ML021140296
| ML021140296 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/08/2002 |
| From: | Peckham M Constellation Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NMP2L 2055 | |
| Download: ML021140296 (9) | |
Text
P.O. Box 63 Lycoming, New York 13093 Constellation Nuclear Nine Mile Point Nuclear Station A Member of the Constellation Energy Group April 8, 2002 NMP2L 2055 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Monthly Operating Report for March 2002 Gentlemen:
Submitted herewith is the Operating Data Report, the Unit Shutdowns, and Summary of Operating Experience for March, 2002.
Very truly yours, M.F. Peckham Unit 2 Plant General Manager MFP/jm Attachments cc:
Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management
Subject:
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #2
SUMMARY
OF OPERATING EXPERIENCE Nine Mile Point Unit Two operated with a capacity factor (MDC) of 48.14% and an availability factor of 48.33% for the month of March 2002.
On March 7, 2002 at 1028 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91154e-4 months <br />, extraction steam isolation valve 2ESS-MOV28B closed on hi-hi level in the 5 ' point "B" feedwater heater. Power was lowered to approximately 88%. Repairs to the "B" feedwater heater string level controls were performed and the unit returned to full power the same day at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />.
Power reduction for Refuel Outage RFO-08 commenced at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> on March 15, 2002. The Main Turbine was removed from service at 2333 hours0.027 days <br />0.648 hours <br />0.00386 weeks <br />8.877065e-4 months <br /> on March 15, 2002 and the Reactor Mode switch was placed in shutdown at 0156 hours0.00181 days <br />0.0433 hours <br />2.579365e-4 weeks <br />5.9358e-5 months <br /> on March 16, 2002.
There were no challenges to the safety relief valves during this reporting period.
UNIT SHUTDOWNS APPENDIX B REPORTING PERIOD - March 2002 Prepared by: T. McMahon Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain)
DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 04/05/02 TELEPHONE: (315) 349-4045 Method:
I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)
Duration Method of Cause & Corrective Actions No.
Date Type (Hours)
Reasons' Shutting Down 2 Comments F:Forced S: Scheduled 02-01 020315 S
384.4 C
Shutdown for refueling and maintenance activities
OPERATING DATA REPORT DOCKET NO.: 50-410 DATE: 04/04/02 PREPARED BY: T. McMahon TELEPHONE: (315) 349-4045 OPERATING STATUS Unit Name:
Reporting Period:
Design Electrical Rating (MWe)
Maximum Dependable Capacity (Net MWe):
Nine Mile Point Unit #2 March 2002 1143.3 1119.8
- 3. Number of Hours Reactor was Critical
- 4. Hours Generator On-Line
- 5. Reactor Reserve Shutdown Hours
- 6. Net Electrical Energy Gen. (MWH)
This Month 361.9 359.6 0.0 401,088.7 Yr-to-Date 1,777.9 1,775.6 0.0 2,023,046.3 Cumulative 96,981.2 94,156.5 0.0 98,081,379.0
- 1.
2.
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM
.Sa"m41iw of Oayzl Applicability:
References:
DER Prepared:
_"____5 Print El Unit 1
(ýriUnit Developmental Review El Ucensing E Engineering V
2 El Site Due Date:
//
NCTS Othdr 7-2=,
7Z-,3, 7
-11ý17' SignatureDae
/
Name Si-nature PT, G
)o.'
c A~I TechnicallSafety Reviews Technical Review El N/R Designees:
SORC:
E] N/R SRAB:
El N/R Final Review El Engineering Manager El Generation:
Dl Tech Spec 6.5.2 (CTS)
- "Verification El Other e-Meeting No.:
Meeting No.:
Operations Manager Tech Support Manager Maintenance Manager El iAttorney El Ucensing Manager Plant Manager El Other El Proofreader Disposition FSAR Change:
NCTS Commitments:
Post Correspondence El N/R E-1 N/R El N/R LDCR #
NCTS #s El Completed per NLAP-RPR-0 1 on (date)
Page 17 Di Generation El Other NIP-IRG-01 Rev 17 M,
Ile C, k 4, 1,,
I*e wc e, N z WNGW Document A114 /)--
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM NZ INN Document A/Allt0 Sowma,-X o e
0
/
I't ek ic-Applicability:
U Unit 1
References:
DER Prepared: 7"C/4/-a5 7?
"-1lo a,
Print Developmental Review
[] Ucensing EL Engineering f1 Generation
{rUnit 2 NCT Site DueDate: o'r/9
,,k1 NCTS iOthar Signature Date/
Name Signature 6Fe a t C"-'I-Li Other TechnicallSafety Reviews Technical Review. EL N/R Designees:
SORC:
EL N/R SRAB:
EL N/R Final Review Li Engineering Manager Li Generation:
Operations Manager Tech Support Manager Maintenance Manager Li OAttoney El Ucensing Manager V Plant Manager EL Other EL Proofreader Disposition FSAR Change:
NCTS Commitments:
Post Correspondence El Tech Spec 6.5.2 (CTS)
(,I Cl~cac-ri grVerification El Other Meeting No.:
Meeting No.:
mi
/le ck 4. -,,
EL N/R L-N/R El N/R LDCR #
NCTS #*s EL Completed per NLAP-RPR-01 on (date)
Page 17 NIP-IRG-01 Rev 17 Aga::
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM WKDocument: AIJ'1 /2' J-.SawnJ,ni~a of C0C i-Ai 46~
Applicability:
L Unit 1
References:
DER Prepared:
c7"-h*,'$1e /
v Ai q ti Print Developmental Review o Ucensing El Engineering N-Generation N'Unit LI El Site Due Date:
//,*
k NCTS ignathtr Dat7/
/
Signature Date/
Name Signature A
&4kCf;-1 -
El Other TechnicallSafety Reviews Technical Review: El N/R Designees:
SORC:
El NIR SRAB:
El N/R Final Review El Engineering Manager El Generation:
El Tech Spec 6.5.2 (CTS)
E'Verification El Other C(ý L4OCC.1 Meeting No.:
Meeting No.:
Operations Manager Tech Support Manager Maintenance Manager El WAttomey El Ucensing Manager Plant Manager
[] Other El Proofreader Disposition FSAR Change:
NCTS Commitments:
Post Correspondence 11 N/R El MR 11 WR LDCR #
NCTS #Vs El Completed per NLAP-RPR-01 on (date)
Page 17 e Ka~e7-7ý-4 o'l NIP-IRG-01 Rev 17 M, PC r'-i
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Rwiimpnt AIbI P2.
Applicability:
References:
DER Prepared: Them,, 5 Print Developmental Review El Licensing 13 Engineering El Unit 1 SQm,iavsI nf ed: 4 4 Ii1x,.i1 rbgce
YUnit 2
/
El Site NCTS Signature Name
/7 Due Date: '9"///S /
Other
- j',.,
Signature
&ascU-2 e-TechnicallSafety Reviews Technical Review: El N/R Designees:
SORC:
El N/R SRAB:
El N/R Final Review El Engineering Manager El Generation:
El Tech Spec 6.5.2 (CTS)
ErVerification El Other O-,
04(?hOtll Meeting No.:
Meeting No.:
Operations Manager Tech Support Manager Maintenance Manager El Attorney El Licensing Manager IN Plant Manager El Other El Proofreader Disposition FSAR Change:
NCTS Commitments:
Post Correspondence El N/R El N/R El N/R LDCR #
NCTS V
_s El Completed per NLAP-RPR-01 on (date)
Page 17 SGeneration El Other NIP-IRG-01 Rev 17 Dcmn
. /0 1-1 J
0
,0.
,d 4
4; le t-9--
Ir
" 1...
M, lleckka,+,
e/
ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM fN m D
m ent:
A
-1/
0 -2 _
yee of Applicability:
References:
DER Prepared: _7-_/1
,7_5 Print Developmental Review
[] Ucensing E-Engineering El Unit 1
[rUnit 2 El Site NCTS Signature Name 1/
Due Date: i///,
/
L.
Other
/: Z
,.5, 1
S ateau/
_Signature 1-.
G~evakd;- e.
DT.,
'qJ*
<*A,
- g S
Technical/Safety Reviews Technical Review El N/R Designees:
SORC:
El N/R SRAB:
El N/R Final Review El Engineering Manager El Generation:
El Tech Spec 6.5.2 (CTS)
I"ý pal? -10At ErVerification 11 Other
*t/6>
4 cz
Meeting No.:
Meeting No.:
Operations Manager Tech Support Manager Maintenance Manager El1Attorney Licensing Manager Plant Manager El Other El Proofreader Disposition FSAR Change:
NCTS Commitments:
Post Correspondence 1:1 N/R El N/R
[] N/R LOCR #
NCTS 9s El Completed per NLAP-RPR-01 on (date)
Page 17 IN-Generation El Other NIP-IRG-01 Rev 17 J
- vwl,,*,
Vf 1e,-tc e-
ý,rA, -Z N...,
- -\\