Technical Specification Pages (Paper Only) Page 3/8 8-7a (Unit 2)
ML021260009
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/23/2002
From:
NRC/NRR/DLPM
To:
Florida Power & Light Co
References
TAC MB3911, TAC MB3915
Download: ML021260009 (2)


Text

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (continued)

g. At least once per ten years by:
1. Draining each fuel storage tank, removing the accumulated sediment and cleaning the tank using an appropriate cleaning compound, and
2. Performing a pressure test of those portions of the diesel fuel oil system designed to USAS B31.7 Class 3 requirements in accordance with the Inservice Inspection Program.

4.8.1.1.3 Reports - (Not Used) 4.8.1.1.4 The Class 1E underground cable system shall be demonstrated OPERABLE within 30 days after the movement of any loads in excess of 80% of the ground surface design basis load over the cable ducts by pulling a mandrel with a diameter of at least 80% of the duct's inside diameter through a duct exposed to the maximum loading (duct nearest the ground's surface) and verifying that the duct has not been damaged.

3/4 8-6b Amendment No. 4-93, 44-2, ST. LUCIE - UNIT 1 44,449*, 181

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

12. Verifying that the automatic load sequence timers are operable with the interval between each load block within +1 second of its design interval.
13. Performing Surveillance Requirement 4.8.1.1.2a.4 within 5 minutes of shutting down the diesel generator after it has operated within a load band of 3450 kW to 3685 kW# for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or until operating temperatures have stabilized.
f. At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting**** the diesel generators simultaneously, during shutdown, and verifying that the diesel generators accelerate to approximately 900 rpm in less than or equal to 10 seconds.
g. At least once per 10 years by:
1. Draining each fuel oil storage tank, removing the accumulated sediment and cleaning the tank using a sodium hypochlorite solution, and
2. Performing a pressure test of those portions of the diesel fuel oil system designed to Section III, subsection ND of the ASME Code in accordance with the Inservice Inspection Program.

4.8.1.1.3 Reports - (Not Used).

4.8.1.1.4 The Class 1E underground cable system shall be demonstrated OPERABLE within 30 days after the movement of any loads in excess of 80% of the ground surface design basis load over the cable ducts by pulling a mandrel with a diameter of at least 80% of the duct's inside diameter through a duct exposed to the maximum loading (duct nearest the ground's surface) and verifying that the duct has not been damaged.

  1. This band is meant as guidance to avoid routine overloading of the engine. Variations in load in excess of this band due to changing bus loads shall not invalidate this test.
        • This test may be conducted in accordance with the manufacturer's recommendations concerning engine prelube period.

ST. LUCIE - UNIT 2 3/4 8-7a Amendment No. 49, 78, 124