ML021560421
| ML021560421 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/05/2002 |
| From: | Subbaratnam R NRC/NRR/DLPM |
| To: | Moyer J Carolina Power & Light Co |
| Subbaratnam R, NRR/DLPM, 415-1478 | |
| References | |
| BL-02-001, TAC MB4570 | |
| Download: ML021560421 (5) | |
Text
Mr. J. W. Moyer, Vice President June 5, 2002 Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (HBRSEP2) -
BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE (TAC NO. MB4570)
Dear Mr. Moyer:
On March 18, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized-water reactor plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Section 50.54(f), of the Code of Federal Regulations (10 CFR 50.54(f)) if they are unable to provide the information or they cannot meet the requested completion dates.
You provided your 15-day Bulletin response for HBRSEP2 by letter dated April 1, 2002. The staff finds that you have provided the requested information, and has concluded that your plant does not appear to have conditions similar to those that led to the degradation at Davis-Besse.
However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01.
We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin. If you have any questions, please feel free to call me at 301-415-1478.
Sincerely,
/RA by J.Goshen Acting for/
Ram Subbaratnam, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page
Mr. J. W. Moyer, Vice President June 5, 2002 Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (HBRSEP2) -
BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE (TAC NO. MB4570)
Dear Mr. Moyer:
On March 18, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized-water reactor plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Section 50.54(f), of the Code of Federal Regulations (10 CFR 50.54(f)) if they are unable to provide the information or they cannot meet the requested completion dates.
You provided your 15-day Bulletin response for HBRSEP2 by letter dated April 1, 2002. The staff finds that you have provided the requested information, and has concluded that your plant does not appear to have conditions similar to those that led to the degradation at Davis-Besse.
However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01.
We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin. If you have any questions, please feel free to call me at 301-415-1478.
Sincerely,
/RA by J.Goshen acting for/
Ram Subbaratnam, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page DISTRIBUTION PUBLIC PDII-2 R/F BBonser, RII TKoshy E Dunnington (Hardcopy)
RSubbaratnam WBateman SBloom SCoffin EMCB R/F OGC ACRS ALee ADAMS ACCESSION NO. ML021560421 OFFICE PDII-2/PM PDII-2/LA EMCB PDII-2/Acting SC NAME JGoshen E Dunnington S Bloom T Koshy DATE 05/28/02 05/28/02 05/28/02 05/30/02 OFFICIAL RECORD COPY
Mr. J. W. Moyer H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:
Mr. William D. Johnson Mr. Mel Fry, Director Vice President and Corporate Secretary N.C. Department of Environment Carolina Power & Light Company and Natural Resources Post Office Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Ms. Karen E. Long Assistant Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director Post Office Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 4326 Mail Service Center Raleigh, North Carolina 27699-4326 U.S. Nuclear Regulatory Commission Resident Inspectors Office Mr. Virgil R. Autry, Director H. B. Robinson Steam Electric Plant South Carolina Department of Health 2112 Old Camden Road Bureau of Land & Waste Management Hartsville, South Carolina 29550 Division of Radioactive Waste Management 2600 Bull Street Mr. T. P. Cleary Columbia, South Carolina 29201 Plant General Manager Carolina Power & Light Company Mr. Terry C. Morton H. B. Robinson Steam Electric Plant, Unit No. 2 Manager 3581 West Entrance Road Performance Evaluation and Hartsville, SC 29550 Regulatory Affairs CPB 7 Carolina Power & Light Company Mr. T. D. Walt Post Office Box 1551 Director of Site Operations Raleigh, North Carolina 27602-1551 Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 Mr. John H. ONeill, Jr.
3581 West Entrance Road Shaw, Pittman, Potts & Trowbridge Hartsville, South Carolina 29550 2300 N Street, NW.
Washington, DC 20037-1128 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Mr. B. L. Fletcher III Manager - Regulatory Affairs Carolina Power & Light Company Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Carolina Power & Light Company Unit No. 2 H. B. Robinson Steam Electric Plant, 3581 West Entrance Road Unit No. 2 Hartsville, South Carolina 29550-0790 3581 West Entrance Road Hartsville, South Carolina 29550