ML021260007

From kanterella
Jump to navigation Jump to search

Tech Spec Page Amendment No. 150 Dated May 2, 2002, Reactor Pump Seal Injection
ML021260007
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/02/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB3744
Download: ML021260007 (2)


Text

Seal Injection Flow 3.5.5 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.5 Seal Injection Flow LCO 3.5.5 APPLICABILITY:

Reactor coolant pump (RCP) seal injection flow shall be within the limits of Figure 3.5.5-1.

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A

Seal injection flow not A.1 Adjust manual seal 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> within limit.

injection throttle valves such that the RCP seal injection flow is within the limits of Figure 3.5.5-1.

B. Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Amendment No. 150 CALLAWAY PLANT 3.5-10

Seal Injection Flow 3.5.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.5.1 NOTE-Not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the Reactor Coolant System pressure stabilizes at

>_ 2215 psig and *2255 psig.

Verify manual seal injection throttle valves are 18 months adjusted to give a flow within the limits of Figure 3.5.5-1.

Amendment No. 150 CALLAWAY PLANT 3.5-11

Seal Injection Flow 3.5.5 Delta P from Charging Header to RCS vs. Total Seal Injection Line Flow T

I:

1*

t4#A#4ýi###

t-tl 4iZ t

a CL "190.

. 180.

9L U) 0 150 140 130

"-m 120 3,

0 150' V--

iAi7Tht7

-441-

-444H14+

1 24Z'TP7-17TA4-4+2~

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Total Seal Injection Line Flow (GPM)

Figure 3.5.5-1 (page 1 of 1)

Delta P from Charging Header to RCS vs. Total Seal Injection Line Flow PLANT 3.5-12 Amendm 7 4 ýHry trl 4 -t 39 40 CALLAWAY ent No. 150 "J[1[I I