Meeting with Firstenergy Nuclear Operating Company Re On-Going Pressurized Thermal Shock Rule Making Effort
ML021160300
Person / Time
Site: Beaver Valley
Issue date: 04/25/2002
From: Dan Collins
NRC/NRR/DLPM/LPD1
To: Richard Laufer
NRC/NRR/DLPM/LPD1
Collins D S, NRR/DLPM, 415-1427
References
Download: ML021160300 (5)


Text

April 25, 2002 MEMORANDUM TO: Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Daniel S. Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC) AND THEIR CONSULTANTS REGARDING ON-GOING PRESSURIZED THERMAL SHOCK (PTS)

RULE MAKING EFFORT FACILITY: Beaver Valley Power Station (BVPS), Unit No. 1 DATE & TIME: Tuesday, May 14, 2002, 9:00 a.m. to 4:00 p.m.

LOCATION: Beaver Valley Power Station Training Facility - Simulator Building, Classroom 1 Shippingport, PA 15077 PURPOSE: To discuss preliminary results of the Probabilistic Risk Analysis (PRA),

Human Reliability Analysis (HRA), and Thermal Hydraulic (TH) portions of the PTS risk analysis being performed cooperatively by the Nuclear Regulatory Commission (NRC) and FENOC. Results of this analysis are being considered as part of a joint NRC and nuclear industry effort to determine if the current PTS Rule (10 CFR 50.61) should be revised.

R. Laufer PARTICIPANTS:* Participants from the NRC include members of the Office of Nuclear Regulatory Research (RES) and NRC contractors from Sandia National Laboratory (SNL), and Science Applications International Corporation (SAIC).

NRC and Contractors FENOC Westinghouse H. (Roy) Woods, RES D. Weakland B. Bishop D. Whitehead, SNL W. Etzel B. Sloan A. Kolaczkowski, SAIC K. Frederick et al.

B. Sepelak

Enclosure:

Proposed Agenda Docket No.: 50-334 cc w/encl: See next page CONTACT: H. Woods, RES (301) 415-6622

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to Commission Policy Statement on Staff Meetings Open to the Public (65 Federal Register 56964, 9/20/00).

R. Laufer PARTICIPANTS:* Participants from the NRC include members of the Office of Nuclear Regulatory Research (RES) and NRC contractors from Sandia National Laboratory (SNL), and Science Applications International Corporation (SAIC).

NRC and Contractors FENOC Westinghouse H. (Roy) Woods, RES D. Weakland B. Bishop D. Whitehead, SNL W. Etzel B. Sloan A. Kolaczkowski, SAIC K. Frederick et al.

B. Sepelak

Enclosure:

Proposed Agenda Docket No.: 50-334 cc w/encl: See next page CONTACT: H. Woods, RES (301) 415-6622

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to Commission Policy Statement on Staff Meetings Open to the Public (65 Federal Register 56964, 9/20/00).

DISTRIBUTION:

PUBLIC PDI-1 RF OGC J. Zwolinski/T. Marsh ACRS B. Sheron S. Richards R. Laufer D. Collins D. McCain M. OBrien T. Bergman, RI, EDO OPA J. Rogge, RI R. Conte, RI D. Kern, RI D. Screnci, RI H. Woods, RES N. Siu, RES K. Johnson B. Platchek, RI PMNS (Meeting Announcement Coordinator)

Accession No.: ML021160300 OFC PM/PDI-1 RES RES LA/PDI-2 SC/PDI-1 NAME DCollins HWoods ARubin MOBrien RLaufer DATE 4/25/02 4/25/02 4/25/02 4/25/02 4/25/02 OFFICIAL RECORD COPY

PROPOSED AGENDA FORTHCOMING MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC) AND THEIR CONSULTANTS REGARDING ON-GOING PRESSURIZED THERMAL SHOCK (PTS) RULE MAKING EFFORT May 14, 2002, 9:00 a.m. - 4:00 p.m.

9:00-9:30 Introduction/Overview H. (Roy) Woods (NRC)

Introduction of Attendees (NRC and FENOC)

Purpose/Goals of Meeting Status/Schedule of PTS Program 9:30-11:00 Presentation of PRA Approach Donnie Whitehead (SNL) and Preliminary Results Alan Kolaczkowski (SAIC) 11:00-12:00 Discussion All (NRC and FENOC) 12:00-1:00 Lunch 1:00-3:30 Continuation of Discussion All (NRC and FENOC) 3:30-4:00 Summary (Action Items, Commitments) All (NRC and FENOC)

Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney Bureau of Radiation Protection FirstEnergy Nuclear Operating Company ATTN: Larry Ryan FirstEnergy Corporation P O Box 2063 76 South Main Street Harrisburg, PA 17120 Akron, OH 44308 Mayor of the Borough of FirstEnergy Nuclear Operating Company Shippingport Regulatory Affairs/Corrective Action Section P O Box 3 Larry R. Freeland, Manager Shippingport, PA 15077 Beaver Valley Power Station Post Office Box 4, BV-A Regional Administrator, Region I Shippingport, PA 15077 U.S. Nuclear Regulatory Commission 475 Allendale Road Commissioner James R. Lewis King of Prussia, PA 19406 West Virginia Division of Labor 749-B, Building No. 6 Resident Inspector Capitol Complex U.S. Nuclear Regulatory Commission Charleston, WV 25305 Post Office Box 298 Shippingport, PA 15077 Director, Utilities Department Public Utilities Commission FirstEnergy Nuclear Operating Company 180 East Broad Street Beaver Valley Power Station Columbus, OH 43266-0573 ATTN: M. P. Pearson, Director Services and Projects (BV-IPAB)

Director, Pennsylvania Emergency Post Office Box 4 Management Agency Shippingport, PA 15077 2605 Interstate Dr.

Harrisburg, PA 17110-9364 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Ohio EPA-DERR Mr. B. F. Sepelak ATTN: Zack A. Clayton Post Office Box 4, BV-A Post Office Box 1049 Shippingport, PA 15077 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 L. W. Pearce, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077