Dry Fuel Storage Update mi NRC Presentation May 2, 2002
Presentation Topics
+ Spent fuel pool capacity (Bill Chapin)
- Project schedule
- Heavy Load movement
+ Licensing actions (Glenn Michael)
- Security overview (Dave Huttie)
NAil
Spent Fuel Pool Capacity
- Loss of full core off load reserve
- Unit 1 Spring 2004
- Unit 2 Fall 2003
- Unit 3 Fall 2004
- Possible pool capacity expansion if needed
Project Schedule
- Concrete Cask fab completed 3131/02
- First Canister delivery 6/28/02
- ISFSI Construction complete 8/19/02
- Security features installed 9115/02
- Dry run practice begins 8/1/02
+ NRC dry run observations mid NoverT
- First system on the pad by Christmas iber
\\d/i
ISFSI Locatmion
uoilonjisuo3 is:jsl 0
Completed VCCs p
41 Ii.
I t
xl,'
7 Cm 0
LM 400 U)
Palo Verdte Dry Cask Storage Principal Components (Cut-away View)
Schedule: Load first system July 2002 Dimensions:
Transfer cask Loaded canister vCC Weight:
Transfer cask Loaded canister vCC Loaded system Adapter Plate with Hydraulic Actuated Doors Vertical Concrete Storage Cask Shielded Transfer Cask Transportable Storage Canister Ht. 16 ft. 11 in.
Dia. 7 ft. 1 in.
Ht. 15 ft. 11 in.
Dia. 5 ft. 7 in.
Ht. 18 ft. 10 in.
Dia. 11ft. 4 in.
Rail Car depicted semi-transparent 60 tons 35 tons 119 tons 154 tons I
now AF' oilift Zloý 7Z
Fuel Services Bill Chapin Department Leader Unit 9767 John Hazelbaker S & L Brian Hansen Kevin Sweeney Acting Section Leader Section Leader 9761 Unit 9766 S........... I.....
Glen Toner Tony Jackson P.M.S.
NAC Direct Cask Related LNAC International Support Equipment Projects Tech/Coord.
Bob Degregorio
-George Walker ISFSI Construction Tie in Mods Equipment Construction Purchase
-Rail Car
-Back Fill
- Transporter
-Welding Equipment
-Vaccum Systems
-Contract Labor LChadwick Jones MAC 2 *
-VAC 3*
Rick Huftman George Andrews Section Leader Section Leader Unit 9769 Unit 9764
'C
- Tech/Coord.
Ray Wong
-Crane Mods
-Gate Seal Mods
-Security Mods
-FuelBId Mods Mike O'connor ask Team Leader
-Brannon Hampton
-Curtis Harris
- 3 VAC *
- 4 VAC **
- 5 VAC **
Bill Ryder Support/ Programs
-Mike Newell
-Bob Hunnicutt
-OPS
-Dave Training -Shea Coordinator/Sch Coordinator/Pin
- Filled by Contractor
- Filled by Interns
- Filled by APS Bids (Posted)
Mike Berryman Refueling
-Dave Bell- (Short)
-Bob Anderson
-Bob Cook-(Restricted)
- Mike Hansford
-Thad MCloud
-Mike O'Connor
-Mike Terry (New)
\\
- 2002 lT
Operations Preparations
- Cask loading process being refined
- Procedure development in progress
- Training development in progress
- Ancillary equipment
- Observe Maine Yankee & Yankee Ro dry runs and fuel loading in 2002
- DSQG checklists used in self assessment we
\\L
Heavy Loads
- Inside Fuel Building
-Single failure proof cranes
-Saflift Hoist for transfer operations
- Movement of Casks to ISFSI
-Rail car and transporter
-Travel path evaluation
- NUREG-0612 & NRCB 96-02 evaluation
+ UFSAR update & 50.59 evaluation
- Component fabrication oversight
-Full time oversight of canister fab
-Transfer cask and auxiliary equip.
- Joint users group audit of NAC week of March 4 -=8
Licensing Actions
+ Exemption from 72.72(d) for fuel records submitted 9/4/01, needed for cask load
+ Exemption for cask seismic and contamination limits needed for cask load
- No Part 50 OLUTS Changes needed
+ QA letter submitted 10/5/01 - no reduction in commitments I
Licensing Actions cont.
- Security Plan - no reduction in effectiveness
-10 CFR 50.54 submittal
- Emergency Plan - no reduction in effectiveness
-10 CFR 50.54 submittal prior to 6/15/02
.72.212 Evaluations
-Expect to complete by 7/31/02
Licensing Actions cont.
+ 50.59 evaluations complete 7/31/02
- 90 day letter submittal expected 8/1/02
- Part 50 UFSAR update complete 11/2/02
- NRC Region IV ISFSINCC construction inspection conducted
- 72.48 program implemented
Licensing Actions cont.
-UMSS 02A (32 assembly design)
- UMS licensing of high burnup fuel requested by 2008
Security Defense In-Depth
- Equipment
- State of the Art Detection and Assessment
- Security Force response
- Staffing to support ISFSI
- Same high level training /qualifications
- Operations
- Training / Procedures SLLEA
- No protracted loss of control AM. 2
Security Technologies
- Perimitrax IDS
- Intrepid Perimeter Detection System
+ Cameras equipped with IR Illuminators
- Fiber Optic Connection To CAS
- Software Integration Design
- Perimeter Lighting >1 ft/candle
Interim Compensatory Measures
+ Immediate Response Capability
- Standoff Distance Considerations
- Temporary VBS
+ Escort Requirements
- Emergency Response Readiness
ISFSI Security Plan Submittal
- 10 CFR 72.212 Compliant
+ 10 CFR 73.55 Compliant
+ 10 CFR 50.54(p) Compliant
- Biometrics
- Sallyport
- Last Access Control Point
- Secondary Power Supply
- Magnetically Secured Gates
Summary
- Schedule
- Licensing
- Security