April 25, 2002 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Daniel S. Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC) AND THEIR CONSULTANTS REGARDING ON-GOING PRESSURIZED THERMAL SHOCK (PTS)

RULE MAKING EFFORT FACILITY:

Beaver Valley Power Station (BVPS), Unit No. 1 DATE & TIME:

Tuesday, May 14, 2002, 9:00 a.m. to 4:00 p.m.

LOCATION:

Beaver Valley Power Station Training Facility - Simulator Building, Classroom 1 Shippingport, PA 15077 PURPOSE:

To discuss preliminary results of the Probabilistic Risk Analysis (PRA),

Human Reliability Analysis (HRA), and Thermal Hydraulic (TH) portions of the PTS risk analysis being performed cooperatively by the Nuclear Regulatory Commission (NRC) and FENOC. Results of this analysis are being considered as part of a joint NRC and nuclear industry effort to determine if the current PTS Rule (10 CFR 50.61) should be revised.

R. Laufer PARTICIPANTS:*

Participants from the NRC include members of the Office of Nuclear Regulatory Research (RES) and NRC contractors from Sandia National Laboratory (SNL), and Science Applications International Corporation (SAIC).

NRC and Contractors FENOC Westinghouse H. (Roy) Woods, RES D. Weakland B. Bishop D. Whitehead, SNL W. Etzel B. Sloan A. Kolaczkowski, SAIC K. Frederick et al.

B. Sepelak

Enclosure:

Proposed Agenda Docket No.: 50-334 cc w/encl: See next page CONTACT: H. Woods, RES (301) 415-6622

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to Commission Policy Statement on Staff Meetings Open to the Public (65 Federal Register 56964, 9/20/00).

R. Laufer PARTICIPANTS:*

Participants from the NRC include members of the Office of Nuclear Regulatory Research (RES) and NRC contractors from Sandia National Laboratory (SNL), and Science Applications International Corporation (SAIC).

NRC and Contractors FENOC Westinghouse H. (Roy) Woods, RES D. Weakland B. Bishop D. Whitehead, SNL W. Etzel B. Sloan A. Kolaczkowski, SAIC K. Frederick et al.

B. Sepelak

Enclosure:

Proposed Agenda Docket No.: 50-334 cc w/encl: See next page CONTACT: H. Woods, RES (301) 415-6622

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to Commission Policy Statement on Staff Meetings Open to the Public (65 Federal Register 56964, 9/20/00).

DISTRIBUTION:

PUBLIC PDI-1 RF OGC J. Zwolinski/T. Marsh ACRS B. Sheron S. Richards R. Laufer D. Collins D. McCain M. OBrien T. Bergman, RI, EDO OPA J. Rogge, RI R. Conte, RI D. Kern, RI D. Screnci, RI H. Woods, RES N. Siu, RES K. Johnson B. Platchek, RI PMNS (Meeting Announcement Coordinator)

Accession No.: ML021160300 OFC PM/PDI-1 RES RES LA/PDI-2 SC/PDI-1 NAME DCollins HWoods ARubin MOBrien RLaufer DATE 4/25/02 4/25/02 4/25/02 4/25/02 4/25/02 OFFICIAL RECORD COPY

PROPOSED AGENDA FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC) AND THEIR CONSULTANTS REGARDING ON-GOING PRESSURIZED THERMAL SHOCK (PTS) RULE MAKING EFFORT May 14, 2002, 9:00 a.m. - 4:00 p.m.

9:00-9:30 Introduction/Overview H. (Roy) Woods (NRC)

Introduction of Attendees (NRC and FENOC)

Purpose/Goals of Meeting Status/Schedule of PTS Program 9:30-11:00 Presentation of PRA Approach Donnie Whitehead (SNL) and Preliminary Results Alan Kolaczkowski (SAIC) 11:00-12:00 Discussion All (NRC and FENOC) 12:00-1:00 Lunch 1:00-3:30 Continuation of Discussion All (NRC and FENOC) 3:30-4:00 Summary (Action Items, Commitments)

All (NRC and FENOC)

Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Corrective Action Section Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 L. W. Pearce, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Bureau of Radiation Protection ATTN: Larry Ryan P O Box 2063 Harrisburg, PA 17120 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: M. P. Pearson, Director Services and Projects (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077