PSEG Nuclear LLC P.O. Box 236. Hancocks Bridge. New Jeisev 08088-0236 SAFEGUARDS INFORMATION MAY 31 2002 0 PSEG LR-N02-0196 Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Room 5 D2, Mail Stop 0-5 E7 11555 Rockville Pike, Rockville, MD 20852 SUPPLEMENTAL RESPONSE TO THE ISSUANCE OF ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311 AND 50-354

Dear Mr. Collins:

On March 15, 2002, PSEG Nuclear, LLC, submitted a letter in response to the Issuance of Order for Interim Safeguards and Security Compensatory Measures that was issued by the NRC on February 25, 2002. This letter provides additional information concerning two of the elements of our response that werediscussed in telephone conversations on April 30, 2002, and May 2, 2002, with NRC staff members.

The information that is included as an attachment to this letter provides additional detail concerning how PSEG Nuclear's response achieves the intended objectives of the order elements in question. PSEG Nuclear, LLC, considers the attached response to be Safeguards Information in accordance with 1 OCFR73.21.

Please contact Ted Straub at (856) 339-2244 if you have any questions or comments on this submittal.

WHEN SEPARATED FROM ENCLOSURE HANDLE THIS DOCUMENT AS DECONTROLLED SAFEGUARDS INFORMATION

<p"3 95-2168 REV. 7/99

, -w SAFEGUARDS INFORMATION Mr. Samuel J. Collins LR-N02-0196 2

I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, David F. Garchow Vice President - Operations Enclosure WHEN SEPARATED FROM ENCLOSURE HANDLE THIS DOCUMENT AS DECONTROLLED SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Mr. Samuel J. Collins 3

LR-N02-0196 C

Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 (WITHOUT ENCLOSURES)

Mr. R. Fretz, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 8B2 11555 Rockville Pike Rockville, MD 20852 Mr. G. Wunder, Licensing Project Manager - Hope Creek U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 8C2 11555 Rockville Pike Rockville, MD 20852 USNRC Senior Resident Inspector - Salem (X24)

USNRC Senior Resident Inspector - Hope Creek (X24)

Mr. K. Tosch, Manager IV, Bureau of Nuclear Engineering P0 Box 415 Trenton, NJ 08625 WHEN SEPARATED FROM ENCLOSURE HANDLE THIS DOCUMENT AS DECONTROLLED SAFEGUARDS INFORMATION