April 16, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RESCHEDULING OF BRAIDWOOD INSERVICE INSPECTION ACTIVITIES INSPECTION
Dear Mr. Skolds:
Due to emerging issues, we have decided to reschedule the upcoming Braidwood Inservice Inspection (ISI) Activities inspection. The original dates of the inspection were April 29 - May 3, 2002. Although we will reschedule the ISI Activities inspection, we will observe the Unit 2 head inspection that you plan to perform on April 25, 2002, as part of your response to Bulletin 2002-
- 01. A revised schedule for review of your ISI Activities will be coordinated with your staff.
These changes have been discussed with your staff. If you have questions regarding the NRC actions discussed above, please contact Mr. John Jacobson at 630-829-9736.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,
/RA/
John M. Jacobson, Chief Mechanical Engineering Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution
April 16, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
RESCHEDULING OF BRAIDWOOD INSERVICE INSPECTION ACTIVITIES INSPECTION
Dear Mr. Skolds:
Due to emerging issues, we have decided to reschedule the upcoming Braidwood Inservice Inspection (ISI) Activities inspection. The original dates of the inspection were April 29 - May 3, 2002. Although we will reschedule the ISI Activities inspection, we will observe the Unit 2 head inspection that you plan to perform on April 25, 2002, as part of your response to Bulletin 2002-
- 01. A revised schedule for review of your ISI Activities will be coordinated with your staff.
These changes have been discussed with your staff. If you have questions regarding the NRC actions discussed above, please contact Mr. John Jacobson at 630-829-9736.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,
/RA/
John M. Jacobson, Chief Mechanical Engineering Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution
J. Skolds cc:
Site Vice President - Braidwood Braidwood Station Plant Manager Regulatory Assurance Manager - Braidwood Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission
J.. Skolds cc:
Site Vice President - Braidwood Braidwood Station Plant Manager Regulatory Assurance Manager - Braidwood Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission ADAMS Distribution:
AJM DFT MLC RidsNrrDipmIipb GEG HBC CJP3 C. Ariano (hard copy)
DRPIII DRSIII PLB1 JRK1 DOCUMENT NAME: G:/DRS Rescheduling of Braidwood Inservice Inspection.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME DJones JJacobson AMStone DATE 04/16/02 04/16/02 04/16/02 OFFICIAL RECORD COPY