39201 Director Division of Solid Waste Management Attorney General Mississippi Department of Natural Asst. Attorney General Resources State of Mississippi P. O. Box 10385 P. O. Box 22947 Jackson, MS 39209 Jackson, MS 39225 President Vice President, Operations Support Claiborne County Entergy Operations, Inc.

Board of Supervisors P.O. Box 31995 P. O. Box 339 Jackson, MS 39286-1995 Port Gibson, MS 39150 Director Regional Administrator, Region IV Nuclear Safety Assurance U.S. Nuclear Regulatory Commission Entergy Operations, Inc.

611 Ryan Plaza Drive, Suite 1000 P.O. Box 756 Arlington, TX 76011 Port Gibson, MS 39150 Senior Resident Inspector John R. McGaha, President U. S. Nuclear Regulatory Commission Entergy Operations, Inc.

P. O. Box 399 P.O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 General Manager, GGNS Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150 May 1999