June 11, 2002 LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse Nuclear Power Station, Unit 1
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - MEETING
SUMMARY
OF APRIL 10, 2002, TO DISCUSS THE INSPECTIONS AND REPAIR CONCEPT OF THE REACTOR PRESSURE VESSEL HEAD On April 10, 2002, the Nuclear Regulatory Commission (NRC) management and staff conducted a public meeting in Rockville, Maryland, with representatives of FirstEnergy Nuclear Operating Company. The purpose of the meeting was to discuss proposed repairs and modifications to the reactor pressure vessel (RPV) head at the Davis-Besse Nuclear Power Station with interested members of the public. The meeting was noticed on March 29, 2002.
A telephone conference bridge was established for members of the public who were unable to attend.
The licensee presented a summary of their ultrasonic and visual inspection results from the damaged RPV head, an overview of their proposed repair concept, and an overview of their proposed final reactor core configuration after repairs are complete. Following the licensees presentation, questions were taken. The NRC participants are included as Enclosure 1. The presentation slides used by the licensee are accessible on the portion of the NRC website (www.nrc.gov) established for the public meetings associated with the Davis-Besse reactor vessel head degradation issue, in the Agencywide Documents Access and Management System (ADAMS) under ADAMS accession number ML021050239, and are included as. Subsequent to the meeting, the licensee provided a list of the questions from the meeting along with their responses, which are included as Enclosure 3.
/RA/
Douglas V. Pickett, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. NRC Participants
- 2. Meeting Slides
- 3. Questions and Responses cc w/encls: See next page
Davis-Besse Nuclear Power Station, Unit 1 cc:
Mary E. OReilly FirstEnergy Corporation 76 South Main St.
Akron, OH 44308 Manager-Regulatory Affairs First Energy Nuclear Operating Company Davis-Besse Nuclear Power Station Oak Harbor, OH 43449-9760 Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60523-4351 Michael A. Schoppman Framatome ANP 1911 N. Ft. Myer Drive Rosslyn, VA 22209 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Plant Manager, Randel J. Fast FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, Ohio 43604-6506
June 11, 2002 LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse Nuclear Power Station, Unit 1
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - MEETING
SUMMARY
OF APRIL 10, 2002, TO DISCUSS THE INSPECTIONS AND REPAIR CONCEPT OF THE REACTOR PRESSURE VESSEL HEAD On April 10, 2002, the Nuclear Regulatory Commission (NRC) management and staff conducted a public meeting in Rockville, Maryland, with representatives of FirstEnergy Nuclear Operating Company. The purpose of the meeting was to discuss proposed repairs and modifications to the reactor pressure vessel (RPV) head at the Davis-Besse Nuclear Power Station with interested members of the public. The meeting was noticed on March 29, 2002.
A telephone conference bridge was established for members of the public who were unable to attend.
The licensee presented a summary of their ultrasonic and visual inspection results from the damaged RPV head, an overview of their proposed repair concept, and an overview of their proposed final reactor core configuration after repairs are complete. Following the licensees presentation, questions were taken. The NRC participants are included as Enclosure 1. The presentation slides used by the licensee are accessible on the portion of the NRC website (www.nrc.gov) established for the public meetings associated with the Davis-Besse reactor vessel head degradation issue, in the Agencywide Documents Access and Management System (ADAMS) under ADAMS accession number ML021050239, and are included as. Subsequent to the meeting, the licensee provided a list of the questions from the meeting along with their responses, which are included as Enclosure 3.
/RA/
Douglas V. Pickett, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. NRC Participants
- 2. Meeting Slides
- 3. Questions and Responses cc w/encls: See next page ADAMS Accession Numbers: ML020880332 (Notice)
ML021610120 (Summary)
ML021050239 (Enclosure 2)
ML021500453 (Enclosure 3)
ML021610125 (Package)
OFFICE PDIII-2/PM PDIII-2/PM PDIII-2/LA PDIII-2/SC NAME FLyon DPickett CRosenberg AMendiola DATE 06/ /02 06/11/02 06/11/02 06/11/02 OFFICIAL RECORD COPY
DISTRIBUTION FOR MEETING
SUMMARY
OF APRIL 10, 2002, WITH FIRSTENERGY NUCLEAR OPERATING COMPANY Hard Copy w/encls PD III-2 Reading PUBLIC GGrant, RIII Hard Copy w/Encl 1 OGC ACRS E-mail w/Encl 1 SCollins BSheron JZwolinski TMarsh CCasto WBateman KWichman AHiser SBajwa SCoffin SBloom BWetzel JChung ALee SLong AMendiola SSands DPickett THarris HNieh SRosenberg
LIST OF MEETING PARTICIPANTS APRIL 10, 2002 NRC FirstEnergy Brian Sheron John Wood Jack Strosnider Mark McLaughlin Bill Bateman Jim Powers Tony Mendiola Robb Borland Ken Karwoski Allen Hiser Doug Pickett ENCLOSURE 1