ML021190388

From kanterella
Jump to navigation Jump to search
March 2002 Monthly Operating Report for Nine Mile Point, Unit 1
ML021190388
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/09/2002
From: Hopkins L
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1658
Download: ML021190388 (4)


Text

P.O. Box 63 Lycoming, New York 13093 0

Constellation Nuclear Nine Mile Point April 9, 2002 Nuclear Station NMPIL 1658 A Member of the Constellation Energy Group U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Subject:

Monthly Operating Report for March 2002 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for March 2002 for the Nine Mile Point Nuclear Station Unit 1.

Submittal of this information complies with Section 6.9.1.c of the Unit 1 Technical Specifications.

Very truly yours, L A I4v-.2-Lawrence A. Hopkins Unit 1 Plant General Manager LAH/jm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management

ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 4/2/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 OPERATING STATUS Unit Name: Nine Mile Point Unit #1 Reporting Period: March 2002 Design Electrical Rating: (Net MWe)

Maximum Dependable Capacity: (Net MWe) 613 565 Critical Hours Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744.0 744.0 0.0 458,610.0 Yr-to-Date 2,160.0 2,160.0 0.0 1,330,312.0 Cumulative 199,182.1 194,828.2 20.4 108,361,131.0 3

4 5

6

ATTACHMENT B UNIT SHUTDOWNS REPORTING PERIOD - MARCH 2002 (1)

Reason A.

Equipment Failure (Explain)

B.

Maintenance or Test C.

Refueling D.

Regulatory Restriction E.

Operator Training/License Examination F.

Administrative G.

Operational Error (Explain)

H.

Other (Explain)

  • NOTE: Sequential numbering used.

DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 4/2/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 (2)

Method

1.

Manual

2.

Manual Trip/Scram

3.

Automatic Trip/Scram

4.

Continuation

5.

Other (Explain)

TYPE NO.*

DATE F: FORCED DURATION REASONS' METHOD OF SHUTTING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED (HOURS)

DOWN2 COMMENTS No shutdown occurred in March 2002

ATTACHMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 4/2/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 The unit operated during the month of March 2002 with a Net Electrical Design capacity factor of 100.6 percent. There were no challenges to the electromatic relief valves or safety valves during the operating period.