Tech Spec Page Amendment No. 150 Dated May 2, 2002, Reactor Pump Seal Injection
ML021260007
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/02/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB3744
Download: ML021260007 (2)


Text

Seal Injection Flow 3.5.5 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.5 Seal Injection Flow LCO 3.5.5 Reactor coolant pump (RCP) seal injection flow shall be within the limits of Figure 3.5.5-1.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A Seal injection flow not A.1 Adjust manual seal 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> within limit. injection throttle valves such that the RCP seal injection flow is within the limits of Figure 3.5.5-1.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> CALLAWAY PLANT 3.5-10 Amendment No. 150

Seal Injection Flow 3.5.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.5.1 ------------ NOTE-Not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the Reactor Coolant System pressure stabilizes at

>_2215 psig and *2255 psig.

Verify manual seal injection throttle valves are 18 months adjusted to give a flow within the limits of Figure 3.5.5-1.

CALLAWAY PLANT 3.5-11 Amendment No. 150

Seal Injection Flow 3.5.5 Delta P from Charging Header to RCS vs. Total Seal Injection Line Flow T

"J[1[I aCL "190.

. 180.

9L U)

-441-0 150 I:

1*

140 I t4#A#4ýi###

t-tl

- V--

0 130 150' 4iZ t 1 2 4Z'TP7-17TA4-4+2~

-444H14+

"-m 120 7 4 ýHry 3,

iAi7Tht7 trl 4 -t 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Total Seal Injection Line Flow (GPM)

Figure 3.5.5-1 (page 1 of 1)

Delta P from Charging Header to RCS vs. Total Seal Injection Line Flow CALLAWAY PLANT 3.5-12 Amendm ent No. 150