ML021120442

From kanterella
Jump to navigation Jump to search
Transmittal of McGuire Nuclear Station Selected Licensee Commitments Manual (Revision 21), Loep (Revision 21) & SLC 16.6.3 (Revision 17)
ML021120442
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/11/2002
From: Barron H
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021120442 (6)


Text

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW

1) 02049 NGO PRA MANAGER ECO81
2) 02188 NPA MANAGER EC05N
3) 02467 ELECT. LICENSING LIBRARY ECO50
4) 02532 MCG NRC INSP MG-ADMIN MAIL RM
5) 02546 WC LIBRARY-MG01WC
6) 03044 MCG DOC CNTRL MISC MAN MGO5DM
7) 03102 H L MASSEY OPS PROC GP MG03OT
8) 03379 D E CALDWELL MG01MM
9) 03447 HARRY J SLOAN MG01 RP
10) 03614 MCG OPS PROCEDURE GP MG010P
11) 03744 OPS TRNG MGR. MG030T
12) 03759 U S NUCLEAR REG WASH, DC
13) 04771 E E HITE EC09E
14) 04809 MCG PLANT ENG. LIBR. MG05SE
15) 05160 PTVU MG01RC DOCUMENT NO SELECTED LICENSEE COMMITMENT MANUAL LOEP SLC 16.6.3 QA COND Duke Power Company DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL (SLC)

Page 2 of 3 REV #/ DATE DISTR CODE 2

3 4

V1 PRIORITY Normal Date 6

7'

'9 II 13 I 1.) ML 1U I

L I

I I



vi vi

'92 Vb vi vi NA NA NA 021 04/08/02 021 04/08/02 017 04/08/02 MADM-03A V1 Vi vi V1 Vi vi vi I __________

I ___________

1 ___

1 ___

.1 ___

J ___

I ___

I ___

I ___

I ___

I ___

I ___

I ___

 ___

I ___

- ___

REMARKS:

PLEASE UPDATE YOUR MANUAL ACCORDINGLY H B BARRON, JR.

VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:

B C BEAVER MG01RC BCB/CMK Date:

04/11/02 Document Transmittal #:

DUK021010024 QA CONDITION D Yes U No OTHER ACKNOWLEDGEMENT REQUIRED

  • Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

Duke Power Company P.O. Box 12700 Document Management MGO1S2 Hagers Ferry Road Huntersville, N.C.

28078 Rec'd By 10 IU11AL 1

85 V1 I I 12 I13 114 V1 vi V2 VVI vi V1 56

April 8, 2001 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Affected Sections Revision 20 List of Affected Sections Revision 21 SLC 16.6.3 Revision 0 SLC 16.6.3 Revision 17 Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance 875-4180

SLC LIST OF AFFECTED SECTIONS SECTION REVISION NUMBER DATE 16.1 REVISION 0 12/14/99 16.2 REVISION 0 12/14/99 16.3 REVISION 0 12/14/99 16.4 Not Issued 16.5.1 REVISION 0 12/14/99 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 7 09/14/00 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 0 12/14/99 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 0 12/14/99 16.5.10 REVISION 0 12/14/99 16.6.1 REVISION 0 12/14/99 16.6.2 REVISION 0 12/14/99 16.6.3 REVISION 17 04/08/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 16 9/26/01 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 0 12/14/99 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 0 12/14/99 16.7.9 REVISION 0 12/14/99 16.7.10 REVISION 0 12/14/99 16.8.1 REVISION 2 4/11/00 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 2 4/11/00 16.9.1 REVISION 18 12/4/01 16.9.2 REVISION 5 5/24/00 16.9.3 REVISION 0 12/14/99 16.9.4 REVISION 1 03/02/00 16.9.5 REVISION 0 12/14/99 16.9.6 REVISION 0 12/14/99 16.9.7 REVISION 14 7/26/01 16.9.8 REVISION 0 12/14/99 16.9.9 REVISION 13 2/26/01 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 13 2/26/01 16.9.13 REVISION 13 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 4 6/20/00 16.9.16 REVISION 19 12/03/01 16.9.17 REVISION 0 12/14/99 McGuire Units 1 and 2 1

Revision 21

SLC LIST OF AFFECTED SECTIONS SECTION

[

REVISION NUMBER DATE 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 0 12/14/99 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 0 12/14/99 16.9.23 Not Issued 16.9.24 REVISION 20 1/17/02 16.10.1 REVISION 0 12/14/99 16.11.1 REVISION 9 2/1/01 16.11.2 REVISION 23 4/4/02 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 0 12/14/99 16.11.7 REVISION 12 3/14/01 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 0 12/14/99 16.11.12 REVISION 0 12/14/99 16.11.13 REVISION 0 12/14/99 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 1 4/11/00 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 0 12/14/99 16.13.2 REVISION 0 12/14/99 16.13.3 REVISION 0 12/14/99 16.14.1 REVISION 0 12/14/99 McGuire Units 1 and 2 2

Revision 21

Inlet Door Position Monitoring System 16.6.3 16.6 ENGINEERED SAFETY FEATURES 16.6.3 Inlet Door Position Monitoring System COMMITMENT APPLICABILITY The Inlet Door Position Monitoring System shall be OPERABLE.

MODES 1, 2, 3, and 4.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Inlet Door Position A.1.1 Verify the Ice Bed Immediately Monitoring System Temperature Monitoring inoperable.

System is OPERABLE.

AND A.1.2 Verify ice bed temperature Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

< 270 F.

AND A.1.3 Restore the Inlet Door 14 days Position Monitoring System to OPERABLE status.

OR A.2 Restore the Inlet Door 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Position Monitoring System to OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> McGuire Units 1 and 2 16.6.3-1 Revision 17

Inlet Door Position Monitoring System 16.6.3 TESTING REQUIREMENTS TEST FREQUENCY TR 16.6.3.1 Perform a CHANNEL CHECK.

7 days AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after receiving a door open alarm TR 16.6.3.2 Perform a TADOT.

18 months TR 16.6.3.3 Verify the Inlet Door Position Monitoring System correctly 18 months, when indicates the status of each inlet door.

each door is opened and reclosed during testing per ITS 3.6.13 BASES The OPERABILITY of the Inlet Door Position Monitoring System ensures that the capability is available for monitoring the individual inlet door position. In the event the system is inoperable, the ACTION requirements provide assurance that the ice bed heat removal capacity will be retained within the specified limits.

REFERENCES None.

McGuire Units 1 and 2 16.6.3-2 Revision 17