ML021560092
From kanterella
Jump to navigation
Jump to search
ML021560092 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 05/31/2002 |
From: | Nazar M Nuclear Management Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML021560092 (242) | |
Similar Documents at Prairie Island | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24288A0112024-10-14014 October 2024
[Table view]L-PI-24-048 Prairie Island Nuclear Generating Plant (PINGP) Unit 1 Inservice Testing Proposed Alternative RR-10 ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24042A0012024-02-11011 February 2024 L-PI-24-008 Prairie Island Nuclear Generating Plant (PINGP) Unit 2 Inservice Testing Proposed Alternative RR-09 L-PI-23-027, Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2023-10-0303 October 2023 Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals ML23062A5112023-03-0303 March 2023 Refueling Outage Unit 1 R33 Owners Activity Report for Class 1. 2, 3 and Mc Inservice Inspections L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report ML20009F3312020-01-0909 January 2020 Refueling Outage Unit 2 R31 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations ML19108A2912019-04-18018 April 2019 Submittal of 2018 Unit 1 180-Day Steam Generator Tube Inspection Report ML19018A2042019-01-18018 January 2019 Inservice Inspection Summary Report Unit 1, Interval 5, Period 2, Outage 1 Refueling Outage Dates: 9/21/2018 to 10/26/2018 L-PI-18-003, Inservice Inspection Summary Report Unit 2, Refueling Outage Dates: 10/13/2017 to 11/20/2017, Fuel Cycle 29: 12/07/2015 to 11/20/20172018-02-12012 February 2018 Inservice Inspection Summary Report Unit 2, Refueling Outage Dates: 10/13/2017 to 11/20/2017, Fuel Cycle 29: 12/07/2015 to 11/20/2017 ML17046A6592017-02-15015 February 2017 Lnservice Inspection Summary Report Unit 1, Interval 5, Period 1, Outage 1, Refueling Outage Dates: 10/15/2016 to 11/20/2016, Fuel Cycle 29: 11/23/2014 to 11/20/2016 L-PI-16-030, Transmittal of 2015 180-Day Steam Generator Tube Inspection Report2016-05-20020 May 2016 Transmittal of 2015 180-Day Steam Generator Tube Inspection Report L-PI-16-013, Inservice Inspection Summary Report Refueling Outage Dates: 10/17/2015 to 12/06/2015, Fuel Cycle 28: 01/05/2014 to 12/06/20152016-03-0202 March 2016 Inservice Inspection Summary Report Refueling Outage Dates: 10/17/2015 to 12/06/2015, Fuel Cycle 28: 01/05/2014 to 12/06/2015 L-PI-15-025, Inservice Inspection Summary Report Unit 1, Interval 4, Period 3, Outage 2 - Refueling Outage Dates: 10/08/2014 to 11/22/2014, Fuel Cycle 28: 01/03/2013 to 11/22/20142015-02-18018 February 2015 Inservice Inspection Summary Report Unit 1, Interval 4, Period 3, Outage 2 - Refueling Outage Dates: 10/08/2014 to 11/22/2014, Fuel Cycle 28: 01/03/2013 to 11/22/2014 L-PI-15-016, Supplement to 10 CFR 50.55a Requests (RR) 1-RR-4-9 and 2-RR-4-9 (TACs MF4795 and MF4796) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fourth Ten-Year Interval Inservice Inspection (ISI) Program2015-02-0404 February 2015 Supplement to 10 CFR 50.55a Requests (RR) 1-RR-4-9 and 2-RR-4-9 (TACs MF4795 and MF4796) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fourth Ten-Year Interval Inservice Inspection (ISI) Program L-PI-15-013, Supplement to 10 CFR 50.55a Requests (RR) 1-RR-5-5 and 2-RR-5-5 (TACs MF4839 and MF4840) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fifth Ten-Year Interval Inservice Inspection (ISI) Program2015-02-0404 February 2015 Supplement to 10 CFR 50.55a Requests (RR) 1-RR-5-5 and 2-RR-5-5 (TACs MF4839 and MF4840) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fifth Ten-Year Interval Inservice Inspection (ISI) Program L-PI-14-127, Fifth Interval Inservice Inspection Plan December 21, 2014 Through December 20, 20242014-12-18018 December 2014 Fifth Interval Inservice Inspection Plan December 21, 2014 Through December 20, 2024 L-PI-14-117, Withdrawal of 10 CFR 50.55a Request RR-01 Associated with the Fifth Ten-Year Interval for the Inservice Test Program (TAC Nos. MF3928 and Mf 3929)2014-11-24024 November 2014 Withdrawal of 10 CFR 50.55a Request RR-01 Associated with the Fifth Ten-Year Interval for the Inservice Test Program (TAC Nos. MF3928 and Mf 3929) L-PI-14-096, Supplement to 10 CFR 50.55a Requests RR-01, RR-03, RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program2014-09-19019 September 2014 Supplement to 10 CFR 50.55a Requests RR-01, RR-03, RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program L-PI-14-095, 10 CFR 50.55a Requests 1-RR-5-7 and 2-RR-5-7 Associated with the Fifth Ten-Year Interval for the Lnservice Inspection Program2014-09-15015 September 2014 10 CFR 50.55a Requests 1-RR-5-7 and 2-RR-5-7 Associated with the Fifth Ten-Year Interval for the Lnservice Inspection Program L-PI-14-085, 10CFR 50.55a Requests Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program2014-09-15015 September 2014 10CFR 50.55a Requests Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program L-PI-14-080, 10 CFR 50.55a Requests 1-RR-4-9, 2-RR-4-9 and 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program2014-09-0303 September 2014 10 CFR 50.55a Requests 1-RR-4-9, 2-RR-4-9 and 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program L-PI-14-015, 10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Lnservice Test Program2014-04-0909 April 2014 10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Lnservice Test Program L-PI-14-029, Lnservice Inspection Summary Report Unit 2. Interval 4, Period 3, Outage 2, Refueling Outage Dates: 09/21/2013 to 01/04/2014, Fuel Cycle 27: 05/29/2012 to 01/04/20142014-04-0303 April 2014 Lnservice Inspection Summary Report Unit 2. Interval 4, Period 3, Outage 2, Refueling Outage Dates: 09/21/2013 to 01/04/2014, Fuel Cycle 27: 05/29/2012 to 01/04/2014 L-PI-13-089, Supplement to Aging Management Program Submittals2013-10-0808 October 2013 Supplement to Aging Management Program Submittals L-PI-13-027, Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 10-23-2012 to 01-02-2013 Unit 1, Fuel Cycle 27: 06-12-2011 to 01-02-20132013-03-29029 March 2013 Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 10-23-2012 to 01-02-2013 Unit 1, Fuel Cycle 27: 06-12-2011 to 01-02-2013 L-PI-12-077, Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 02-21-2012 to 05-29-2012 U2, Fuel Cycle 26: 05-26-2010 to 05-29-20122012-08-23023 August 2012 Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 02-21-2012 to 05-29-2012 U2, Fuel Cycle 26: 05-26-2010 to 05-29-2012 L-PI-11-087, Lnservice Inspection Summary Report, Interval 4, Period 2, Outage 2 Refueling Outage Dates: 04-29-2011 to 06-11-2011 Unit 1, Fuel Cycle 26: 11-23-2009 to 06-11-20112011-09-0808 September 2011 Lnservice Inspection Summary Report, Interval 4, Period 2, Outage 2 Refueling Outage Dates: 04-29-2011 to 06-11-2011 Unit 1, Fuel Cycle 26: 11-23-2009 to 06-11-2011 L-PI-10-099, Unit 2 180-Day Steam Generator Tube Inspection Report2010-11-12012 November 2010 Unit 2 180-Day Steam Generator Tube Inspection Report L-PI-10-083, Inservice Inspection Summary Report, Interval 4, Period 2, Outage 2, Refueling Outage Dates: 04-16-2010 to 05-24-2010 Unit 2, Fuel Cycle 25: 11-02-2008 to 05-24-20102010-08-20020 August 2010 Inservice Inspection Summary Report, Interval 4, Period 2, Outage 2, Refueling Outage Dates: 04-16-2010 to 05-24-2010 Unit 2, Fuel Cycle 25: 11-02-2008 to 05-24-2010 L-PI-10-051, Revision to Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006 Fuel Cycle 23: 11-23-2004 to 06-06-2006 and Revision to 2008 Unit 1 180-Day Steam Generator Tube Inspection Report2010-06-0101 June 2010 Revision to Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006 Fuel Cycle 23: 11-23-2004 to 06-06-2006 and Revision to 2008 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-10-013, Inservice Inspection Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage Dates: 09-12-2009 to 11-23-2009, Unit 1, Fuel Cycle 25: 03-23-2008 to 11-23-20092010-02-22022 February 2010 Inservice Inspection Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage Dates: 09-12-2009 to 11-23-2009, Unit 1, Fuel Cycle 25: 03-23-2008 to 11-23-2009 L-PI-09-015, Submittal of Inservice Inspection Examination Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage, Dates: 09-19-2008 to 11-01-2008 Unit 2, Fuel Cycle 24:12-15-2006 to 11-01-20082009-01-28028 January 2009 Submittal of Inservice Inspection Examination Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage, Dates: 09-19-2008 to 11-01-2008 Unit 2, Fuel Cycle 24:12-15-2006 to 11-01-2008 L-PI-08-082, Amendment to Unit 2 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-20062008-10-0707 October 2008 Amendment to Unit 2 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-2006 L-PI-08-055, Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2 Refueling Outage Dates: 02-13-2008 to 03-23-2008, Fuel Cycle 24: 06-06-2006 to 03-23-20082008-06-19019 June 2008 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2 Refueling Outage Dates: 02-13-2008 to 03-23-2008, Fuel Cycle 24: 06-06-2006 to 03-23-2008 ML0727800262007-10-31031 October 2007 Relief Request from ASME Code, Section X1, Inservice Inspection Program Relief Requests Nos. 1-RR-4-7 and 2-RR-4-7 L-PI-07-037, 10 CFR 50.55a Request 1-RR-4-6 for the Prairie Island, Unit 1, Fourth Ten-year Interval Inservice Inspection Program2007-05-11011 May 2007 10 CFR 50.55a Request 1-RR-4-6 for the Prairie Island, Unit 1, Fourth Ten-year Interval Inservice Inspection Program L-PI-07-023, Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-20062007-03-14014 March 2007 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-2006 L-PI-06-102, Unit 2 Steam Generator Inspection Results - 15 Day Report2006-12-18018 December 2006 Unit 2 Steam Generator Inspection Results - 15 Day Report L-PI-06-096, CFR 50.55a Requests 1-RR-4-7 and 2-RR-4-7 for the Units 1 and 2 Fourth 10-Year Interval Inservice Inspection Program2006-12-14014 December 2006 CFR 50.55a Requests 1-RR-4-7 and 2-RR-4-7 for the Units 1 and 2 Fourth 10-Year Interval Inservice Inspection Program ML0627701952006-10-0202 October 2006 Notification of NRC Inspection and Request for Information L-PI-06-072, Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006, Fuel Cycle 23: 11-23-2004 to 06-06-20062006-09-0101 September 2006 Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006, Fuel Cycle 23: 11-23-2004 to 06-06-2006 L-PI-05-082, Request for Relief No. 21, for the Plant 3rd 10-Year Interval Inservice Inspection Program2005-09-0808 September 2005 Request for Relief No. 21, for the Plant 3rd 10-Year Interval Inservice Inspection Program L-PI-04-135, Inservice Inspection Summary Report, Interval 3, Period 3, Interval 4, Period 1 Refueling Outage Dates: April 16, 2005 - June 10, 2005, Fuel Cycle 22: October 11, 2003 - June 10, 20052005-09-0808 September 2005 Inservice Inspection Summary Report, Interval 3, Period 3, Interval 4, Period 1 Refueling Outage Dates: April 16, 2005 - June 10, 2005, Fuel Cycle 22: October 11, 2003 - June 10, 2005 L-PI-05-074, Response to Request for Additional Information Regarding the Unit 1 Lnservice Lnspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-10-2004 to 11-23-2004 Fuel Cycle 22..2005-08-22022 August 2005 Response to Request for Additional Information Regarding the Unit 1 Lnservice Lnspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-10-2004 to 11-23-2004 Fuel Cycle 22.. L-PI-05-012, Request for Relief No. 17, Revision 0, for the Plant 3rd 10-year Interval Inservice Inspection Program2005-02-22022 February 2005 Request for Relief No. 17, Revision 0, for the Plant 3rd 10-year Interval Inservice Inspection Program L-PI-05-013, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates 09-10-04 Fuel Cycle 22: 12-7-2002 to 11-23-042005-02-22022 February 2005 Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates 09-10-04 Fuel Cycle 22: 12-7-2002 to 11-23-04 L-PI-05-002, 60-Day Report Pursuant to NRC Bulletin 2003-02 for 2004 Prairie Island Unit 1 Lower Head Penetration Inspection2005-01-24024 January 2005 60-Day Report Pursuant to NRC Bulletin 2003-02 for 2004 Prairie Island Unit 1 Lower Head Penetration Inspection L-PI-04-009, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-13-2003 to 10-10-2003 Fuel Cycle 21: 3-3-2002 to 10-10-20032004-01-0707 January 2004 Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-13-2003 to 10-10-2003 Fuel Cycle 21: 3-3-2002 to 10-10-2003 L-PI-04-005, Request for Relief No. 16, Revision 0 for the Third 10-Year Interval Inservice Inspection Program2004-01-0707 January 2004 Request for Relief No. 16, Revision 0 for the Third 10-Year Interval Inservice Inspection Program 2024-05-31 Category:Letter MONTHYEARML24298A0552024-10-30030 October 2024
[Table view]Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML021560092&oldid=2701758"