D uke LWEnergy.
SAFEGUARDS INFORMATION H. B. Barron Vice President Duke Energy Corporation McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-9340 (704) 875-4800 OFFICE (704) 875-4809 FAX April 30, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
SUBJECT:
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Revised Response to Item 5.d of the NRC Order for Interim Safeguards and Security Compensatory Measures for McGuire Nuclear Station dated February 25, 2002
REFERENCES:
- 1)
Letter, Duke Energy Corporation to U.S. Nuclear Regulatory Commission, Document Control Desk, Dated March 18, 2002,
SUBJECT:
Response to NRC Order for Interim Safeguards and Security Compensatory Measures for McGuire Nuclear Station dated February 25, 2002.
- 2)
Letter, Duke Energy Corporation to U.S. Nuclear Regulatory Commission, Mr. Samuel J. Collins, Dated March 18, 2002,
SUBJECT:
Request for Extension of Time to Submit an Answer and Request a Hearing Gentlemen:
By Reference 1, McGuire Nuclear Station submitted its response to the Interim Safeguards and Security Compensatory Measures Order ("Order") issued by the United States Nuclear Regulatory Commission ("NRC") on February 25, 2002 for McGuire Nuclear Station Units 1 and 2. By Reference 2, McGuire submitted a request for an extension of time in which to submit an answer and request a hearing regarding the order. A conference call was held on April 16, 2002 with members of the NRC to discuss the McGuire response to the Order. As a result of the conference call, the NRC requested that McGuire revise the response to Item 5.d to provide additional details to facilitate NRC review.
NOTICE: Attachment 1 to this letter contains "SAFEGUARDS INFORMATION."
Upon separation of the, this letter is "DECONTROLLED."
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION U. S. Nuclear Regulatory Commission April 30, 2002 Page 2 In accordance with 10 C.F.R. § 50.4, Duke Energy Corporation hereby submits a revised response to Item 5.d of the Order. Attachment 1 to this letter contains safeguards information, as defined in 10 C.F.R. § 73.21. Duke Energy Corporation therefore requests that Attachment 1 be withheld from public disclosure.
The response and schedule for achieving compliance is based on our understanding of Expectations and Guidance, as documented in the March 8, 2002 letter from the Nuclear Energy Institute (NEI) to Chief Nuclear Officers providing Security Order Guidance. This guidance was determined to be an acceptable method for licensee implementation of the interim compensatory measures in a letter to Mr. Ralph Beedle, Senior Vice President and Chief Nuclear Officer, NEI from Mr. Sam Collins, Director, Office of Nuclear Reactor Regulation, dated March 11, 2002.
In addition, the NRC requested clarification on extensions being requested in Reference 2.
McGuire Nuclear Station requests an extension of time until June 14, 2002 to supplement the response to the Order and an equal extension of time in which to request a hearing for item B. 1.c.
McGuire hereby withdraws the subject request for items B.2.a(l) and B.2.a(2).
After further evaluation, McGuire has concluded that an extension of these items is not necessary. to this letter contains "Safeguards Information."
Upon separation of, this cover letter is to be considered DECONTROLLED.
Questions regarding this submittal should be directed to Kay L. Crane, McGuire Regulatory Compliance at (704) 875-4306.
H. B. Barron Attachment STATE OF NORTH CAROLINA The above-subscribed individual appeared before me and made oath that he is duly authorized to execute this response on behalf of Duke Energy Corporation, the statements contained within this response are true to the best of his knowledge and belief, and that copies of the response were sent to the addressee and listed individuals.
Before me,
.Q*LataL
_0.-A,- 00)
My Commission Expires:
Notary Public
- bt wra C. la.
SAFEGUARDS INFORMATION
U. S. Nuclear Regulatory Commission April 30, 2002 Page 3 CC:
Secretary (without attachments)
Office of the Secretary U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555-0001 Mr. L. A. Reyes U.S. NRC Regional Administrator Region II Atlanta Federal Center 61 Forsyth Street, S.W, Suite 23T85 Atlanta. GA 30303 Mr. Samuel J. Collins Director, Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North Room 5 D2, Mail Stop 0-5 E7 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 (signed original and three copies)
Assistant General Counsel for Materials Litigation and Enforcement (without attachments)
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. R. E. Martin, McGuire Project Manager U. S. Nuclear Regulatory Commission Mail Stop 08G9 One White Flint North 1555 Rockville Pike Rockville, Maryland 20852-2738 SAFEGUARDS INFORMATION