ML021430253
| ML021430253 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/20/2002 |
| From: | Mccollum W Duke Energy Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| TSC-2001-07 | |
| Download: ML021430253 (115) | |
Text
LAT w/o 3272 FINAL REPORT 9130/01 APPENDIX A-TRACER DATA SPREAD SHEETS
TEST G OCONEE Ul NORMAL CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8 CR9 CR10 CR11 CRUP CR2 CR3 CR5 CR6 CR7 CR8 CR9 CR10 CR11 CRUP CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8 CR9
=CR10..
CRUP MEAN 2.14
--SD 0.05
%SD 2.5%
MEAN 1.65 SD 0.04
%SD
_ MODE TEST 8/7/01 E TIME I-
-I
+
TIME(HR)
-I-4-
-f F
10 10.5 F
t 11 iE TIME IS ELAPSED TIME S ROOM AVGS TIME AVGS 0.0 MEAN
~2.76 SSD S 0.07 L
S %SD S2.5%
12.5 13 13.5 14 14.5 15 0.16666667 0.175 0.18333333 0.19166667 0.2 il 2.74 0.20833333 2.8 0.216666671 2.86 0.225 2.71 0.23333333 2.69 0.24166667 2.7 0.25 2.73 15.51 0.25833333 401 0.66666667 40.5 41 41.5 42 42.5 43 43.5 44 4-
+
4--
0.675 0.68333333 0.69166667 0.7 0.70833333 0.71666667 0.725 0.73333333 2.24 2.151 2.15' 2.17 2.171 2.18, 2.1 4--
4-
-- 4-------------
I 44.5 0.74166667 45 0.75 IF-45.5 0.75833333 70 1.16666667 70.5 1.175 71 1.18333333 71.51 1.19166667 72 1.2 72.5 1.20833333 7 3L 1.21666667 73.51 1.225 74; 1.23333333 74.5[ 1.24166667 7
1.25 75.5 1.25833333
--4
+I-
+/-
F I
T
-I-t F
1 T
.4.
I.
T CONC 2.87 2.85 2.76 2.75 2.671 4-S I
2 V
2.21 2.06 2.11 2.08 2.11 I-
-I 1.72 1.7 1.66 1.67 1.691 1.66 1.63 1.59 1.62; 11.5 12 i
i
TEST G OCONEE U1 NORMAL MODE TEST 817101 4
I-
-I-I
-f 100 1.666666671 1.32
.1 1-
+
-I 1-1 100.5 101 101.5 1.675 1.68333333 1.69166667 1.33 1.27 1.28
-I 102 1.7 102.5 1.70833333 103 1.71666667 103.5 1.725 1041 1.73333333 CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8 CR9 CR10 CR11 CRUP CRI CR2 CR3 CR4 CR5 CR6 OR7 CR9 CR10 CR11 CRUP CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8 CR9 CRI0 CR11 CRUP 105-1.75 105.5 1.75833333 130 2.16666667 130.5 2.175 13-1 2.18333333 131.51 2.19166667 132 2.2 132.51 2.20833333 133 133.5 134 134.5 2.21666667 2.225 2.23333333 2.24166667 1.26 1.31 1.3 1.25 1.2 1.26 1.24 1.261 1.01 1.03' 0.99 0.977 0.9421 1.01 1.001 0.9641 0.9271 0.961 3.2%
1351 2.25 0.951 135.5 2.25833333 0.977 160 2.66666667 0.771 160.5 2.675 0.787 161.51 2.69166667 0.751 162 2.71 0.769 1
162.5 2.70833333 0.738 163 163.5 164 164.5 165 165.5 166 I.
.1 I.
2.71666667 2.725 2.73333333 2.74166667 2.75 2.75833333 2.76666667 0.766 0.764 0.754 0.718 0.755 0.74 0.736 MEAN 1.27 SD 0.04
%SD 2.9%
MEAN 0.98 SD 0.03
%SD 104.51 1.74166667 4
+-i MEAN 0.75 SD 0.02
%SD 2.5%
I I
TEST H OCONEE U3, 1 FAN PRESSURIZATION TEST 8/8/01 MEAN CRE CONC SD
%SD TIME CR1 10 1.49 25 1.48 40 1.49 55 1.50 70 1.47 MEAN SD
%SD 1.49 0.01 0.8%
TIME RET 10 1.47 25 1.46 40 1.46 55 1.45 70 1.43 MEAN SD
%SD 1.45 0.02 1.0%
CR2 1.50 1.50 1.49 1.49 1.45 1.49 0.02 1.4%
S 1.50 1.49 1.52 1.51 1.51 1.51 0.01 0.8%
CR3 CR4 CR5 CR6 CR7 CR8 CR9 CR10 CR11 CRUP MEAN 1.49 1.48 1.48 1.51 1.49 1.45 1.49 1.48 1.48 1.46 1.48 1.49 1.49 1.48 1.49 1.48 1.50 1.48 1.47 1.50 1.47 1.49 1.48 1.51 1.51 1.50 1.49 1.50 1.48 1.48 1.47 1.49 1.49 1.49 1.50 1.48 1.50 1.51 1.49 1.49 1.48 1.47 1.48 1.49 1.47 1.48 1.47 1.49 1.48 1.48 1.48 1.48 1.48 1.50 1.48 1.48 1.49 1.48 1.50 1.49 1.48 1.48 1.48 1.48 1.48 0.01 0.01 0.02 0.01 0.01 0.02 0.01 0.00 0.01 0.02 0.6%
0.9%
1.0%
0.6%
0.8%
1.4%
0.4%
0.3%
0.8%
1.1%
BFIL BFAN R3 1.46 1.49 1.46 1.57 1.46 1.49 1.41 1.53 1.46 1.44 1.48 1.45 1.40 1.47 1.41 1.46 1.49 1.45 0.08 0.03 0.03 5.4%
1.8%
2.0%
1.49 PPM 0.01 0.9%
TEST I OCONEE U3, 2 FAN PRESSURIZATION TEST 8/9-10101 MEAN CRE CONC SD
%SD 0.968 PPM 0.009 1.0%
CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8 CR9 CR10 CR11 CRUP MEAN 0.991 0.987 0.984 0.980 0.961 0.969 0.968 0.966 0.971 0.969 0.980 0.964 0.974 0.975 0.975 0.975 0.979 0.969 0.968 0.965 0.971 0.967 0.959 0.980 0.969 0.971 0.971 0.958 0.967 0.964 1.000 0.974 0.966 0.963 0.968 0.970 0.972 0.958 0.969 0.965 0.966 0.968 0.969 0.969 0.965 0.968 0.975 0.973 0.972 0.967 0.960 0.968 0.968 0.950 0.958 0.960 0.952 0.953 0.974 0.951 0.963 0.958 0.966 0.959 0.959 0.974 0.967 0.010 0,014 1.0%
1.5%
0.970 0.970 0.970 0.966 0.968 0.010 0.009 0.018 0.008 0.003 1.0%
0.9%
1.9%
0.8%
0.4%
0.965 0.968 0.966 0.973 0.962 0.009 0.004 0.007 0.007 0.005 1.0%
0.4%
0.7%
0.7%
0.5%
RET S
AFIL AFAN BFIL BFAN R3 0.966 0.953 0.927 0.892 0.960 0.970 0.951 0.933 0.944 0.892 0.898 0.909 0.978 0.945 0.962 0.941 0.936 0.914 0.943 0.944 0.949 0.938 0.948 0.898 0.924 0.937 0.963 0.964 0.952 0.947 0.872 0.876 0.962 0.954 0.946 0.950 0.947 0.014 0.005 1.5%
0.5%
0.900 0.901 0.938 0,962 0.951 0.027 0.019 0.022 0.013 0.008 3.0%
2.1%
2.3%
1.4%
0.8%
TIME 10 25 40 55 70 MEAN SD
%SD TIME 10 25 40 55 70 MEAN SD
%SD
TEST J OCONEE UllU2 NORMAL MODE TEST 8110101 IME IS ELAPSED TIME ROOM A-VS TIME AVGS E TIME TIME(HR)
CONC S
101 0-.16666667 2.78 CR1__
- 10.
0.17 2.71_
CR2 CR3 11 0.18333333 CR415 0.1166667 2.66 OR5 12 0.2 n.68 CR6 MEAN TIME AVGS 12.5 0.20833333 2.67 CR7 2.67 0.21 13 0.21666667 2.64 CR8 i
- _14 0.23333333 2.67 CR9 0.05 14.5 0.24166667 2.67 CRI0
%SD 15.5 0.25833333 2.58 b-0.25 2.65 CRUP 1
40 0.66666667L 2.25 CR6 EN TIEAG 42).5 0.78333 2.15[
_R2
.5 _- 44 0.68333333 41 CR1
%D 415i 0.69166667 2.09 CR5U 42 0.7 2.10 CR5
_j
_A TIE V 42.5 0.708333331 2.15 itCR-7 2
0.71 I
V i
43 0.71666667 2.09 01 43.5 0.725 2.07 c_9 0.0 44.. 0.71333333 2.161 i
i 447.51 0.74166667 2.04 CRU-1:5 2.7%
____45_0._75 _
_2 1.10 7212 1.673 70 1.16666667 1.6 CR 70.5--
1.175 1.67
- R*.......
'71 1.18333333 1.661 CR4 71.5 1.191667 1.64
-5 AT 5
72 1.2 1.67/
CR6 MEAN ITME AVGS I
2.5 1.20833333 1.67/
_cRF7_
1.66 1.21 73 1.21666667 1.64/
R8 73.5 1.225 1.66
-aim 0--4 74 1.23333333 1.67
-/*
75 1.25 1.5_6 CIR102.e/
74.5 1*-_6667_66
TEST J OCONEE UllU2 NORMAL MODE TEST 8/10/01 CR1 100 1.66666667 1.39 CR2 100.5 1.675 1.31 CR3 101 1.68333333 1.3 CR4 101.5 1.69166667 1.28 CR4 102L 1.7 1.31 CR6 M-MEAN TIME AVGS 102.5 1.70833333 1.31 CR7 F
1.31 1.71 I
103 1.71666667 1.28 CR I
SDI 103.5 1.725 1.34 CR9 t
.3 104 1.73333333 1.32 CR10 I
%SD
_104.w 1.74166667 1.28 CRUP 5%
I 13 2.16666667 1.08
- I 13:0:--51 2.175T 1.04 CR2 131 Z.1333333
?F CR3 131.5 2.19166667 1.02 CR45 CR6 MEAN
-ITIME AVGS I
1331 2.216666671 1.03 CR7 1.02 2.21 I
3.F 22w 10 134.5 2.24166667 1.02 C9
-- 0.03 134 2.23333333 10 CR10
%SD 136 2.26666667 0.983 CRUP 2.5%
135 2.25 1.01 CR1 160 2.66666667 0.854 CR2 160.5 2.675 0.829 5R__161 2.68333333 0.803 CR3 161.
2.6916666t 0.791 CR4 CR5 162 2.7 0.789 MEAN TIME AVGS 162.5 2.70833333 0.809 CR7 C
0.81 2.71 163 2.71666667 0.78 CR8 163.5 CR9 0.02 1
164 2.73333333 0.822 CR10
-%SD---
164.5 2.74166667 0.784 CRUP 2.9%
L 165 2.75 0.792 CR1 I 190 3.16666667 0.6561 S190.5 3.175 0.64 CR1
.3 C6R-4 191.5 1191666671 0.623 CR5 123.2!
0.614 CR6 MEAN TIME AVGS i
192.51 3.20833333 0.64*
CGR7 0.33.21
- 193 3.21666667 0.62 CR D193.5 3.225L 0.629 CR9 0.01 194 3.23333333 0.612 CRI 0
-%S D
194.5 3.24166667 0.612 ICRUP 2.2%
19532 0.618
TEST K OCONEE UI/U2, I FAN PRESSURIZATION TEST 8/11101 MEAN CRE CONC 1.53 PPM SD 0.01
%SD 0.9%
CR1 1.53 1.53 1.54 1.54 1.53 1.53 0.01 0.4%
RET 1.55 1.55 1.53 1.55 1.51 CR2 1.51 1.54 1.53 1.53 1.50 1.52 0.02 1.1%
S 1.49 1.48 1.49 1.47 1.47 TIME 10 25 40 55 70 MEAN SD
%SD TIME 10 25 40 55 70 MEAN SD
%SD CR3 CR4 1.53 1.51 1.53 1.52 1.52 1.54 1.54 1.56 1.49 1.51 1.52 1.53 0.02 0.02 1.3%
1.4%
BFIL BFAN 1.49 1.50 1.49 1.51 1.55 1.52 1.52 1.52 1.49 1.51 CR5 CR6 CR7 CR8 CR9 CR10 CRUP MEAN 1.52 1.53 1.52 1.53 1.51 1.53 1.52 1.52 1.53 1.53 1.54 1.53 1.54 1.55 1.52 1.53 1.53 1.54 1.53 1.52 1.52 1.53 1.53 1.53 1.53 1.54 1.54 1.54 1.52 1.53 1.53 1.54 1.51 1.52 1.51 1.52 1.52 1.50 1.49 1.51 1.52 1.53 1.53 1.53 1.52 1.53 1.52 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.6%
0.5%
0.9%
0.5%
0.7%
1.2%
1.1%
R3 1.50 1.51 1.51 1.47 1.48 1.51 1.51 1.49 0.03 0.01 0.02 1.9%
0.6%
1.2%
1.54 1.48 0.02 0.01 1.2%
0.7%
TEST LOCONEE UI/U2, 2 FAN PRESSURIZATION TEST 8/12/01 MEAN CRE CONC SD
%SD 0.831 PPM 0.006 0.7%
CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8 CR9 CR10 CRUP MEAN 0.830 0.831 0.832 0.829 0.836 0.823 0.826 0.828 0.832 0.838 0.831 0.831 0.831 0.832 0.827 0.831 0.840 0.836 0.830 0.843 0.827 0.838 0.841 0.834 0.829 0.831 0.831 0.827 0.841 0.842 0.835 0.830 0.829 0.824 0.828 0.832 0.837 0.835 0.830 0.820 0.834 0.830 0.824 0.823 0.829 0.830 0.828 0.829 0.814 0.829 0.828 0.822 0.839 0.840 0.833 0.829 0.834 0.830 0.819 0.829 0.828 0.832 0.009 0.002 1.0%
0.3%
0.830 0.826 0.838 0.834 0.830 0.002 0.005 0.003 0.008 0.005 0.2%
0.6%
0.3%
0.9%
0.6%
0.831 0.830 0.832 0.829 0.007 0.003 0.006 0.008 0.9%
0.3%
0.7%
1.0%
RET S
AFIL AFAN" BFIL BFAN R3 0.844 0.815 0.766 0.799 0.837 0.854 0.837 0.827 0.818 0.767 0.804 0.850 0.854 0.822 0.837 0.830 0.779 0.778 0.863 0.838 0.818 0.826 0.817 0.774 0.767 0.892 0.848 0.812 0.833 0.815 0.774 0.774 0.857 0.854 0.813 0.833 0.819 0.007 0.006 0.9%
0.8%
0.774 0.784 0.866 0.850 0.820 0.005 0.016 0.018 0.007 0.010 0.6%
2.1%
2.1%
0.8%
1.2%
TIME 10 25 40 55 70 MEAN SD
%SD TIME 10 25 40 55 70 MEAN SD
%SD
LAT w/o 3272 FINAL REPORT 9/30101 APPENDIX B-ANSI/ASME UNCERTAINTY CALCULATIONS
LAT w/o 3272 FINAL REPORT 9/30/01 TEST G 8/7/01 UNIT 3 CRE HVAC in NORMAL MODE, AHU 3-13 Operating
LAT w/o 3272 FINAL REPORT 9/30/01 EXPLANATION OF TRACER DATA SPREAD SHEETS The tracer data sheets on the following pages contain two pages of data for the concentration decay test. The first column contains the sample location identifier. The second column contains concentration mean and standard deviation values for the entire CRE for a given sample interval. The third column displays mean sampling times in minutes and hours for each sample level and sampling interval.
The fourth column contains elapsed time in minutes at which each sample is taken, while the fifth column merely converts this time to hours. The sixth column provides the measured concentration for each sample point, while the seventh column provides the natural logarithm of each concentration in column six.
The EXCEL regression is provided on the next page and uses the time in hours and the natural logarithm of the concentration values to calculate a value for the air exchange rate.
A plot of the average measured concentration in the CRE at each time versus the regression calculation of concentration decay is displayed on the same page.
Following that is the ANSI Error Analysis Spreadsheet for the test.
TEST G OCONEE U3 NORMAL MODE TEST 817101 E TIME IS ELAPSED TIME ROOM AVGS TIME AVGS E TIME 1TIME(HR)
CONC LN CONC CR1 10 0.16666667 2.87 1.054312 CR2 10.5 0.175 2.85 1.047319 CR3 Ill 0.18333333 2.76 1.015231 CR4 11.5 0.19166667 2.75 1.011601 CR5 12 0.2 2.74 1.007958 CR6 MEAN MEAN 12.5 0.20833333 2.8 1.029619 CR7 CR8 CR9 CR10 OR11 CRUP CR1 CR2 CR3 CR4 CR5 CR6 CR7 CR8 CR9 CR10 CR11 CRUP CR1 CR2 CR3 i
CR4 CR5 CR6
-CR7 CR8 CR9 CR10 CR11 CRUP 2.76 SD 0.07
%SD 2.5%
MEAN 2.14 SD 0.05
%SD 2.5%
MEAN 1.65 SD 0.04
%SD 2.4%
-I
-I 0.21 13 0.21666667 2.86
+
F I-
-I I-MEAN 0.71 MEAN 1.21 13.5 0.225 2.71 F
I-
-t 14 0.23333333 2.69 1.050822 0.996949 0.989541 14.5 0.24166667 2.7 0.993252 15 0.25 2.73 1.004302 15.5 0.25833333 2.67 0.982078 40 0.66666667 2.21 0.792993 40.51 0.675 2.24 0.806476 411 0.68333333 41.51 0.69166667 42 42.5 43 43.5 44.5 45 45.5 70 70.5 71 0.7 0.70833333 0.71666667 0.725 0.73333333 0.74166667 0.75 0.75833333 1.16666667 1.175 2.15 2.15 2.1 2.17 2.18 2.1 2.06 2.11 0.765468 0.765468 0.741937 0.774727 0.779325 0.741937 0.722706 0.746688 2.08 0.732368 2.11 0.746688 1.72 1.7 1.183333331 1.66 71.5' 1.19166667i 1.67 S 72 1.2 1.63 72.5 1.20833333 1.69 73 1.21666667 1.66 73.51 1.225 1.63 74i 1.23333333 1.59 74.5t 1.24166667 1.63 1.25
- 75.
S75.51 1.25833333 1.62 1.61 0.542324 0.530628 0.506818 0.512824 0.48858 0.524729 0.506818 0.48858 0.463734 0.48858 0.482426 0.476234
{
-i T
I
TEST G OCONEE U3 NORMAL MODE TEST 8/7/01 SI CR1 1001 1.66666667 1.32 0.277632 CR2 100.5 1.675 1.33 0.285179 CR3 101 1.68333333 1.27 0.239017 CR4 101.5 1.69166667 1.28 0.24686 CR5 102 1.7 1.26 0.231112 CR6 102.5 1.70833333 1.31 0.270027 CR7 MEAN MEAN 103 1.71666667 1.3 0.262364 CR8 1.27 1.75 103.5 1.725 1.25 0.223144 CR9 SD 104 1.73333333 1.2 0.182322 CR10 0.04 104.5 1.74166667 1.26 0.231112 CR11
%SD i
105 1.75 1.24 0.215111 CRUP 2.9%
105.5 1.75833333 1.26 0.231112 CR1 130 2.16666667 1.01 0.00995 CR2
__130.5 2.175 1.03 0.029559 CR3 131 2.18333333 0.99
-0.01005 CR4 131.5 2.19166667 0.977 -0.023269 CR5 132 2.2 0.9421 -0.05975 CR6 MEAN MEAN 132.5 2.20833333 1.01 0.00995 CR7 0.98 2.21 133 2.21666667 1.00 0
CR8 SD 133.5 2.225 0.964 -0.036664 CR9 0.03 134 2.23333333 0.9271 -0.075802 CR10
%SD 134.5 2.24166667 0.961 -0.039781 CR11 3.2%
135 2.25 0.951 -0.050241 CRUP 135.5 2.25833333 0.977 -0.023269 CR1 160 2.66666667 0.771 -0.260067 CR2 160.5 2.675 0.787 -0.239527 CR3 161.5 2.69166667 0.75 -0.287682 CR4 162 2.7 0.769 -0.262664 CR5 1
162.5 2.70833333 0.738 -0.303811 CR6 163 2.71666667 0.766 -0.266573 CR7 MEAN MEAN 163.5 2.725 0.764 -0.269187 CR8 0.75 2.72 1641 2.73333333 0.754 -0.282363 CR9 SD 164.51 2.74166667 0.718 -0.331286 CR10 0.02 165 2.75 0.755 -0.281038 CR11
%SD 165.5 2.75833333 0.74 -0.301105 CRUP 2.5%
166 2.76666667 0.7361-0.306525
TEST G OCONEE U3 NORMAL MODE TEST 8/7101
SUMMARY
OUTPUT Regression Statistics Multiple R 0.99911822 R Square 0.99823721 Adjusted R Square 0.99821203 Standard Error 0.01893052 Observations 72 ANOVA df SS MS F
Significance F Regression 1
14.20550426 14.20550426 39639.806 3.93751E-98 Residual 70 0.025085524 0.000358365 Total 71 14.23058979 Coefficients Standard Error t Stat P-value Lower 95%
Upper 95%
Intercept 1.12809917 0.004418797 255.2955258 1.11 E-105 1.119286163 1.136912175 TIME(HR)
-0.5188421 0.00260597
-199.0974789 3.938E-98
-0.524039502 -0.51364462
-1
_I_
______t1
____________I
-i_
.1
.1 I.
.1
1 Unit 3 Concentration Decay Test 8/7/01 i 000%
E
- 0.
0 Cu 0
0 U.
co 1.00 1.50 2.00 2.50 3.00 Time (Hrs) 10
- Measured Regression 1
0.1 0.00 0.50
Inleakage Error Analysis-Concentration Decay Test This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
- where, Date Location Ventilation CRE Volume
[ (BA2) + (t95*S)A2]AO.5 Urss is the measurement uncertainty (Root Sum Square)
B are bias errors in measurement S are random errors in measurement t95 is Student's t at 95 % confidence 8/7-8/01 Oconee U3 AHU 3-13 54000 Test G
Cu. Ft.
Test Parameters Injection Concentration Injection Duration Injection Flow Rate Calibration Point Value
Background
Regression Value =
Number of Values =
RMS Error=
10000 ppm 30.00 min 15.00 SLPM 2.16 ppm
<0.3 ppb A
0.5188 72 0.002606 (From Spread Sheet)
Bias Errors Calibration Gas Error Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Error Analyzer SN100 Numeric Bias Value Error 2.00%
0.9697 0.9902 0.9492 Analyzer SN 123 Numeric Bias Value Error 2.00%
1.0436 1.0611 1.0261 1.99%
1.83%
USE LARGER ANALYZER ERROR IN BIAS CALC Volumetric Error 2%
Inleakage Error Analysis-Concentration Decay Test Date Location Ventilation CRE Volume 8/7-8/01 Oconee U3 AHU 3-13 54000 Inleakage Error Bias Error Random Error Urss Squared Sum 0.001195169 0.00002699 Number Observations Student t 0.035 Inleakage Max-95 Min-95 467 SCFM 483 SCFM 451 SCFM G
Test Cu. Ft.
72 1.993462
LAT w/o 3272 FINAL REPORT 9/30/01 TEST H 8/8/01 AHU 3-13 and Fan 3A Operating
Inleakage Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU FAN Time 8/8-9/01 OCONEE 3A 24:00-01:00 Test H
Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb) 10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppb Measured Data Concentration (ppm)
Sample #
Time Makeup Return CFM Delta ppm 1
0.0 1.46 1.47
-4.4
-0.01 2
10.0 1.49 1.49
-1.4 0.00 3
20.0 1.47 1.46 9.4 0.01 4
30.0 1.46 1.46
-2.2 0.00 5
40.0 1.48 1.44 26.4 0.04 6
50.0 1.46 1.45 8.8 0.01 7
60.0 1.45 1.43 15.8 0.02 Random Error Makeup Return CFM Delta ppm Average 1.47 1.46 7.4 0.01 Std Dev.
0.01 0.02 11.13 0.02
% Dev.
0.86%
1.36%
150.48%
149.46%
Inleakage Measurement & Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error Analyzer sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error "Analyzer Error 0.9816 0.9985 0.9647 1.66%
2.31%
Inleakage Error Bias Error Random Error Urss Squared Sum 0.001198465 13.55804878 Degrees of Freedom Student t factor 3.682 Inleakage Max-95 Min-95 7 SCFM 35 SCFM
-20 SCFM Test 8/8-9/01 OCONEE 3A 24:00-01:00 H
Numeric Value 1.00%
Bias Error 1.00%
1.29%
2.00%
6 2.446914 I
I I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[(BA2 ) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/8-9/01 OCONEE 3A 21:25 Test HF1 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.50 936.3 2
A2 1.51 930.1 3
A3 1.36 1032.7 4
B1 1.43 982.1 5
B2 1.50 936.3 6
B3 1.31 1072.1 7
Cl 1.45 968.6 8
C2 1.38 1017.7 9
C3 1.48 948.9 Random Error Makeup CFM Average 1.44 978.3 Std Dev.
0.07 50.11
% Dev.
4.96%
5.12%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MWU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 1.0453 1.0649 1.0257 2.05%
-0.80%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000730569 0.038390454 Degrees of Freedom Student t factor 0.198 Flowrate Max-95 Min-95
+
960 SCFM 1150 SCFM 770 SCFM Test 8/8-9/01 OCONEE 3A 0:00 HF4 Bias Error 1.00%
1.29%
2.00%
Numeric Value 1.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location M/U AHU Time 8/8-9/01 OCONEE 3A 0:10 Test HF5 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.35 1040.3 2
A2 1.46 961.9 3
A3 1.39 1010.4 4
B1 1.43 982.1 5
B2 1.50 936.3 6
B3 1.54 912.0 7
Cl 1.48 948.9 8
C2 1.62 866.9 9
C3 1.62 866.9 Random Error Makeup CFM Average 1.49 944.0 Std Dev.
0.09 59.53
% Dev.
6.31%
6.31%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 1.0453 1.0649 1.0257 2.05%
-0.76%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000725269 0.021146559 Degrees of Freedom Student t factor 0.148 Flowrate Max-95 Min-95
+
944 SCFM 1084 SCFM 804 SCFM Test 8/8-9/01 OCONEE 3A 0:10 HF5 Bias Error 1.00%
1.29%
2.00%
Numeric Value 1.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MU AHU Time 8/8-9/01 OCONEE 3A 0:20 Test HF6 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.42 989.0 2
A2 1.43 982.1 3
A3 1.58 888.9 4
Bi 1.40 1003.2 5
B2 1.56 900.3 6
B3 1.46 961.9 7
Cl 1.46 961.9 8
C2 1.46 961.9 9
C3 1.50 936.3 Random Error Makeup CFM Average 1.4 7 952.5 Std Dev.
0.06 38.83
% Dev.
4.17%
4.08%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppm
Flowrate Error Analysis Date 8/8-,
Location OCO MU AHU Time 0:
Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error Flowrate Error 9/01 NEE 20 Jumeric Value 1.00%
1.0453 1.0649 1.0257 2.05%
Bias Error Random Error Urss Squared Sum 0.00072812 0.008839245 Degrees of Freedom Student t factor 0.098 Flowrate Max-95 Min-95 953 SCFM 1046 SCFM 859 SCFM Test HF6 Bias Error 1.00%
1.29%
2.00%
-0.78%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/8-9/01 OCONEE 3A 0:30 Test HF7 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.51 930.1 2
A2 1.46 961.9 3
A3 1.44 975.3 4
B1 1.45 968.6 5
B2 1.47 955.4 6
B3 1.49 942.6 7
C1 1.40 1003.2 8
C2 1.51 930.1 9
C3 1.38 1017.7 Random Error Makeup CFM Average 1.46 964.1 Std Dev.
0.05 30.40
% Dev.
3.11%
3.15%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/8-9/01 Test OCONEE 3A 0:30 Numeric Value 1.00%
1.0453 1.0649 1.0257 2.05%
-0.81%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.00073207 0.005288409 Degrees of Freedom Student t factor 0.078 Flowrate Max-95 Min-95 964 SCFM 1039 SCFM 889 SCFM HF7 Bias Error 1.00%
1.29%
2.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[(BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/8-9/01 OCONEE 3A 0:40 Test HF8 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.41 996.0 2
A2 1.47 955.4 3
A3 1.45 968.6 4
B1 1.50 936.3 5
B2 1.42 989.0 6
B3 1.44 975.3 7
Cl 1.45 968.6 8
C2 1.65 851.2 9
C3 1.53 917.9 Random Error Makeup CFM Average 1.48 948.9 Std Dev.
0.07 44.69
% Dev.
5.00%
4.71%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppm
Flowrate Error Analysis Date Location M/U AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 1.0453 1.0649 1.0257 2.05%
-0.77%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000726921 0.011795692 Degrees of Freedom Student t factor 0.112 Flowrate Max-95 Min-95
]Ii 949 SCFM 1055 SCFM 843 SCFM Test 8/8-9/01 OCONEE 3A 0:40 HF8 Bias Error 1.00%
1.29%
2.00'%
Numeric Value 1.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 08/10/01 OCONEE 1A 0:50 Test Parameters Test HF9 8/8-9/01 OCONEE 3A Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.40 1003.2 2
A2 1.56 900.3 3
A3 1.41 996.0 4
B1 1.42 989.0 5
B2 1.46 961.9 6
B3 1.49 942.6 7
Cl 1.40 1003.2 8
C2 1.491 942.6 9
C3 1.54 912.0 Random Error Makeup CFM Average 1.46 959.7 Std Dev.
0.06 39.28
% Dev.
4.14%
4.09%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppm
Flowrate Error Analysis Date Location WMU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/10/2001 Test OCONEE 1A 0:50 Numeric Value 1.00%
1.0453 1.0649 1.0257 2.05%
-0.80%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000730569 0.008906103 Degrees of Freedom Student t factor 0.098 HF9 Bias Error 1.00%
1.29%
2.00%
8 2.306006 Flowrate 960 SCFM Max-95 1054 SCFM Min-95 866 SCFM
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model
[ (B^2) + (t95*S)A2]AO.5 Urss is the measurement uncertainty (Root Sum Square) t95 is Students t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/8-9/01 OCONEE 3A 1:00 Test HFI0 Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.40 1003.2 2
A2 1.37 1025.1 3
A3 1.36 1032.7 4
BI 1.35 1040.3 5
B2 1.54 912.0 6
B3 1.56 900.3 7
Cl 1.37 1025.1 8
C2 1.48, 948.9 9
C3 1.65 851.2 Random Error Makeup CFM Average 1.45 966.3 Std Dev.
0.11 69.67
% Dev.
7.47%
7.21%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppm Urss =
- where, Date Location MIU AHU Time Test Parameters
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error Flowrate Error Bias Error Random Error Urss Squared Sum 0.00073283 0.02764364 Degrees of Freedom Student t factor 0.168 Flowrate Max-95 Min-95 liz' 966 SCFM 1129 SCFM 804 SCFM Test 8/8-9/01 OCONEE 3A 1:00 HF10 Bias Error 1.00%
1.29%
2.00%
Numeric Value 1.00%
1.0453 1.0649 1.0257 2.05%
-0.81%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/8-9/01 OCONEE 3A 24:00-01:00 Test 7 Test Avg Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Time Supply CFM 1
2230.0 1.46 959.7 2
2230.5 1.49 944.0 3
2231.0 1.47 952.5 4
2232.0 1.46 964.1 5
2232.5 1.48 948.9 6
2233.0 1.46 959.7 7
2233.0 1.45 966.3 Random Error Supply CFM Average 1.47 954.8 Std Dev.
0.01 7.65
% Dev.
0.80%
0.80%
10270 ppm 5.00 SLPM 3.87 SLPM 2.16 ppb
Flowrate Error Analysis Date Location MIU AHU Time 8/8-9/01 OCONEE 3A 24:00-01:00 Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error Test Numeric Value 7 Test Avg Bias Error 1.00%
1.00%
1.29%
2.00%
1.0453 1.0649 1.0257 2.05%
-0.79%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000728889 0.000384668 Degrees of Freedom Student t factor 0.033 Flowrate Max-95 Min-95 I
1
2.446914
LAT w/o 3272 FINAL REPORT 9/30/01 TEST I 8/9/01 AHU 3-13 and Fans 3A & 3B Operating
Inleakage Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
- where, Date Location MIU FAN Time
[ (B^2) + (t95*S)A2]AO.5 Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/9-10/2001 OCONEE 3A & 3B 22:45-23:45 Test Test Parameters 10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppb Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Time Makeup Return CFM Delta ppm 1
0.0 0.941 0.966
-46.5
-0.025 2
10.0 0.935 0.958
-43.8
-0.023 3
20.0 0.952 0.933 37.1 0.019 4
30.0 0.982 0.962 36.3 0.020 5
40.0 0.943 0.931 23.3 0.012 6
50.0 0.938 0.938 0.2 0.000 7
60.0 0.913 0.927
-28.5 0.011]
Random Error Makeup Return CFM Delta ppmr Average 0.9435 0.9450
-2.8 0.002 Std Dev.
0.02 0.02 36.66 0.02
% Dev.
2.21%
1.73%
889.45%
I
Inleakage Measurement & Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error Analyzer sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-10/2001 Test OCONEE 3A & 3B 22:45-23:45 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
Inleakage Error Bias Error Random Error Urss Squared Sum 0.001735936
- VALUE!
Degrees of Freedom Student t factor
- VALUE!
Inleakage Max-95 Min-95
- VALUE!
- VALUE!
-3 SCFM SCFM SCFM Bias Error 1.00%
1.06%
2.00%
3.35%
6 2.446914 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location M/U AHU Time 8/9-10/2001 OCONEE 3A & 3B 22:45 Test IF4 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.959 1779.4 2
A2 0.929 1836.9 3
A3 0.940 1815.4 4
B1 0.907 1881.5 5
B2 1.000 1706.5 6
C1 0.891 1915.2 7
C2 0.938 1819.3 8
C3 0.966 1766.5 10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppm Random Error Makeup CFM Average 0.941 1813.0 Std Dev.
0.03 65.85
% Dev.,
3.64%,
3.63%,
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-10/2001 Test OCONEE 3A & 3B 22:45 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
-2.21%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.00109836 0.00737601 Degrees of Freedom Student t factor 0.092 Flowrate Max-95 Min-95 1813 SCFM 1980 SCFM 1646 SCFM IF4 Bias Error 1.00%
1.06%
2.00%
7 2.364623 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/9-10/2001 OCONEE 3A & 3B 22:55 Test IF5 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.945 1805.8 2
A2 0.982 1737.8 3
A3 0.932 1831.0 4
B1 0.970 1759.3 5
B2 0.933 1829.0 6
B3 0.954 1788.8 7
Cl 0.904 1887.7 8
C2 0.889 1919.5 9
C3 0.906 1883.5 Random Error Makeup CFM Average 0.935 1825.1 Std Dev.
0.03 61.17
% Dev.
3.35%
3.35%
10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-1012001 Test OCONEE 3A & 3B 22:55 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
-2.22%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.001106197 0.005972551 Degrees of Freedom Student t factor 0.084 Flowrate Max-95 Min-95 1825 SCFM 1979 SCFM 1672 SCFM IF5 Bias Error 1.00%
1.06%
2.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU AHU Time 8/9-10/2001 OCONEE 3A & 3B 23:05 Test IF6 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM I
Al 1.010 1689.6 2
A2 0.925 1844.8 3
A3 0.939 1817.3 4
B1 0.937 1821.2 5
B2 0.967 1764.7 6
B3 0.879 1941.4 7
C1 0.919 1856.9 8
C2 0.945 1805.8 9
C3 1.050 1625.2 Random Error Makeup CFM Average 0.952 1791.9 Std Dev.
0.05 93.47
% Dev.
5.35%
5.22%
10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-10/2001 Test OCONEE 3A & 3B 23:05 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
-2.17%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.001084741 0.014467606 Degrees of Freedom Student t factor 0.125
"'F 1792 SCFM 2015 SCFM 1568 SCFM IF6 Bias Error 1.00%
1.06%
2.00%
8 2.306006 IFlowrate Max-95 Min-95 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss -
[(BA2) + (t95"S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/9-10/2001 OCONEE 3A & 3B 23:15 Test IF7 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.080 1580.1 2
A2 0.987 1729.0 3
A3 1.020 1673.0 4
B1 0.967 1764.7 5
B2 0.944 1807.7 6
B3 0.959 1779.4 7
C1 0.900 1896.1 8
C2 0.995 1715.1 9
C3 0.987 1729.0 Random Error Makeup CFM Average 0.982 1737.6 Std Dev.
0.05 88.05
% Dev.
5.12%
5.07%
10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-10/2001 Test OCONEE 3A & 3B 23:15 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
-2.09%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.001049844 0.013655066 Degrees of Freedom Student t factor 0.121 Flowrate Max-95 Min-95 1738 SCFM 1948 SCFM 1527 SCFM IF7 Bias Error 1.00%
1.06%
2.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/9-10/2001 Test OCONEE 3A & 3B 23:25 IF8 Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.960 1777.6 2
A2 0.979 1743.1 3
A3 1.000 1706.5 4
Bi 0.962 1773.9 5
B2 0.909 1877.3 6
B3 0.913 1869.1 7
Cl 0.926 1842.8 8
C2 1.010 1689.6 9
C3 0.828 2061.0 Random Error Makeup CFM Average 0.943 1809.6 Std Dev.
0.06 113.93
% Dev.
5.96%
6.30%
10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppm Date Location MWU AHU Time Test Parameters
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-10/2001 Test OCONEE 3A & 3B 23:25 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
-2.20%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.001096186 0.021079007 Degrees of Freedom Student t factor 0.149 1=
-F--
1810 SCFM 2079 SCFM 1540 SCFM IF8 Bias Error 1.00%
1.06%
2.00%
8 2.306006 I Flowrate Max-95 Min-95 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (B^A2) + (t95"S)^2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/9-10/2001 Test OCONEE 3A & 3B 23:45 IF9 Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.040 1640.8 2
A2 0.921 1852.9 3
A3 0.891 1915.2 4
Bi 0.982 1737.8 5
B2 0.884 1930.4 6
B3 0.913 1869.1 7
C1 0.896 1904.6 8
C2 0.841 2029.1 9
C3 0.848 2012.4 "Random Error Makeup OEM Average 0.913 1869.3 Std Dev.
0.06 123.66
% Dev.
6.93%
6.62%
10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppm Test Parameters
Flowrate Error Analysis Date Location MU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-10/2001 Test OCONEE 3A & 3B 23:45 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.001134866 0.023270936 Degrees of Freedom Student t factor 0.156 Flowrate Max-95 Min-95 1869 SCFM 2161 SCFM 1577 SCFM IF9 Bias Error 1.00%
1.06%
2.00%
-2.29%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU AHU Time 8/9-10/2001 OCONEE 3A & 3B 23:35 Test IF10 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.971 1757.4 2
A2 0.953 1790.6 3
A3 0.983 1736.0 4
B1 0.965 1768.4 5
B2 0.921 1852.9 6
B3 0.943 1809.6 7
Cl 0.909 1877.3 8
C2 0.941 1813.5 9
03 0.857 1991.2 Random Error Makeup CFM Average 0.938
- 11.
Std Dev.I 0.04 77.70
% Dev.
4.09%
4.27%
10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/9-10/2001 Test OCONEE 3A & 3B 23:35 Numeric Value 1.00%
1.0476 1.0729 1.0222 2.66%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.001102282 0.009702224 Degrees of Freedom Student t factor 0.104 Flowrate Max-95 Min-95 1819 SCFM 2008 SCFM 1630 SCFM IF10 Bias Error 1.00%
1.06%
2.00%
-2.21%
8 2.306006 m
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location M/U AHU Time 8/9-10/2001 OCONEE 3A & 3B Test 7 Test Avg Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb) 10210 ppm 5.00 SLPM 4.73 SLPM 2.16 ppb Measured Data Concentration (ppm)
Sample #
Time Supply CFM 1
2230.0 0.941 1813.0 2
2230.5 0.935 1825.1 3
2231.0 0.952 1791.9 4
2232.0 0.982 1737.6 5
2232.5 0.943 1809.6 6
2233.0 0.938 1819.1 7
2233.0 0.913 1869.3 Random Error Supply CFM Average 0.949 1798.9 Std Dev.
0.02 32.30
% Dev.
1.84%
1.80%
Flowrate Error Analysis Date Location MWU AHU Time Bias Errors 8/9-10/2001 Test OCONEE 3A & 3B 0:00 Numeric Value Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn123 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 1.0476 1.0729 1.0222 2.66%
-2.19%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.001089247 0.001930626 Degrees of Freedom Student t factor 0.055 Flowrate Max-95 Min-95 17991SCFM 1898 SCFM 1700 SCFM 7 Test Avg Bias Error 1.00%
1.06%
2.00%
1.00%
6 2.446914 I
LAT w/o 3272 FINAL REPORT 9/30/01 TEST J 8/10/01 UNIT 1 & 2 CRE HVAC in NORMAL MODE, AHU 1-11 Operating
LAT w/o 3272 FINAL REPORT 9/30/01 EXPLANATION OF TRACER DATA SPREAD SHEETS The tracer data sheets on the following pages contain two pages of data for the concentration decay test. The first column contains the sample location identifier. The second column contains concentration mean and standard deviation values for the entire CRE for a given sample interval. The third column displays mean sampling times in minutes and hours for each sample level and sampling interval.
The fourth column contains elapsed time in minutes at which each sample is taken, while the fifth column merely converts this time to hours. The sixth column provides the measured concentration for each sample point, while the seventh column provides the natural logarithm of each concentration in column six.
The EXCEL regression is provided on the next page and uses the time in hours and the natural logarithm of the concentration values to calculate a value for the air exchange rate.
A plot of the average measured concentration in the CRE at each time versus the regression calculation of concentration decay is displayed on the same page.
Following that is the ANSI Error Analysis Spreadsheet for the test.
TEST J OCONEE UllU2 NORMAL MODE TEST 8110/01 fE TIlME IS E-LAPSED TIME ROOM AVGS
=TIME AVGS E TIME TIME(HR)
'CONC LN CONC CR110 0.16666667 2.78 1.022451 CR2 10.5 0.175 2.71 0.996949 CR73 11 0.18333333 2.69 0.989541 CR4
- 11.
19166667 1.64 0.9466 C7R25 12 0.2 2.68 0.985817 CR6 MEAN TIME AVGS 12.5 0.20833333 2.67 0.982078 CR7 0.21 13 0.21666667 2.64 0.970779 CR8 SD 14 0.23333333 2.67 0.982078 C-R 0.05 14.5 0.24166667 2.67 0.982078 CR10
%SD 15.5 0.25833333 2.58 0.947789 CRUP 1.8%
15 0.25 2.65 0.97456 40 0.66666667 2.25 0.81093 C240.5 0.675
-2.151-0.765468 CR3 41 0.683333333 f2. 14 0.760806 R441.5 0.691666667 2.09 0.737164 CR I42 0.7 22.10- 0.741937 tR6 M--NE-AN
-TIME A-VGS 42.5 0.708333333F 2.15 0.765468 CR
.20.71 43 0.71666667 2.09 0.737164 CR8 SD 43.5 0.725 2-.07i 0 727549 CR
.644 0.73333333 2.16 0.770108, CR0%SD
-44.5 6.7416-6667 2.041 0.71295 C-RUP
-2.7%--
45 0.75 2.101 0.741937 CR1 70 1.166666667 1.773 0.548121 C270.5 1.1775 11.667 0.512824 C371 1.18333333 1.66 0.506818 C471.5 1.1911666667 1.664 0.494696 CR572
.2 1.67 0.512824 CR6 MEAN TIME AVGS 72.5 1.20833333 1.67 0.512824 CR7 1.66 1.21 73 1.21666667 1.64 0.494696 CR D73.5 1.225 1.66 0.50-6818 CR9 0.04 74 1.23333333 1.67 0.512824
&RIO
%SD 75 1.25!
1.56 0.444686 CRUP 2.4%
74.5 1.24166667 1.66 0.506818
TEST J OCONEE Ul1U2 NORMAL MODE TEST 8/10101 CR1 100 1.66666667 1.39 0.329304 CR2 105 1.675 1.31 0.25462 CR3 101 1.68333333 1.3 0.262364 CR4 101.5 1.69166667 1.28 0.24686 CR5 102 1.27 1.331 0.270027 CR6 MEAN TI2E AVGS 102.5 1.70833333 1.31 0.2700279 CR7 1.31 1.71 103 1.7166666667 01.288 0.24686 CR8 SD 103.5 1.725 1.34 0.29267 CR93 003 104 1.73333333 1.32 0.277632 CR1
_0_
%SD 104.5 1.74166667 1.28 0.24686 CRUP
_2.5%_
105 1.75 1.29 0.254642 CRI 130 2.16666667 1.08 0.076961 C2130.5 2.175 1.04 0.039-221 C3131 2.18333333 1.02 0.019803 CR4 131.5 2.1916666-7
-1.02 0.019803 CR5 132.5-2.2083333 1--
0 CR6 MEAN TIMEAVGS 133! 2.21666667 1.03 0.029559 CR7 1.02 2.21 133.5 2.225 1.00 -0.005013 CR8 SD--
134.5 2.24166667 1.02 0.019803 CR9 0.03 134 2.23333333 1.01 0.00995
&RIO
%SD 136 2.26666667 0.983.- 0.017146 CRUP 2.5%
135 2.25 1.01 0.00995 CR1 160 2.66666667 0.854 -0.157824 CR2 160.5 2.675 0.829 -0.187535 C3161 2.68333333 0.803 -0.219401 CR4 161.5 2.69166667 0.791 -0.234457 CfR5 162 2.7 0.789 -0.236989 CR6 MEAN TIME AVGS 162.5 2.70833333 0.8091 -0.211956 CR7 0.81 2.Y71163 2.71666667 0.78 -0.248461 CR8 SD 163.5 2.725 0.826 -0.191161 CR9 0.02 164 2.73333333 0.822 -0.196015 CR10
%SD 164.5 2.74166667 0.784 -0.243346 CRUP 2.9%
165 2.75 0.792 -0.233194 CR1 190 3.16666667 0.656 -0.421594 CR2 190.5 3.175 0.64 -0.446287 CR3 191 3.18333333 0.633 -0.457285 CR4 191.5 3.19166667 0.623 -0.473209 CR5 192 3.2 0.614
-0.48776 CR6 MEAN TIME AVGS 192.5 3.20833333 0.64 -0.446287 CR7 0.63 3.21 193 3.21666667 0.62 -0.478036 CR8 SD 193.5 3.225 0.629 -0.463624 CR9 0.01 194 3.23333333 0.6421-0.443167 CR10
%SD 194.5 3.24166667 0.612 -0.491023 CRUP 2.2%
195 3.25 0.618 -0.4812671
TEST J OCONEE UI/U2 NORMAL MODE TEST 8110/01
SUMMARY
OUTPUT
SUMMARY
OUTPUT Regression Statistics Multiple R 0.99923508 R Square 0.99847075 Adjusted R Square 0.99845036 Standard Error 0.01914524 Observations 77 A kI('.'.IA F
fit rwP Regression 1
17.94893525 17.94893525 48968.506 2.4059E-1 07 Residual 75 0.027490529 0.00036654 Total 76 17.97642578 Coefficients Standard Error t Stat P-value Lower 95%
Upper 95%
Intercept 1.08967782 0.004320781 252.1946515 1.34E-1 11 1.081070385 1.098285263 TI-ME(HR)
- --0.4-827273
-0.00218-1441
-221.2882876 2.41E-107
-0.487072999 -0.47838169 TIME MEASURED_
REGRESSION DIFF 0.21 2.67!
2.69
-0.6%
0.71 2.12 2.11 0.4%/.
1.66 1.66 0.1%
1 1.31 1.30 0.6%
Z.21 1.02 1.02
-0.3%
2.71 0.81 0.80 0.8%
3.21 0.631 0.63
-0.2%
.N.N U
F
.Af
U1/U2 CONCENTRATION DECAY TEST 8/10/01 i
E.
C.
z 0
I z
LI uJ z
0 U)
(0 C,)
10
- MEASURED REGRESSION I
0.1
-I 0
1 2
TIME (hrs) 3 4
I
Inleakage Error Analysis-Concentration Decay Test This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square)
B are bias errors in measurement S are random errors in measurement t95 is Student's t at 95 % confidence Date Location Ventilation CRE Volume Test Parameters 8110-11/01 Oconee UI/U2 AHU 1-11 108000 Injection Concentration Injection Duration Injection Flow Rate Calibration Point Value
Background
Regression Value Number of Values =
RMS Error =
Test J
Cu. Ft.
10210 ppm 60.00 min 15.00 SLPM 2.16 ppm
<3 ppb A
0.4827 72 0.002606 (From Spread Sheet)
Bias Errors Calibration Gas Error Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Error Analyzer SN100 Numeric Bias Value Error 2.00%
0.9703 0.9918 0.9488 Analyzer SN123 Numeric Bias Value Error 2.00%
1.0520 1.0666 1.0374 2.09%
1.54%
USE LARGER ANALYZER ERROR IN BIAS CALC Volumetric Error 2%
Inleakage Error Analysis-Concentration Decay Test Date Location Ventilation CRE Volume 8/10-11/01 Oconee Ul/U2 AHU 1-11 108000 Inleakage Error Bias Error Random Error Urss Squared Sum 0.0012352 0.00002699 Number Observations Student t 0.036 Inleakage Max-95 Min-95 869 ACFM 900 ACFM 838 ACFM Test J
Cu. Ft.
72 1.993462
LAT w/o 3272 FINAL REPORT 9/30/01 TEST K 8/11/01 AHU 1-11 and Fan 1B Operating
Inleakage Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU FAN Time 8/11-12/2001 OCONEE 1B Test K
Test Parameters 10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppb Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Time Makeup Return CFM Delta ppm 1
0.0 1.56 1.55 5.4 0.01 2
10.0 1.54 1.55
-7.9
-0.01 3
20.0 1.52 1.53
-8.1
-0.01 4
30.0 1.53 1.50 19.7 0.03 5
40.0 1.55 1.55 2.3 0.00 6
50.0 1.53 1.53
-3.2 0.00 7
60.0 1.53 1.51 13.0 0.02 Random Error Makeup Return CFM Delta ppm Average 1.54 1.53 3.0 0.00 Std Dev.
0.01 0.02 10.52 0.01
% Dev.
0.97%
1.33%
354.88%
349.21%
Inleakage Measurement & Error Analysis Date Location M/U AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error Analyzer snIO0 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/11-12/2001 Test OCONEE 1B 0
Numeric Value 0.9618 0.9800 0.9436 Inleakage Error Bias Error Random Error Urss Squared Sum 0.001164524 75.40713632 Degrees of Freedom Student t factor 8.684 Inleakage Max-95 Min-95 3 SCFM 29 SCFM
-23 SCFM K
Bias Error 1.00%
1.06%
2.00%
2.35%
1.00%
1.75%
6 2.446914 7'
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MU AHU Time 8/11-12/2001 Test OCONEE 1B 1:20 KF4 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.48 1141.6 2
A2 1.56 1083.0 3
A3 1.41 1198.2 4
B1 1.55 1090.0 5
B2 1.54 1097.1 6
B3 1.42 1189.8 7
Cl 1.60 1056.0 8
C2 1.70 993.8 9
C3 1.76 960.0 Random Error Makeup CFM Average 1.56 1084.6 Std Dev.
0.12 80.43
% Dev.
7.53%
7.42%
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/11-12/2001 Test OCONEE 1B 1:20 Numeric Value 1.00%
0.9618 0.9800 0.9436 1.75%
-0.57%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000644951 0.029245341 Degrees of Freedom Student t factor 0.173 Flowrate Max-95 Min-95 1085 SCFM 1272 SCFM 897 SCFM KF4 Bias Error 1.00%
1.06%
2.000/6 8
2.306006 4
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/11-12/2001 Test OCONEE 1B 1:30 KF5 Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.49 1133.9 2
A2 1.55 1090.0 3
A3 1.44 1173.3 4
B1 1.50 1126.4 5
B2 1.54 1097.1 6
B3 1.52 1111.5 7
Cl 1.54 1097.1 8
C2 1.63 1036.5 9
C3 1.64 1030.2 Random Error Makeup CFM Average 1.54 1097.9 Std Dev.
0.06 45.23
% Dev.
4.15%
4.12%
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppm Date Location MIU AHU Time Test Parameters
Flowrate Error Analysis Date Location MIU AHU Time 8/11-12/2001 Test OCONEE 1B 1:30 Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error Flowrate Error
- lumeric Value 1.00%
0.9618 0.9800 0.9436 1.75%
-0.59%
Bias Error Random Error Urss Squared Sum 0.00064744 0.009024261 Degrees of Freedom Student t factor 0.098 Flowrate Max-95 Min-95 1098 SCFM 1206 SCFM 990 SCFM
- *t' 2
KF5 Bias Error 1.00%
1.06%
2.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU AHU Time 8/11-12/2001 Test OCONEE 1B 1:40 KF6 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.46 1157.2 2
A2 1.48 1141.6 3
A3 1.42 1189.8 41 B1 1.56 1083.0 5
B2 1.62 1042.9 6
B3 1.44 1173.3 7
C1 1.52 1111.5 8
C2 1.58 1069.3 9
C3 1.59 1062.6 Random Error Makeup CFM Average 1.52 1112.3 Std Dev.
0.07 53.08
% Dev.,
4.75%,
4.77%,
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MWU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error sn100 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/11-12/2001 Test OCONEE 1B 1:40 0.9618 0.9800 0.9436 1.75%
-0.62%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.00065021 0.012110049 Degrees of Freedom Student t factor 0.113 Flowrate Max-95 Min-95 1112 SCFM 1238 SCFM 987 SCFM Numeric Value KF6 Bias Error 1.00%
1.06%
2.00%
1.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU AHU Time 8/11-12/2001 Test OCONEE 1B 1:50 KF7 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.55 1090.0 2
A2 1.51 1118.9 3
A3 1.48 1141.6 4
B1 1.50 1126.4 5
B2 1.57 1076.1 6
B3 1.44 1173.3 7
C1 1.58 1069.3 8
C2 1.56 1083.0 9
C3 1.55 1090.0 Random Error Makeup CFM Average 1.53j 1106.7 Std Dev.
0.05 34.69
% Dev.
3.07%
3.13%
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snlO0 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/11-12/2001 Test OCONEE 1B 1:50 Numeric Value 1.00%
0.9618 0.9800 0.9436 1.75%
-0.61%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000649116 0.005223811 Degrees of Freedom Student t factor 0.077 Flowrate Max-95 Min-95
+/-
1107 SCFM 1191 SCFM 1022 SCFM KF7 Bias Error 1.00%
1.06%
2.00%
8 2.306006
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU AHU Time 8/11-12/2001 Test OCONEE 1B 2:00 KF8 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.54 1097.1 2
A2 1.50 1126.4 3
A3 1.45 11.65.2 4
B1 1.54 1097.1 5
B2 1.63 1036.5 6
B3 1.47 1149.3 7
Cl 1.57 1076.1 8
C2 1.62 1042.9 9
C3 1
1.661 1017.8 Random Error Makeup CFM Average 1.55 1087.7 Std Dev.
0.071 51.33
% Dev.
4.71%
4.72%
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/11-12/2001 Test OCONEE 1B 2:00 Numeric Value 1.00%
0.9618 0.9800 0.9436 1.75%
-0.58%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000645525 0.011844281 Degrees of Freedom Student t factor 0.112 Flowrate Max-95 Min-95
+/-
1088 SCFM 1209 SCFM 966 SCFM KF8 Bias Error 1.00%
1.06%
2.00%
8 2.306006
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/11-12/2001 Test OCONEE 1B 2:10 KF9 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.47 1149.3 2
A2 1.48 1141.6 3
A3 1.42 1189.8 4
B1 1.53 1104.3 5
B2 1.60 1056.0 6
B3 1.45 1165.2 7
Cl 1.60 1056.0 8
C2 1.64 1030.2 9
C3 1.54 1097.1 Random Error Makeup CFM Average 1.53 1107.5 Std Dev.
0.08 55.19
% Dev.
4.99%
4.98%
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppm
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/11-12/2001 Test OCONEE 1B 2:10 Numeric Value 1.00%
0.9618 0.9800 0.9436 1.75%
-0.61%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000649271 0.013206688 Degrees of Freedom Student t factor 0.118 Flowrate Max-95 Min-95
1=
1107 SCFM 1238 SCFM 977 SCFM KF9 Bias Error 1.00%
1.06%
2.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU AHU Time 8/11-12/2001 Test OCONEE 1B 2:20 KF10 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 1.51 1118.9 2
A2 1.52 1111.5 3
A3 1.42 1189.8 4
Bi 1.57 1076.1 5
B2 1.54 1097.1 6
B3 1.48 1141.6 7
C1 1.53 1104.3 8
C2 1.59 1062.6 9
C3 1.59 1062.6 Random Error Makeup CFM Average 1.53 1105.9 Std Dev.
0.05 40.64
% Dev.
3.58%
3.68%
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppm
Flowrate Error Analysis Date Location M/U AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/11-1212001 Test OCONEE 1B 2:20 Numeric Value 1.00%
0.9618 0.9800 0.9436 1.75%
-0.61%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000648962 0.007183243 Degrees of Freedom Student t factor 0.088 Flowrate Max-95 Min-95
+
1106 SCFM 1204 SCFM 1008 SCFM KF10 Bias Error 1.00%
1.06%
2.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/11-12/2001 Test OCONEE 1B 01:20-02:20 7 Test Avg Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Test Supply CFM 1
KF4 1.56 1084.6 2
KF5 1.54 1097.9 3
KF6 1.52 1112.3 4
KF7 1.53 1106.7 5
KF8 1.55 1087.7 6
KF9 1.53 1107.5 7
KF10 1.53 1105.9 Random Error Supply CFM Average 1.54 1099.3 Std Dev.
0.02 11.36
% Dev.
1.04%
1.03%
10130 ppm 5.00 SLPM 4.72 SLPM 2.16 ppb Date Location MIU AHU Time Test Parameters
Flowrate Error Analysis Date Location MIU AHU Time 8/11-12/2001 Test OCONEE 1B 01:20-02:20 Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snI00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 0.9618 0.9800 0.9436 1.75%
-0.60%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000647716 0.000639378 Degrees of Freedom Student t factor 0.036 7 Test Avg Numeric Value 1.00%
Bias Error 1.00%
1.06%
2.00%
6 2.446914 Flowrate 1099 SCFM Max-95 1139 SCFM Min-95 1060 SCFM
LAT w/o 3272 FINAL REPORT 9/30/01 TEST L 8/12/01 AHU 1-11 and Fans 1A & 1B Operating
Inleakage Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (B^2) + (t95*S)^2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU FAN Time 8/12-13/2001 OCONEE 1A & 1B 00:10-01:10 Test L
Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data 9980 ppm 5.00 SLPM, 4.84 SLPM 1.092 ppb Concentration (ppm)
Sample #
Time Makeup Return CFM Delta ppm 1
0.0 0.809 0.830
-53.7
-0.02 2
10.0 0.811 0.813
-5.5 0.00 3
20.0 0.820 0.819 3.7 0.00 4
30.0 0.832 0.826 14.4 0.01 5
40.0 0.814 0.822
-21.7
-0.01 6
50.0 0.813 0.821
-19.6
-0.01 7
60.0 0.792 0.824
-82.8
-0.03 Random Error Makeup Return CFM Delta ppm Average 0.813 0.822
-23.3
-0.01 Std Dev.
0.01 0.01 34.01 0.01
% Dev.
1.47%
0.66%
Inleakage Measurement & Error Analysis Date 8/12-13/2001 Test L
Location OCONEE MU AHU IA&I1B Time 00:10-01:10 Bias Errors Numeric Bias Value Error Injection Concentration Err 1.00%
Injection Flowrate % FS Err 1.00%
Injection Flowrate Error 1.03%
Calibration Gas Error 2.00%
Analyzer snl00 Analyzer Exponent (n) 0.9684 Analyzer Exponent U95 0.9877 Analyzer Exponent L95 0.9491 Analyzer Exponent Error 1.87%
Analyzer Error 2.41%
Inleakage Error Squared Sum Bias Error 0.00118752 Degrees of Freedom 6
Random Error
- VALUE!
Student t factor 2.446914 Urss
- VALUE!
Inleakage
-23 SCFM Max-95
- VALUE!
SCFM Min-95
- VALUE!
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/12-13/2001 Test OCONEE 1A& lB 18:35 LF1 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.801 2130.9 2
A2 0.775 2202.4 3
A3 0.793 2152.4 4
B1 0.837 2039.2 5
B2 0.863 1977.8 6
B3 0.819 2084.0 7
Cl 0.843 2024.7 8
C2 0.881 1937.4 9
C3 0.851 2005.7 Random Error Makeup CFM Average 0.829 2058.3 Std Dev.
0.03 87.18
% Dev.
4.20%
4.24%
9980 ppm 5.00 SLPM 4.84 SLPM 1.092 ppm
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (B^2) + (t95*S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MWU AHU Time 8/12-13/2001 Test OCONEE 1A&IB 0:10 LF4 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data 9980 ppm 5.00 SLPM 4.84 SLPM 1.092 ppm Concentration (ppm)
.PI lvii
",'ample-..
Location_________
0.777 0.743 0.817 0.861 0.757 0.811 0.895 0.842 21 96.7 2297.2 2089.1 1982.4 2254.7 2104.6 1907.1 2027.1 5~mnlA #
1 2
3 4
5 6
7 8
9 Al A2 A3 B1 B2 B3 C1 C2 C3 Random Error Makeup CFM Average 0.809 2110.1 Std Dev.
0.05 130.07
% Dev.
6.24%
6.16%
Makeup kFIV II Location
Flowrate Error Analysis Date Location MU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snlO0 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/12-13/2001 Test OCONEE 1A&1B 0:10 0.9684 0.9877 0.9491 1.87%
-0.56%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000638182 0.020206043 Degrees of Freedom Student t factor 0.144 Flowrate Max-95 Min-95 1*
1
2110 SCFM 2415 SCFM 1805 SCFM Numeric Value LF4 Bias Error 1.00%
1.03%
2.00%
1.00%
8 2.306006
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[(BA2) + (t95"S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/12-13/2001 Test OCONEE 1A&1B 0:20 LF5 injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM I
Al 0.777 2196.7 2
A2 0.799 2136.2 3
A3 0.746 2288.0 4
B1 0.807 2115.0 5
B2 0.851 2005.7 6
B3 0.764 2234.1 7
Cl 0.803 2125.6 8
C2 0.887 1924.3 91 C3 0.864 1975.5 Random Error Makeup CFM Average 0.811 2104.9 Std Dev.
0.05 121.96
% Dev.
5.85%
5.79%
9980 ppm 5.00 SLPM 4.84 SLPM 1.092 ppm Test Parameters
Flowrate Error Analysis Date Location MWU AHU Time 8/12-13/2001 Test OCONEE 1A & 1B 0:20 Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snlO0 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error Flowrate Error lumeric Value 1.00%
0.9684 0.9877 0.9491 1.87%
-0.56%
Bias Error Random Error Urss Squared Sum 0.000637666 0.017852545 Degrees of Freedom Student t factor 0.136 Flowrate Max-95 Min-95 ILl 2105 SCFM 2391 SCFM 1819 SCFM LF5 Bias Error 1.00%
1.03%
2.00%
8 2.306006 I
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/12-13/2001 Test OCONEE IA&IB 0:30 Numeric Value 1.00%
0.9684 0.9877 0.9491 1.87%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000635278 0.03440622 Degrees of Freedom Student t factor 0.187 IFlowrate 2080 SCFM 2470 SCFM 1691 SCFM LF6 Bias Error 1.00%
1.03%
2.00%/6
-0.53%
8 2.306006 Max-95 Min-95
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement Date Location MIU AHU Time 8/12-13/2001 Test OCONEE 1A& 1B 0:40 LF7 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.749 2278.8 2
A2 0.807 2115.0 3
A3 0.791 2157.8 4
B1 0.849 2010.4 5
B2 0.854 1998.6 6
B3 0.785 2174.3 7
Cl 0.837 2039.2 8
C2 0.909 1877.7 9
C3 0.905 1886.0 Random Error Makeup CFM Average 0.832 2052.0 Std Dev.
0.05 134.03
% Dev.
6.51%
6.53%
9980 ppm 5.00 SLPM 4.84 SLPM 1.092 ppm
Flowrate Error Analysis Date Location MWU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/12-13/2001 Test OCONEE 1A&1B 0:40 Numeric Value 1.00%
0.9684 0.9877 0.9491 1.87%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000632603 0.022685166 Degrees of Freedom Student t factor 0.153 Flowrate Max-95 Min-95 I11 2052 SCFM 2365 SCFM 1739 SCFM LF7 Bias Error 1.00%
1.03%
2.00%
-0.51%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/12-13/2001 Test OCONEE 1A& lB 0:50 LF8 Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.758 2251.8 2
A2 0.811 2104.6 3
A3 0.709 2407.4 4
Bi 0.847 2015.1 5
B2 0.844 2022.3 6
B3 0.798 2138.9 7
Cl 0.849 2010.4 8
C2 0.892 1913.5 Random Error Makeup CFM Average 0.814 2098.1 Std Dev.
0.06 157.92
% Dev.
7.16%
7.53%
9980 ppm 5.00 SLPM 4.84 SLPM 1.092 Date Location MIU AHU Time Test Parameters
Flowrate Error Analysis Date Location MIU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snlO0 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/12-13/2001 Test OCONEE 1A&IB 0:50 Numeric Value 1.00%
0.9684 0.9877 0.9491 1.87%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000637001 0.031678246 Degrees of Freedom Student t factor 0.180 Flowrate Max-95
, Min-95 ILlil 2098 SCFM 2475 SCFM 1721 SCFM LF8 Bias Error 1.00%
1.03%
2.00%
-0.55%
7 2.364623 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95"S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/12-13/2001 Test OCONEE 1A & 1B 1:00 LF9 Test Parameters Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
Al 0.784 2177.1 2
A2 0.819 2084.0 3
A3 0.755 2260.7 4
B1 0.841 2029.5 5
B2 0.850 2008.0 6
B3 0.746 2288.0 7
Cl 0.790 2160.5 8
C2 0.883 1933.0 9
C3 0.852 2003.3 Random Error Makeup CFM Average 0.813 2098.6 Std Dev.
0.05 123.22
% Dev.
5.80%
5.87%
9980 ppm 5.00 SLPM 4.84 SLPM 1.092 ppm Date Location MIU AHU Time
Flowrate Error Analysis Date Location MWU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snl00 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/12-13/2001 Test OCONEE 1A& 1B 1:00 Numeric Value 1.00%
0.9684 0.9877 0.9491 1.87%
-0.55%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000637043 0.018333626 Degrees of Freedom Student t factor 0.138 Flowrate Max-95 Min-95 111 2099 SCFM 2388 SCFM 1810 SCFM LF9 Bias Error 1.00%
1.03%
2.00%
8 2.306006 I
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]AO.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/12-13/2001 Test OCONEE 1A&1B 1:10 LF10 Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Location Makeup CFM 1
A1 0.747 2284.9 2
A2 0.774 2205.2 3
A3 0.727 2347.8 4
B1 0.798 2138.9 5
B2 0.840 2031.9 6
B3 0.752 2269.7 7
Cl 0.763 2237.0 8
C2 0.872 1957.4 9
C3 0.858 1989.3 Random Error Makeup CFM Average 0.792 2154.2 Std Dev.
0.05 140.47
% Dev.
6.64%,
6.52%.
9980 ppm 5.00 SLPM 4.84 SLPM 1.092 ppm Date Location MWU AHU Time Test Parameters
Flowrate Error Analysis Date Location MWU AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error snlO0 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8112-13/2001 Test OCONEE 1A&IB 1:10 Numeric Value 0.9684 0.9877 0.9491 Flowrate Error Bias Error Random Error Urss Squared Sum 0.000642667 0.022611225 Degrees of Freedom Student t factor 0.152 Flowrate Max-95 Min-95
'iii 2154 SCFM 2483 SCFM 1826 SCFM LF10 Bias Error 1.00%
1.03%
2.00%
1.00%
1.87%
-0.60%
8 2.306006
Flowrate Measurement & Error Analysis This analysis uses the ANSI/ASME Standard Uncertainty Model Urss =
[ (BA2) + (t95*S)A2]A0.5
- where, Urss is the measurement uncertainty (Root Sum Square) t95 is Student's t at 95 % confidence B are bias errors in measurement S are random errors in measurement 8/12-13/2001 Test OCONEE 1A&1B 00:10-01:10 7 Test Avg Injection Concentration Injection Flowmeter Max Value Injection Flow Rate Calibration Point Value (ppb)
Measured Data Concentration (ppm)
Sample #
Time Supply CFM 1
2230.0 0.809 2110.1 2
2230.5 0.811 2104.9 3
2231.0 0.820 2080.4 4
2232.0 0.832 2052.0 5
2232.5 0.814 2098.1 6
2233.0 0.813 2098.6 7
2233.0 0.792 2154.2 Random Error Supply CFM Average 0.816 2090.5 Std Dev.
0.01 21.43
% Dev.
1.04%
1.03%
9980 ppm 5.00 SLPM 4.84 SLPM 1.092 ppb Date Location MIU AHU Time Test Parameters
Flowrate Error Analysis Date Location M/U AHU Time Bias Errors Injection Concentration Err Injection Flowrate % FS Err Injection Flowrate Error Calibration Gas Error "snlO0 Analyzer Exponent (n)
Analyzer Exponent U95 Analyzer Exponent L95 Analyzer Exponent Error Analyzer Error 8/12-13/2001 Test 7 Test Avg OCONEE 1A&1B 00:10-01:10 Numeric Bias Value Error 1.00%
1.00%
1.03%
2.00%
0.9684 0.9877 0.9491 1.87%
-0.54%
Flowrate Error Bias Error Random Error Urss Squared Sum 0.000636256 0.000629315 Degrees of Freedom Student t factor 0.036 Flowrate Max-95 Min-95 'F' 2090 SCFM 2165 SCFM 2016 SCFM 6
2.446914 II
LAT w/o 3272 FINAL REPORT 9/30/01 APPENDIX C-STATISTICAL COMPARISON OF MEAN VALUES
COMPARING MEANS:
OCONEE TEST H 8/8101 ENTER UP TO FIFTEEN VALUES Column A Column B N1 Makeup N2 Return 1
1.46 1
1.47 2
1.49 2
1.49 3
1.47 3
1.46 4
1.46 4
1.46 5
1.48 5
1.44 6
1.46 6
1.45 7
1.45 7
1.43 MEANA STDEVA
%A NA=
1.4671 0.014
- 0.9%
7 Sp=
dF=
t CALC t STATISTIC MEANB STDEVB
%B NB=
0.017 12 1.098 2.179 1.4571 0.020 1.4%
7 If t CALC > t STATISTIC then means are different at the 95% confidence level Use when population variances are unequal dF 10.728496 X 6.89E-09 Y
1.23E-10 dF=X/(Y+Z)
Z 5.19E-10
COMPARING MEANS: OCONEE TEST I 819101 ENTER UP TO FIFTEEN VALUES Column A N1 Makeup 1
0.941 2
0.935 3
0.952 4
0.982 5
0.943 6
0.938 7
0.913 Column B N2 Return 1
0.966 2
0.958 3
0.933 4
0.962 5
0.931 6
0.938 7
0.927 MEANA STDEVA
%A NA=
0.9434 0.021 2.2%
7 Sp=
dF=
t CALC t STATISTIC MEANB STDEVB
%B NB=
0.019 12 0.157 2.179 0.9450 0.016 1.7%
7 If t CALC > t STATISTIC then means are different at the 95% confidence level
COMPARING MEANS: OCONEE TEST K 8111/01 ENTER UP TO FIFTEEN VALUES Column A Column B N1 Makeup N2 Return 1
1.56 1
1.55 2
1.54 2
1.55 3
1.52 3
1.53 4
1.53 4
1.50 5
1.55 5
1.55 6
1.53 6
1.53 7
1.53 7
1.51 MEANA STDEVA
%A NA=
1.5371 0.014 0.9%
7 Sp=
dF=
t CALC t STATISTIC MEANB STDEVB
% B NB=
0.017 12 0.615 2.179 1.5314 0.020 1.3%
7 If t CALC > t STATISTIC then means are different at the 95% confidence level
COMPARING MEANS: OCONEE TEST L 8/12/01 ENTER UP TO FIFTEEN VALUES Column A NI Makeup 1
0.809 2
0.811 3
0.820 4
0.832 5
0.814 6
0.813 7
0.792 Column B N2 Return 1
0.830 2
0.813 3
0.819 4
0.826 5
0.822 6
0.821 7
0.824 MEANA STODEVA
%A NA=
0.8130 0.012 1.5%
7 Sp=
dF=
t CALC t STATISTIC MEANB STDEVB
%B NB=
0.009 12 1.831 2.179 0.8221 0.005 0.7%
7 If t CALC > t STATISTIC then means are different at the 95% confidence level
MINIMUM DETECTABLE INCREMENT Column A 1.46 1.49 1.47 1.46 1.48 1.46 1.45 Incr. Conc.
OCONEE TEST H 8/8/01 Increment 0.01 Col A + Incr 1.47 1.50 1.48 1.47 1.49 1.47 1.46 1.4771 0.014 0.9%
t CALCULATOR WHEN STATISTICS ARE KNOWN FOR TWO MEANS MEANA STDEVA 1.4771 0.014 0.9%
MEANB STDEVB
%B 1.4571 0.020 1.4%
ENTER NUMBER IN EACH SAMPLE SET NA=
Sp=
t CALC t STATISTIC 7
NB=
7 dF=
0.017 2.195 2.179 If t CALC > t STATISTIC then means are different at the 95% confidence level 12
MINIMUM DETECTABLE INCREMENT Column A 0.941 0.935 0.952 0.982 0.943 0.938 0.913 Incr. Conc.
OCONEE TEST I 819/01 Increment 0.024 Col A + Incr 0.965 0.959 0.976 1.006 0.967 0.962 0.937 0.9674 0.021 2.1%
t CALCULATOR WHEN STATISTICS ARE KNOWN FOR TWO MEANS MEANA STODEVA 0.9674 0.021 2.1%
MEANB STDEVB
% B 0.9450 0.016 1.7%
ENTER NUMBER IN EACH SAMPLE SET NA=
Sp=
t CALC t STATISTIC 7
NB=
7 dF=
0.019 2.241 2.179 If t CALC > t STATISTIC then means are different at the 95% confidence level 12
MINIMUM DETECTABLE INCREMENT OCONEE TEST K 8/11101 Increment 0.02 Column A Col A + Incr 1.56 1.58 1.54 1.56 1.52 1.54 1.53 1.55 1.55 1.57 1.53 1.55 1.53 1.55 Incr. Conc.
1.5571 0.014 0.9%
t CALCULATOR WHEN STATISTICS ARE KNOWN FOR TWO MEANS MEANA STDEVA
% A 1.5571 0.014 0.9%
MEANB STDEVB
% B ENTER NUMBER IN EACH SAMPLE SET NA=
Sp=
t CALC t STATISTIC 7
NB=
7 dF=
0.017 2.767 2.179 If t CALC > t STATISTIC then means are different at the 95% confidence level 1.5314 0.020 1.3%
12
MINIMUM DETECTABLE INCREMENT OCONEE TEST L 8112101 Increment 0.021 Column A Col A + Incr 0.809 0.830 0.811 0.832 0.820 0.841 0.832 0.853 0.814 0.835 0.813 0.834 0.792 0.813 Incr. Conc.
0.8340 0.012 1.4%
t CALCULATOR WHEN STATISTICS ARE KNOWN FOR TWO MEANS MEANA STDEVA 0.8340 0.012 1.4%
MEANB STDEVB
% B ENTER NUMBER IN EACH SAMPLE SET NA=
Sp=
t CALC t STATISTIC 7
NB=
7 dF=
0.009 2.375 2.179 If t CALC > t STATISTIC then means are different at the 95% confidence level 0.8221 0.005 0.7%
12
LAT w/o 3272 FINAL REPORT 9/30/01 APPENDIX D-CRE DIFFERENTIAL PRESSURE DATA
LAT w/o 3272 FINAL REPORT 9/30/01 TEST H DIFFERENTIAL PRESSURE: 8/8/01 UNIT 3 HVAC in EMERGENCY MODE I BOOSTER FAN OPERATING Location Differential Pressure (in. w.g.)
Turbine Building
+ 0.23 Unit 3 Cable Room
+0.22 Mechanical Equipment Room
+0.24 Unit 3 Control Room Lobby
+0.23 Unit 3 East Penetration Room
+0.23 Outside
+0.21 TEST I DIFFERENTIAL PRESSURE: 8/9/01 UNIT 3 HVAC in EMERGENCY MODE 2 BOOSTER FANS OPERATING Location Differential Pressure (in. w.g.)
Turbine Building
>+ 0.5 Unit 3 Cable Room
>+ 0.5 Mechanical Equipment Room
>+ 0.5 Unit 3 Control Room Lobby
>+ 0.5 Unit 3 East Penetration Room
>+ 0.5 Outside
>+ 0.5
LAT w/o 3272 FINAL REPORT 9/30/01 TEST K DIFFERENTIAL PRESSURE: 8/11/01 UNITS I & 2 CRE HVAC in EMERGENCY MODE I BOOSTER FAN OPERATING Location Differential Pressure (in. w.g.)
Unit I Control Room Lobby
+0.32 Turbine Building
+ 0.21 Unit 2 Control Room Lobby
+0.25 Unit 2 Cable Room
+0.21 Unit 2 East Penetration Room
+0.24 Unit I Cable Room
+0.20 Unit I East Penetration Room
+0.23 Mechanical Equipment Room
+0.26 TEST L DIFFERENTIAL PRESSURE: 8/12/01 UNITS I & 2 CRE HVAC in EMERGENCY MODE 2 BOOSTER FANS OPERATING Location Differential Pressure (in. w.g.)
Unit I Control Room Lobby
>+0.5 Turbine Building
>+0.5 Unit 2 Control Room Lobby
>+0.5 Unit 2 Cable Room
>+0.5 Unit 2 East Penetration Room
>+0.5 Unit I Cable Room
>+0.5 Unit I East Penetration Room
>+0.5 Mechanical Equipment Room
>+0.5
ATTACHMENT 3 Duke Energy Corporation Electronic Files Alternate Source Term Response