5/2/02 Meeting Handouts from Arizona Public Service Company for Palo Verde Nuclear Generating Station Units 1, 2, and 3
ML021230008
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/02/2002
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML021230008 (22)


Text

Dry Fuel Storage Update mi NRC Presentation May 2, 2002

Presentation Topics

+ Spent fuel pool capacity (Bill Chapin)

  • Project schedule
  • Heavy Load movement

+ Licensing actions (Glenn Michael)

  • Security overview (Dave Huttie)

NAil

Spent Fuel Pool Capacity

  • Loss of full core off load reserve
  • Unit 1 Spring 2004
  • Unit 2 Fall 2003
  • Unit 3 Fall 2004
  • Possible pool capacity expansion if needed

Project Schedule

  • Concrete Cask fab completed 3131/02
  • First Canister delivery 6/28/02
  • ISFSI Construction complete 8/19/02
  • Security features installed 9115/02
  • Dry run practice begins 8/1/02

+ NRC dry run observations mid NoverT

  • First system on the pad by Christmas iber

\\d/i

ISFSI Locatmion

uoilonjisuo3 is:jsl 0

Completed VCCs p

41 Ii.

I t

xl,'

7 Cm 0

LM 400 U)

Palo Verdte Dry Cask Storage Principal Components (Cut-away View)

Schedule: Load first system July 2002 Dimensions:

Transfer cask Loaded canister vCC Weight:

Transfer cask Loaded canister vCC Loaded system Adapter Plate with Hydraulic Actuated Doors Vertical Concrete Storage Cask Shielded Transfer Cask Transportable Storage Canister Ht. 16 ft. 11 in.

Dia. 7 ft. 1 in.

Ht. 15 ft. 11 in.

Dia. 5 ft. 7 in.

Ht. 18 ft. 10 in.

Dia. 11ft. 4 in.

Rail Car depicted semi-transparent 60 tons 35 tons 119 tons 154 tons I

now AF' oilift Zloý 7Z

Fuel Services Bill Chapin Department Leader Unit 9767 John Hazelbaker S & L Brian Hansen Kevin Sweeney Acting Section Leader Section Leader 9761 Unit 9766 S........... I.....

Glen Toner Tony Jackson P.M.S.

NAC Direct Cask Related LNAC International Support Equipment Projects Tech/Coord.

Bob Degregorio

-George Walker ISFSI Construction Tie in Mods Equipment Construction Purchase

-Rail Car

-Back Fill

- Transporter

-Welding Equipment

-Vaccum Systems

-Contract Labor LChadwick Jones MAC 2 *

-VAC 3*

Rick Huftman George Andrews Section Leader Section Leader Unit 9769 Unit 9764

'C

- Tech/Coord.

Ray Wong

-Crane Mods

-Gate Seal Mods

-Security Mods

-FuelBId Mods Mike O'connor ask Team Leader

-Brannon Hampton

-Curtis Harris

  1. 3 VAC *
  1. 4 VAC **
  1. 5 VAC **

Bill Ryder Support/ Programs

-Mike Newell

-Bob Hunnicutt

-OPS

-Dave Training -Shea Coordinator/Sch Coordinator/Pin

  • Filled by Contractor
    • Filled by Interns
  • Filled by APS Bids (Posted)

Mike Berryman Refueling

-Dave Bell- (Short)

-Bob Anderson

-Bob Cook-(Restricted)

- Mike Hansford

-Thad MCloud

-Mike O'Connor

-Mike Terry (New)

\\

- 2002 lT

Operations Preparations

  • Cask loading process being refined
  • Procedure development in progress
  • Training development in progress
  • Ancillary equipment
  • Observe Maine Yankee & Yankee Ro dry runs and fuel loading in 2002
  • DSQG checklists used in self assessment we

\\L

Heavy Loads

  • Inside Fuel Building

-Single failure proof cranes

-Saflift Hoist for transfer operations

  • Movement of Casks to ISFSI

-Rail car and transporter

-Travel path evaluation

+ UFSAR update & 50.59 evaluation

APS QA Activities

  • Component fabrication oversight

-Full time oversight of canister fab

-Transfer cask and auxiliary equip.

  • Joint users group audit of NAC week of March 4 -=8

Licensing Actions

+ Exemption from 72.72(d) for fuel records submitted 9/4/01, needed for cask load

+ Exemption for cask seismic and contamination limits needed for cask load

  • No Part 50 OLUTS Changes needed

+ QA letter submitted 10/5/01 - no reduction in commitments I

Licensing Actions cont.

  • Security Plan - no reduction in effectiveness

-10 CFR 50.54 submittal

-10 CFR 50.54 submittal prior to 6/15/02

.72.212 Evaluations

-Expect to complete by 7/31/02

Licensing Actions cont.

+ 50.59 evaluations complete 7/31/02

  • 90 day letter submittal expected 8/1/02
  • Part 50 UFSAR update complete 11/2/02
  • NRC Region IV ISFSINCC construction inspection conducted
  • 72.48 program implemented

Licensing Actions cont.

  • NAC UMS CoC Amendment Requests desired by APS UMSS 02B & 02C (enhancements)

-UMSS 02A (32 assembly design)

  • UMS licensing of high burnup fuel requested by 2008

Security Defense In-Depth

  • Equipment

- State of the Art Detection and Assessment

  • Security Force response

- Staffing to support ISFSI

- Same high level training /qualifications

  • Operations

- Training / Procedures SLLEA

- No protracted loss of control AM. 2

Security Technologies

  • Intrepid Perimeter Detection System

+ Cameras equipped with IR Illuminators

  • Fiber Optic Connection To CAS
  • Software Integration Design
  • Perimeter Lighting >1 ft/candle

Interim Compensatory Measures

+ Immediate Response Capability

  • Standoff Distance Considerations

+ Escort Requirements

  • Emergency Response Readiness

ISFSI Security Plan Submittal

+ 10 CFR 73.55 Compliant

+ 10 CFR 50.54(p) Compliant

- Biometrics

- Sallyport

- Last Access Control Point

- Secondary Power Supply

- Magnetically Secured Gates

Summary

  • Schedule
  • Licensing