Tech Spec Pages for Amendment 211 to Revise the Post Accident Monitoring Instrumentation Technical Specifications
ML021160638
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/25/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB2947
Download: ML021160638 (4)


Text

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTES ---------------------------------------

1. LCO 3.0.4 is not applicable.
2. Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable, status.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.7.

met.

(continued)

INDIAN POINT 3 3.3.3-1 Amendment 2-G5,211

PAM Instrumentation 3.3.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Restore one channel to 7 days with two required OPERABLE status.

channels inoperable.

OR One required Thot channel and two required Core Exit Temperature channels inoperable.

OR One required Tcold channel and two required SG Pressure channels inoperable.

OR One required Main Steam Line Radiation channel and two required SG Water Level (Narrow Range) channels inoperable.

D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Table Time of Condition C not 3.3.3-1 for the met. channel.

E. As required by Required E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action D.1 and referenced in AND Table 3.3.3-1. E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. As required by Required F.1 Initiate action in Immediately Action D.1 and accordance with referenced in Specification 5.6.7.

Table 3.3.3-1.

3.3.3-2 Amendment 2-9. 211 INDIAN POINT 3

PAM Instrumentation 3.3.3 Table 3.3.3-1 (page 1 of 2)

Post Accident Monitoring Instrumentation CONDITION REFERENCED FROM REQUIRED SR 3.3.3.2 FUNCTION REQUIRED CHANNELS ACTION D.1 FREQUENCY

1. Neutron Flux 2 F 24 months 1 per loop E 24 months
2. RCS Hot Leg Temperature, (Wide Range)

(Thot)

3. RCS Cold Leg Temperature (Wide Range) 1 per loop 24 months (Tcold)

E 24 months

4. RCS Pressure (Wide Range) 2 2 E 24 months
5. Reactor Vessel Water Level 2 E 24 months
6. Containment Water Level (Wide Range) 2 E 24 months
7. Containment Water Level (Recirculation Sump) 2 E 18 months
8. Containment Pressure 2 per penetration flow F 24 months
9. Automatic Containment Isolation Valve Position path(a)(b) 2 F 24 months
10. Containment Area Radiation (High Range) 2(c) E 92 days
11. Containment Hydrogen Monitors 2 E 24 months
12. Pressurizer Level 2 per SG E 24 months
13. SG Water Level (Narrow Range) 1 each per SG E 24 months, SGL
14. SG Water Level (Wide Range) and 18 months, AFF Auxiliary Feedwater Flow
15. NOT USED
16. SG Pressure 2 per SG 24 months 2 F 24 months
17. Condensate Storage Tank Level 2(d) E 24 months
18. Core Exit Temperature-Quadrant 1 2(d) E 24 months
19. Core Exit Temperature-Quadrant 2 2(d) E 24 months
20. Core Exit Temperature-Quadrant 3 2(d) E 24 months
21. Core Exit Temperature-Quadrant 4 1 per steam line F 24 months
22. Main Steam Line Radiation 2 F 24 months
23. Gross Failed Fuel Detector 2 E 24 months
24. RCS Subcooling See NOTES, next page.

(continued)

INDIAN POINT 3 3.3.3-4 Amendment 2QO5, 211

PAM Instrumentation 3.3.3 Table 3.3.3-1 (page 2 of 2)

Post Accident Monitoring Instrumentation NOTES:

(a) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

(c) Hydrogen monitor OPERABILITY requires that at least one of the associated containment fan cooler unit is OPERABLE.

(d) A channel consists of two core exit thermocouples (CETs).

INDIAN POINT 3 3.3.3-5 Amendment 2J5, 211