June 4, 2002 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Robert D. Starkey, Project Manager, Section 2
/RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF CONFERENCE CALL REGARDING REACTOR VESSEL HEAD INSPECTION ACTIVITIES AT SEABROOK STATION, UNIT NO. 1 (TAC NO. MB4577)
On May 28, 2002, the Nuclear Regulatory Commission (NRC) staff held a conference call with North Atlantic Energy Service Corporation (the licensee) to discuss the results of the licensees reactor vessel head inspection performed at Seabrook Station, Unit No. 1, during the May 2002 refueling outage. The call was conducted as a result of the identification of recent reactor vessel head degradation as discussed in NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
During the call, the licensee indicated that during the refueling outage they had performed a 100% visual inspection of the reactor vessel head and head penetration nozzles and that there was no evidence of boric acid deposits or corrosion.
Docket No. 50-443
June 4, 2002 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Robert D. Starkey, Project Manager, Section 2
/RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF CONFERENCE CALL REGARDING REACTOR VESSEL HEAD INSPECTION ACTIVITIES AT SEABROOK STATION, UNIT NO. 1 (TAC NO. MB4577)
On May 28, 2002, the Nuclear Regulatory Commission (NRC) staff held a conference call with North Atlantic Energy Service Corporation (the licensee) to discuss the results of the licensees reactor vessel head inspection performed at Seabrook Station, Unit No. 1, during the May 2002 refueling outage. The call was conducted as a result of the identification of recent reactor vessel head degradation as discussed in NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
During the call, the licensee indicated that during the refueling outage they had performed a 100% visual inspection of the reactor vessel head and head penetration nozzles and that there was no evidence of boric acid deposits or corrosion.
Docket No. 50-443 DISTRIBUTION PUBLIC J. Clifford D. Starkey S. Bloom PDI-2 Reading ACCESSION NO. ML021490112 OFFICE PDI-2/PM PDI-2/LA EMCB PDI-2/SC NAME DStarkey TClark SBloom JClifford DATE 5/30/02 5/30/02 5/29/02 5/31/02 OFFICIAL RECORD COPY