May 28, 2002 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer North Atlantic Energy Service Corporation c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874
SUBJECT:
BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE FOR SEABROOK STATION, UNIT NO. 1 (TAC NO. MB4577)
On March 18, 2002, the staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor (PWR) plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Section 50.54(f), of the Code of Federal Regulations (10 CFR 50.54(f)) if they are unable to provide the information, or they cannot meet the requested completion dates.
You provided your 15-day Bulletin response by letter dated April 2, 2002. The staff finds that you have provided the requested information, and has concluded that your plant does not appear to have conditions similar to those which lead to the degradation at Davis-Besse.
However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01.
We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.
Sincerely,
/RA/
Robert D. Starkey, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Docket No. 50-443 cc: See next page
Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer North Atlantic Energy Service Corporation c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874
SUBJECT:
BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE FOR SEABROOK STATION, UNIT NO. 1 (TAC NO. MB4577)
On March 18, 2002, the staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor (PWR) plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Section 50.54(f), of the Code of Federal Regulations (10 CFR 50.54(f)) if they are unable to provide the information, or they cannot meet the requested completion dates.
You provided your 15-day Bulletin response by letter dated April 2, 2002. The staff finds that you have provided the requested information, and has concluded that your plant does not appear to have conditions similar to those which lead to the degradation at Davis-Besse.
However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01.
We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.
Sincerely,
/RA/
Robert D. Starkey, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Docket No. 50-443 cc: See next page DISTRIBUTION:
PUBLIC JClifford OGC WBateman PDI-2 R/F DStarkey ACRS ALee EMCB R/F SBloom CCowgill, RI SCoffin TClark ACCESSION NO. ML021430500 OFFICE PDI-2/PM PDI-2/LA EMCB PDI-2/SC NAME DStarkey TClark SBloom JClifford DATE 5/28/02 5/28/02 5/28/02 5/28/02 OFFICIAL RECORD COPY
Seabrook Station, Unit No. 1 cc:
William J. Quinlan, Esq.
Assistant General Counsel Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Mr. Dan McElhinney Federal Emergency Management Agency Region I J.W. McCormack P.O. &
Courthouse Building, Room 401 Boston, MA 02109 Mr. Stephen McGrail, Director ATTN: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Philip T. McLaughlin, Attorney General Steven M. Houran, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Donald Bliss, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301 Mr. Daniel G. Roy Nuclear Training Manager Seabrook Station North Atlantic Energy Service Corp.
P.O. Box 300 Seabrook, NH 03874 Mr. James M. Peschel Manager - Regulatory Programs Seabrook Station North Atlantic Energy Service Corp.
P.O. Box 300 Seabrook, NH 03874 Mr. Gene F. St. Pierre Station Director Seabrook Station North Atlantic Energy Service Corporation P.O. Box 300 Seabrook, NH 03874 Mr. Frank W. Getman, Jr.
President and Chief Executive Officer BayCorp Holdings, LTD 20 International Drive, Suite 301 Portsmouth, NH 03801-6809
Seabrook Station, Unit No. 1 cc:
Mr. Bruce D. Kenyon President and Chief Executive Officer Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 Mr. Steve Allen Polestar Applied Technology, Inc.
77 Franklin Street, Suite 507 Boston, MA 02110