Exekon.
Exelon Nuclear Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314-9032 Telephone 717.456.7014 www.exeloncorp.com Nuclear May 3, 2002 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50.278
Subject:
Annual Commitment Revision Report - January 1, 2001 through December 31, 2001 In accordance with NEI 99-04, Rev. 0, Guidelines for Managing NRC Commitment Changes, attached is our annual commitment revision report. If you have any questions, please feel free to contact Dave Foss, (717) 456-4311 or Denny McClellan, (717) 456-3402.
Si John Doering Vice President Peach Bottom Atomic Power Station Attachment cc:
H. J. Miller, US NRC, Administrator, Region 1 A. J. McMurtray, US NRC, Senior Resident Inspector CCN 02-14038
ý od
Attachment Exelon Nuclear Peach Bottom Atomic Power Station Docket Nos. 50-277 & 50-278 PBAPS Annual Commitment Revision Report for the Period January 1, 2001 through December 31, 2001 Letter Source:
Letter to NRC, 5/19/82 Exelon Tracking No.:
T03094 Nature of Commitment:
Operations Shift Turnover List revision to include various reactor parameters during shutdown conditions Summary of Justification:
Monitoring of important plant parameters will continue to be performed. The need to pinpoint certain detailed parameters in a shift turnover list has been superseded by other enhanced programs and procedures. The appropriate plant parameters are appropriately monitored during shutdown conditions.
Letter Source:
LER 3-92-02, Drywell Oxygen Concentration Levels Exelon Tracking No.:
T02064 Nature of Commitment:
Surveillance tests to record oxygen concentration in drywell were revised to add an additional action point to ensure limits are not exceeded.
Summary of Justification:
This commitment is eliminated due to the usage of new monitors which do not have the particular failure mode that the previous instruments had. Additionally, other equipment performance checks as well as equipment trending and monitoring checks are routinely performed.
Letter Source:
NRC Supplemental SER on Station Blackout dated 10/23/92 Exelon Tracking No.:
T03637 Nature of Commitment:
Revise the site station blackout response procedure to ensure that control room ceiling tiles and panel doors are opened to dissipate heat during a station blackout event.
Summary of Justification:
This commitment is eliminated based on subsequent engineering calculations and analyses that determined that removal of ceiling tiles and opening of panel doors are no longer required to dissipate heat during the station blackout event. During review of the implementation of this commitment, it was determined that this commitment had not been adequately implemented since 1992. This was captured in the site Corrective Action Program in 2000 for resolution and was subsequently determined to not currently be an actual safety concern based on the above discussed calculation and analyses.
End of Report