March 2002 Monthly Operating Report for Nine Mile Point Unit 2
ML021140296
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/08/2002
From: Peckham M
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L 2055
Download: ML021140296 (9)


Text

P.O. Box 63 Lycoming, New York 13093 Constellation Nuclear Nine Mile Point Nuclear Station A Member of the Constellation Energy Group April 8, 2002 NMP2L 2055 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Monthly Operating Report for March 2002 Gentlemen:

Submitted herewith is the Operating Data Report, the Unit Shutdowns, and Summary of Operating Experience for March, 2002.

Very truly yours, M.F. Peckham Unit 2 Plant General Manager MFP/jm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management

Subject:

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #2

SUMMARY

OF OPERATING EXPERIENCE Nine Mile Point Unit Two operated with a capacity factor (MDC) of 48.14% and an availability factor of 48.33% for the month of March 2002.

On March 7, 2002 at 1028 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91154e-4 months <br />, extraction steam isolation valve 2ESS-MOV28B closed on hi-hi level in the 5 ' point "B" feedwater heater. Power was lowered to approximately 88%. Repairs to the "B" feedwater heater string level controls were performed and the unit returned to full power the same day at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />.

Power reduction for Refuel Outage RFO-08 commenced at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> on March 15, 2002. The Main Turbine was removed from service at 2333 hours0.027 days <br />0.648 hours <br />0.00386 weeks <br />8.877065e-4 months <br /> on March 15, 2002 and the Reactor Mode switch was placed in shutdown at 0156 hours0.00181 days <br />0.0433 hours <br />2.579365e-4 weeks <br />5.9358e-5 months <br /> on March 16, 2002.

There were no challenges to the safety relief valves during this reporting period.

UNIT SHUTDOWNS APPENDIX B REPORTING PERIOD - March 2002 Prepared by: T. McMahon Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain)

DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 04/05/02 TELEPHONE: (315) 349-4045 Method:

I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

Duration Method of Cause & Corrective Actions No.

Date Type (Hours)

Reasons' Shutting Down 2 Comments F:Forced S: Scheduled 02-01 020315 S

384.4 C

Shutdown for refueling and maintenance activities

OPERATING DATA REPORT DOCKET NO.: 50-410 DATE: 04/04/02 PREPARED BY: T. McMahon TELEPHONE: (315) 349-4045 OPERATING STATUS Unit Name:

Reporting Period:

Design Electrical Rating (MWe)

Maximum Dependable Capacity (Net MWe):

Nine Mile Point Unit #2 March 2002 1143.3 1119.8

3. Number of Hours Reactor was Critical
4. Hours Generator On-Line
5. Reactor Reserve Shutdown Hours
6. Net Electrical Energy Gen. (MWH)

This Month 361.9 359.6 0.0 401,088.7 Yr-to-Date 1,777.9 1,775.6 0.0 2,023,046.3 Cumulative 96,981.2 94,156.5 0.0 98,081,379.0

1.

2.

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM

.Sa"m41iw of Oayzl Applicability:

References:

DER Prepared:

_"____5 Print El Unit 1

(ýriUnit Developmental Review El Ucensing E Engineering V

2 El Site Due Date:

//

NCTS Othdr 7-2=,

7Z-,3, 7

-11ý17' SignatureDae

/

Name Si-nature PT, G

)o.'

c A~I TechnicallSafety Reviews Technical Review El N/R Designees:

SORC:

E] N/R SRAB:

El N/R Final Review El Engineering Manager El Generation:

Dl Tech Spec 6.5.2 (CTS)

QATR (ITS)

  • "Verification El Other e-Meeting No.:

Meeting No.:

Operations Manager Tech Support Manager Maintenance Manager El iAttorney El Ucensing Manager Plant Manager El Other El Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence El N/R E-1 N/R El N/R LDCR #

NCTS #s El Completed per NLAP-RPR-0 1 on (date)

Page 17 Di Generation El Other NIP-IRG-01 Rev 17 M,

Ile C, k 4, 1,,

I*e wc e, N z WNGW Document A114 /)--

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM NZ INN Document A/Allt0 Sowma,-X o e

0

/

I't ek ic-Applicability:

U Unit 1

References:

DER Prepared: 7"C/4/-a5 7?

"-1lo a,

Print Developmental Review

[] Ucensing EL Engineering f1 Generation

{rUnit 2 NCT Site DueDate: o'r/9

,,k1 NCTS iOthar Signature Date/

Name Signature 6Fe a t C"-'I-Li Other TechnicallSafety Reviews Technical Review. EL N/R Designees:

SORC:

EL N/R SRAB:

EL N/R Final Review Li Engineering Manager Li Generation:

Operations Manager Tech Support Manager Maintenance Manager Li OAttoney El Ucensing Manager V Plant Manager EL Other EL Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence El Tech Spec 6.5.2 (CTS)

QATR (ITS)

(,I Cl~cac-ri grVerification El Other Meeting No.:

Meeting No.:

mi

/le ck 4. -,,

EL N/R L-N/R El N/R LDCR #

NCTS #*s EL Completed per NLAP-RPR-01 on (date)

Page 17 NIP-IRG-01 Rev 17 Aga::

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM WKDocument: AIJ'1 /2' J-.SawnJ,ni~a of C0C i-Ai 46~

Applicability:

L Unit 1

References:

DER Prepared:

c7"-h*,'$1e /

v Ai q ti Print Developmental Review o Ucensing El Engineering N-Generation N'Unit LI El Site Due Date:

//,*

k NCTS ignathtr Dat7/

/

Signature Date/

Name Signature A

&4kCf;-1 -

El Other TechnicallSafety Reviews Technical Review: El N/R Designees:

SORC:

El NIR SRAB:

El N/R Final Review El Engineering Manager El Generation:

El Tech Spec 6.5.2 (CTS)

QATR (ITS)

E'Verification El Other C(ý L4OCC.1 Meeting No.:

Meeting No.:

Operations Manager Tech Support Manager Maintenance Manager El WAttomey El Ucensing Manager Plant Manager

[] Other El Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence 11 N/R El MR 11 WR LDCR #

NCTS #Vs El Completed per NLAP-RPR-01 on (date)

Page 17 e Ka~e7-7ý-4 o'l NIP-IRG-01 Rev 17 M, PC r'-i

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Rwiimpnt AIbI P2.

Applicability:

References:

DER Prepared: Them,, 5 Print Developmental Review El Licensing 13 Engineering El Unit 1 SQm,iavsI nf ed: 4 4 Ii1x,.i1 rbgce

YUnit 2

/

El Site NCTS Signature Name

/7 Due Date: '9"///S /

Other

j',.,

Signature

&ascU-2 e-TechnicallSafety Reviews Technical Review: El N/R Designees:

SORC:

El N/R SRAB:

El N/R Final Review El Engineering Manager El Generation:

El Tech Spec 6.5.2 (CTS)

QATR (ITS)

ErVerification El Other O-,

04(?hOtll Meeting No.:

Meeting No.:

Operations Manager Tech Support Manager Maintenance Manager El Attorney El Licensing Manager IN Plant Manager El Other El Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence El N/R El N/R El N/R LDCR #

NCTS V

_s El Completed per NLAP-RPR-01 on (date)

Page 17 SGeneration El Other NIP-IRG-01 Rev 17 Dcmn

. /0 1-1 J

0

,0.

,d 4

4; le t-9--

Ir

" 1...

M, lleckka,+,

e/

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM fN m D

m ent:

A

-1/

0 -2 _

yee of Applicability:

References:

DER Prepared: _7-_/1

,7_5 Print Developmental Review

[] Ucensing E-Engineering El Unit 1

[rUnit 2 El Site NCTS Signature Name 1/

Due Date: i///,

/

L.

Other

/: Z

,.5, 1

S ateau/

_Signature 1-.

G~evakd;- e.

DT.,

'qJ*

<*A,

  • g S

Technical/Safety Reviews Technical Review El N/R Designees:

SORC:

El N/R SRAB:

El N/R Final Review El Engineering Manager El Generation:

El Tech Spec 6.5.2 (CTS)

QATR (ITS)

I"ý pal? -10At ErVerification 11 Other

*t/6>

4 cz

Meeting No.:

Meeting No.:

Operations Manager Tech Support Manager Maintenance Manager El1Attorney Licensing Manager Plant Manager El Other El Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence 1:1 N/R El N/R

[] N/R LOCR #

NCTS 9s El Completed per NLAP-RPR-01 on (date)

Page 17 IN-Generation El Other NIP-IRG-01 Rev 17 J

  • vwl,,*,

Vf 1e,-tc e-

ý,rA, -Z N...,

- -\\