FINAL AS-ADMINISTERED WALKTHROUGH JPMS FOR THE DAVIS-BESSE INITIAL EXAMINATION - MARCH 2002
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.l.A Rev.
00 Page 1 of 8 TASK NO.:
010-013-04-0100 TASK DESCRIPTION:
Perform Required Operator Actions for a Leaking PORV RC2A K/A
REFERENCE:
010 A2.03 APPLICABLE METHOD OF TESTING:
Actual performance Simulator TIME FOR COMPLETION:
10 minutes APPLICABILITY:
[X]
[X]
SRO TASK STANDARDS:
Recognize PORV failed open and close RCll.
REQUIRED MATERIALS:
DB-SP-03363, Pressurizer Pilot Operated Relief Valve Cycle Test GENERAL
REFERENCES:
DB-SP-03363, Pressurizer Pilot Operated Relief Valve Cycle Test, Rev.
01, C-4 INITIAL CONDITIONS:
RCS pressure is 700 psig.
A plant shutdown for refueling is in progress.
INITIATING CUES:
You are directed to complete Section 4.2 of DB-SP-03363, Pressurizer Pilot Operated Relief Valve Cycle Test.
JPM No. B.l.A Page 2 of 8 INITIAL CONDITIONS:
RCS pressure is 700 psig.
A plant shutdown for refueling is in progress.
INITIATING CUES:
You are directed to complete Section 4.2 of DB-SP-03363, Pressurizer Pilot Operated Relief Valve Cycle Test.
JPM No.
B.1.A SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Recognize PORV failed open and close RC 11 PORV block.
INITIAL CONDITION:
RCS pressure 700 psig on PRS RC2Al ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITIONS:
MALFUNCTIONS/FAILURE TO INSERT:
Fail PORV open when PORV is opened.
ACTION/CUES:
JPM STEP NUMBER CUE CTMT Coordinator reports all personnel out of CTMT.
Page 3 of 8 1
JPM No. B.I.A PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Perform required prerequisites.
STANDARD:
Notify CTMT Coordinator.
CUE:
None.
SAT UNSAT
- 2.
PERFORMANCE STEP:
Notify QC if required.
STANDARD:
N/A CUE:
Not required.
SAT UNSAT
- 3.
PERFORMANCE STEP:
Obtain Shift Manager's permission.
STANDARD:
Request Shift Manager's permission.
CUE:
Shift Manager has given his permission.
SAT UNSAT
- 4.
PERFORMANCE STEP:
Establish communication.
STANDARD:
Determine communication is not required.
CUE:
(If asked) Section 4.1 will not be performed.
SAT UNSAT
- 5.
PERFORMANCE STEP:
Verify alternate vent path operable.
STANDARD:
Check vent path available.
CUE:
Vent path via RC 200 and 239 is available.
SAT UNSAT Page 4 of 8
JPM No.
B.I.A
- 6.
PERFORMANCE STEP:
Verify RCS pressure is between 675 and 700 psig.
STANDARD:
Verify PRS RC2A1 is between 675 and 700 psig.
CUE:
None.
SAT UNSAT
- 7.
PERFORMANCE STEP:
Verify pressurizer temperature.
STANDARD:
Verify pressurizer temperature on T776 computer point.
CUE:
None.
SAT UNSAT
- 8.
PERFORMANCE STEP:
Verify plant is in startup or shutdown phase.
STANDARD:
CUE:
(If asked) The information is in the initial condition.
SAT UNSAT
- 9.
PERFORMANCE STEP:
Verify pressurizer quench tank is in service.
STANDARD:
CUE:
Quench tank is in service.
SAT UNSAT
- 10. PERFORMANCE STEP:
Verify alternate vent path is operable prior to performing Section 4.1.
STANDARD:
CUE:
Section 4.1 is not being conducted.
SAT UNSAT
- 11. PERFORMANCE STEP:
Close PORV block valve.
STANDARD:
Depress the close button on HIS RCII.
CUE:
None.
SAT UNSAT Page 5 of 8
JPM No.
B.I.A
- 12.
PERFORMANCE STEP:
Open PORV block valve.
STANDARD:
Depress open on HIS RC11.
CUE:
IV has been completed.
SAT UNSAT
- 13.
PERFORMANCE STEP:
Record RCS pressure.
STANDARD:
Record RCS pressure from PRS RC2A1.
CUE:
None.
SAT UNSAT
- 14.
PERFORMANCE STEP:
Record PORV outlet temperature.
STANDARD:
Assign computer point T773 to point display and record.
CUE:
None.
SAT UNSAT
- 15.
PERFORMANCE STEP:
Make plant announcement.
STANDARD:
Inform plant personnel to remain outside CTMT during PORV test.
CUE:
None.
SAT UNSAT
- 16.
PERFORMANCE STEP:
Verify all personnel are evacuated from CTMT.
STANDARD:
Call CAS/SAS to verify all personnel out of CTMT.
CUE:
None.
SAT UNSAT
- 17.
PERFORMANCE STEP:
Open RC2A.
.. C.........
STANDARD:
Open RC2A using HIS RC2-6, PRZR PORV VLV, and hold until indications are verified.
CUE:
None.
SAT UNSAT Page 6 of 8
JPM No.
B.I.A
- 18.
PERFORMANCE STEP:
Verify PORV open.
STANDARD:
Verify PORV open indications ZL 4263B, ZL 4264B computer point
- Z768, increase in T773 computer point.
CUE:
None.
SAT UNSAT
- 19.
PERFORMANCE STEP:
Close RC2A.
STANDARD:
Close RC2A by releasing HIS RC2-6.
CUE:
None.
SAT UNSAT
- 20.
PERFORMANCE STEP:
Verify RC2A closes.
....C.........
STANDARD:
Check indications for RC2A being closed.
Determine it is still open.
CUE:
None.
SAT UNSAT
- 21.
PERFORMANCE STEP:
Close RCll.
.C.........
STANDARD:
Close RC11 using HIS RC11 before SFAS Lo-Lo pressure actuation.
CUE:
None.
SAT UNSAT
- 22.
PERFORMANCE STEP:
Notify the Shift Manager or Control Room SRO.
STANDARD:
Communicate the PORV failed to close. RC11 was closed.RCS pressure went below 625 psig.
CUE:
Shift Manager/Control Room SRO acknowledges.
SAT UNSAT TERMINATING CUES:
This JPM is complete.
END TIME Page 7 of 8
JPM No. B.1.A VERIFICATION OF COMPLETION Operator Evaluator SSN Date License:
[ ] RO
[ ] SRO Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained:
Yes No N/A Result:
[ ] SATISFACTORY
[ ] UNSATISFACTORY NOTE:
An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator's Signature Date Page 8 of 8
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.: B.1.B Rev. 01 Page 1 of 10 TASK NO.: 000-058-05-0100, 005-011-05-0100 TASK DESCRIPTION: Operate the Low Pressure Injection System During a LOCA K/A
REFERENCE:
t3-XXX-EAf. If 4.2M.2,....
EAR.
84.54.7 O
4 o
A449050 A,.
15
.1 APPLICABLE METHOD OF TESTING: Actual Performance Simulator TIME FOR COMPLETION: 7 minutes APPLICABILITY:
[X] RO
[X]
SRO TASK STANDARDS:
Cross-connect LPI Systems during a large break LOCA Balance LPI flow between discharge lines REOUIRED MATERIALS:
DB-OP-02000, RPS, SFAS, SFRCS Trip or SGTR GENERAL
REFERENCES:
DB-OP-02000, RPS, SFAS, SFRCS Trip or SGTR INITIAL CONDITIONS:
A large break LOCA has occurred. All systems responded properly except Low Pressure Injection Pump I has a seized shaft.
INITIATING CUES:
The Shift Manager directs you to cross-connect and balance Low Pressure Injection flow between injection lines per DB-OP-02000, Section 10, Step 10.9. You have permission to operate all locked valves.
(Hand Section 10 of DB-OP-02000 to examinee.)
JPM No.
B.1.B Page 2 of 6 INITIAL CONDITIONS:
A large break LOCA has occurred. All systems responded properly except Low Pressure Injection Pump 1 has a seized shaft.
INITIATING CUES:
The Shift Manager directs you to cross-connect and balance Low Pressure Injection flow between injection lines per DB-OP-02000, Section 10, Step 10.9. You have permission to operate all locked valves.,
JPM No.
B.I.B SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Operate the LPI System During a LOCA INITIAL CONDITION:
A large break LOCA has occurred, all systems responded properly except LPI Pump 1 has a seized shaft.
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
- 1.
Stop all RCPs
- 2.
Stop both Makeup Pumps
- 3.
Transfer Makeup Pump suctions to the BWST
- 4.
Ensure DH 63 and DH 64 are closed.
MALFUNCTIONS/FAILURE TO INSERT:
Large break LOCA - HH40/1.0 DH Pump I seized shaft-BDPII=True ACTION/CUES:
None.
Page 3 of 6
JPM No. B.I.B PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet these standards for this item constitutes failure.
critical unless denoted in the "Comments".
any one of Sequence is NOT START TIME:
- 1. PERFORMANCE STEP: Locate the correct procedure section.
Identifies Step 10.9 of DB-OP-02000,
- SFRCS, or SAT UNSAT
- 2.
PERFORMANCE STEP:
Verify DH Pump I is OFF.
STANDARD:
Verifies green light on. No amps indicated.
CUE:
None.
SAT UNSAT
- 3. PERFORMANCE STEP: Close DH 2733, DH Pump I LPI SUCT.
C o.....
STANDARD: Depresses BLOCK, then CLOSE pushbutton for DH 2733.
CUE: If asked, SM grants permission to BLOCK DH1B.
SAT UNSAT
- 4. PERFORMANCE STEP: Close DH IB, DH Pump 1 discharge.
C.......
STANDARD:
Puts control power on, then depresses and holds CLOSE pushbutton for DH lB.
COMMENT: Throttle valve.
CUE: None.
SAT UNSAT STANDARD:
CUE: None.
Page 4 of 6
JPM No. B.l.B
- 5. PERFORMANCE STEP: Open DH 830, DH COOLER DISCH X-OVER 2 TO 1.
C.......
STANDARD: Depresses OPEN pushbutton for DH 830.
COMMENT:
DH 2733 must be closed first to prevent lifting relief on CTMT sump suction line.
CUE: None.
SAT UNSAT
- 6. PERFORMANCE STEP: Balance LPI flows.
......,C,.....
STANDARD:
Put control power on DH 1A, then throttle open DH 1B, throttle closed DH 1A. Total flow remains less than 4000 gpm.
COMMENT:
Upon completion, student may elect to remove control power again from DH 1A and DH lB.
CUE: If asked, SM grants permission to BLOCK DHiA.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME Page 5 of 6
JPM No.
B.1.B VERIFICATION OF COMPLETION Operator Evaluator Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained Yes No _
N/A Result: [] SATISFACTORY
[ ] UNSATISFACTORY NOTE: An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator's Signature
/ Date Page 6 of 6
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.I.C Rev.
00 Page 1 of 1 TASK NO.:000-046-05-0100 TASK DESCRIPTION:Re-energize D2 Bus from C1 and start the MDFP K/A
REFERENCE:
062A2.11 (0*7i4'I)
APPLICABLE METHOD OF TESTING:
Simulate performance Control Room X Simulator alternate path TIME FOR COMPLETION:
20 minutes APPLICABILITY:
[X]
[XI SRO TASK STANDARDS:Recognize Station Blackout DG will not start,D2 re-energized from C1 bus.DGl running within rated limits, MDFP on D2 REQUIRED MATERIALS:
DB-OP-02000.06, ATTACHMENTS 1, AND 2 GENERAL
REFERENCES:
INITIAL CONDITIONS:The reactor tripped from 100%,
a loss of offsite power occurred.
DGl is supplying C1 bus, EDG 2 has failed to start and efforts to start it have failed. AFPT has tripped and efforts to start it have failed.
INITIATING CUES:You are dirrected to re-energize D2 bus from the SBODG and start the MDFP, using attachment 1 of DB-OP-02000
Page 1 of 8 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Recognize Station Blackout DG will not Start Re-energize D2 Bus from C1 bus and Start MDFP INITIAL CONDITION:
Any at-power I.C.
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
- 1. Loss of OFF-SITE power -
IMF P8RFC.
- 2.
Trip EDG 2 and lockout (differential or overspeed),
using IMF G528B.
- 3.
Trip AFPT 2 using -
IRF SFEQA Trip.
MALFUNCTIONS/FAILURE TO INSERT:
Fail SBODG to START use of AIR START RELAY -
IMF GB07A.
ACTION/CUES:
- 2.
Cue:
(Desired breaker) is open.
JPM B.1. C
JPM B.l.C Page 2 of 8 INITIAL CONDITIONS:
The reactor has tripped from 100% power.
A loss of offsite power has occurred.
DGI is supplying CI Bus.
EDG 2 has failed to start and efforts to start it have failed.
AFPT 2 has tripped and efforts to reset it have failed.
INITIATING CUES:
You are directed to re-energize D2 from SBODG and start the MDFP, using of DB-OP-02000.
Page 3 of 8 PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT required unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Locate the correct procedure.
STANDARD:
Identifies DB-OP-02000,
COMMENTS:
Hand copy of DB-OP-02000, Attachments 1 and 2, to the examinee.
CUE:
None.
SAT UNSAT
- 2.
PERFORMANCE STEP:
Routes to the correct attachment.
STANDARD:
Routes to DB-OP-02000,
CUE:
(If asked) The Shift Manager directs you to uses the SBODG to re-energize D2.
SAT UNSAT
- 3.
PERFORMANCE STEP:
Verify OPEN the breakers on D2 bus.
STANDARD:
Verify the following breakers are open:
- AD301, ABDD2,
- AD205, AD206,
- AD201, AD202,
- AD204, AD207 and AD210.
May elect to have EO locally check breakers, some or all.
CUE:
None.
SAT UNSAT
- 4.
PERFORMANCE STEP:
Verify open ADII0.
STANDARD:
Verify ADl10 is OPEN.
CUE:
None.
Page 4 of 8
- 5.
PERFORMANCE STEP:
Start SBODG.
STANDARD:
Press START on SBODG Control Panel.
COMMENT:
SBODG will not start.
CUE:
(If asked) Shift Manager directs the operator to re-energize D2 Bus from C1 Bus and start MDFP.
SAT UNSAT
- 6.
PERFORMANCE STEP:
Routes to the correct attachment.
STANDARD:
Routes to DB-OP-02000,
CUE:
None.
SAT UNSAT
- 7.
PERFORMANCE STEP:
Verify OPEN the breakers on D2 bus.
STANDARD:
Verify the following breakers are open:
- AD301, ABDD2,
- AD205, AD206,
- AD201, AD202,
- AD204, AD207 and AD210.
May elect to have EO locally check breakers, some or all.
COMMENT:
Examinee may not repeat this step, verified previously.
CUE:
None.
SAT UNSAT
- 8.
PERFORMANCE STEP:
Verify open ADII0.
STANDARD:
Verify AD110 is OPEN.
COMMENT:
Examinee may not repeat this step, verified previously.
CUE:
None.
Page 5 of 8
- 9.
PERFORMANCE STEP:
Verify open HBBD.
.C.........
STANDARD:
OPEN breaker HBBD using HIS 6214.
COMMENT:
This step must be performed prior to steps 7 and 8.
CUE:
None.
SAT UNSAT
- 10. PERFORMANCE STEP:
Verify open AC1O0.
STANDARD:
Verify ACIl0 is OPEN.
CUE:
None.
SAT UNSAT
- 11. PERFORMANCE STEP:
Place C1 Sync Select switch in the Bkr to XBD C........
position.
STANDARD:
Rotate the C1 Sync Select switch, HS 6221, to the Bkr to XBD position.
COMMENT:
This steps 11, 12 and 13 must be performed in sequence.
CUE:
None.
SAT UNSAT
- 12.
PERFORMANCE STEP:
Close ABDC1.
...oCo........
STANDARD: HIS 6220 (ABDCl) rotated to CLOSE.
CUE:
None.
SAT UNSAT
- 13.
PERFORMANCE STEP:
Place C1 Sync Select switch in OFF.
STANDARD:
Rotate the C1 Sync Select switch, HS 6221, to OFF position.
CUE:
None.
Page 6 of 8
- 14.
PERFORMANCE STEP:
Close ABDD2.
.C.........
STANDARD:
ABDD2 (HIS 6228) rotated to CLOSE.
COMMENT:
This step must be performed prior to the rest of the steps.
CUE:
None.
SAT UNSAT
- 15.
PERFORMANCE STEP:
Verify D2 is energized.
STANDARD:
Approximately 4160 V is indicated on D2.
CUE:
None.
SAT UNSAT
- 16.
PERFORMANCE STEP:
Energize F7.
..C.........
STANDARD:
HIS 6463 (AD2DF7) and HIS 6464 (BDF7) rotated to CLOSE.
COMMENT:
Only critical if previously opened.
CUE:
None.
SAT UNSAT
- 17.
PERFORMANCE STEP:
Verify EDG 1 is loaded to less than 2250 KW and locate the correct procedure.
STANDARD:
Determine EDG 1 loading is less than 2250 KW.
Identify DB-OP-02000,
CUE:
None.
SAT UNSAT
- 18.
PERFORMANCE STEP:
Ensure the MDFP is aligned to the AFW System.
STANDARD:
Visual check of manual valve position indicating lights.
CUE:
None.
Page 7 of 8
- 19.
PERFORMANCE STEP:
Enable and close both MDFP discharge valves.
.C.........
STANDARD:
Control power "ON" switches for HIS 6459 and HIS 6460 pushed.
Reduce the demand on LIC 6459 and LIC 6460 to zero.
CUE:
None.
SAT UNSAT
- 20.
PERFORMANCE STEP:
Start the MDFP.
.C.......
STANDARD:
Rotate handswitch HIS 579 to START.
COMMENT:
There is a short time delay before the pump starts.
After switch HIS 579 is rotated to START, wait 10-15 seconds before providing MDFP status CUES to the trainee.
CUE:
None.
SAT UNSAT
- 21.
PERFORMANCE STEP:
Establish feedwater flow to the Steam Generators at C............
less than 1000 gpm total flow.
STANDARD:
Total feedwater flow to both S/Gs < 1000 gpm.
CUE:
None.
SAT UNSAT
- 22.
PERFORMANCE STEP: Verify proper SG levels per Specific Rule 4.
STANDARD:
Maintain maximum flow.
CUE:
Another RO will maintain SG levels.
SAT UNSAT
- 23.
PERFORMANCE STEP:
Contact an EO to realign AFW minimum recirc back to the CST.
STANDARD:
Contact an EO.
CUE:
None.
SAT UNSAT END TIME TERMINATING CUES: Trainee should report the task is complete.
JPM B.1. C
Page 8 of 8 VERIFICATION OF COMPLETION Operator Evaluator Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained Yes Result:
No N/A
[ I SATISFACTORY
[ I UNSATISFACTORY NOTE: An " Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
/
Evaluator's Signature JPM B.1. C Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.I.D Rev.
00 Page 1 of 6 TASK NO.:
000-045-05-0100 TASK DESCRIPTION:
Borate the Makeup Tank per Attachment 13 of DB-OP-02000 K/A
REFERENCE:
OcL A4.or (*. *'I APPLICABLE METHOD OF TESTING:
Actual performance Simulator TIME FOR COMPLETION:
10 minutes APPLICABILITY:
[X] RO
[XI SRO TASK STANDARDS:
REQUIRED MATERIALS:
DB-OP-02000,
REFERENCES:
DB-OP-02000,
Reactor trip in Mode 3.
INITIATING CUES:
A reactor trip occurred 30 minutes ago.
The makeup pump suctions have been transferred back to the makeup tank.
You have been directed to add 50 gallons of acid to the makeup tank using BA Pump 1, per Attachment 13 of DB-OP-02000.
JPM No.
B.1.D Page 2 of 6 INITIAL CONDITIONS:
Reactor trip in Mode 3.
INITIATING CUES:
A reactor trip occurred 30 minutes ago.
The makeup pump suctions have been transferred back to the makeup tank.
You have been directed to add 50 gallons of acid to the makeup tank using BA Pump 1, per Attachment 13 of DB-OP-02000.
JPM No. B.I.D PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Verify MU 39, Batch Flow Control Valve, is closed.
STANDARD:
On the batch controller, press VALVE SET, then ACK (" 0"
),
then ENTER.
CUE:
None.
SAT UNSAT
- 2.
PERFORMANCE STEP:
Verify MU 23, Flow Control, is closed.
STANDARD:
Verify MU 23, Flow Control, is closed.
CUE:
None.
SAT UNSAT
- 3.
PERFORMANCE STEP:
Verify WC 3526, Booster System Bypass, is closed using HIS 3526.
STANDARD:
Verify WC 3526, Booster System Bypass, is closed using HIS 3526.
CUE:
None.
SAT UNSAT
- 4.
PERFORMANCE STEP:
Set batch controller to desired batch size.
.C.........
STANDARD:
On the batch controller, press BATCH SET, then press number keys equating to desired batch size in gallons, then press ENTER.
Exit BATCH SET mode by pressing DISPLAY
(" Lower" ).
Display batch size in lower display by pressing BATCH (" 4" ).
COMMENT:
Candidate may set batch size for 75 gallons to " chase" the boric acid with 25 gallons of water CUE:
None.
SAT UNSAT Page 3 of 6
JPM No. B.1.D
- 5.
PERFORMANCE STEP:
Reset the indicated total on the batch controller.
.C.........
STANDARD:
On the batch controller, press DISPLAY (" Lower" ),
then press TOTAL
("
7"
),
then press TOTAL RESET
(" 6")
CUE:
None.
SAT UNSAT
- 6.
PERFORMANCE STEP:
Display flow rate in the upper display.
.C..
..Co.........
STANDARD:
On the batch controller, press DISPLAY (" upper" ),
then press RATE (" 8".
CUE:
None.
SAT UNSAT
- 7.
PERFORMANCE STEP:
Notify the Control Room SRO that the batch controller is aligned for boric acid addition.
STANDARD:
Control Room SRO notified.
CUE:
None.
SAT UNSAT
- 8.
PERFORMANCE STEP:
Enable the batch controller.
.oC........
STANDARD:
Enable batch controller by pressing RUN.
CUE:
None.
SAT UNSAT
- 9.
PERFORMANCE STEP:
Open MU 40, BATCH ISO, using HIS MU 40.
.C....
C STANDARD:
Open MU 40, BATCH ISO, using HIS MU 40.
CUE:
None.
SAT UNSAT
- 10. PERFORMANCE STEP:
Start the desired boric acid pump.
.. C........
STANDARD:
Start Boric Acid Pump 1 using HIS MU50A.
CUE:
None.
SAT UNSAT Page 4 of 6
JPM No.
B.I.D
- 11. PERFORMANCE STEP:
Throttle boric acid flow.
..C.........
STANDARD:
COMMENT:
CUE:
Throttle boric acid flow with MU 23, FLOW CONTROL, HC MU23, while observing flow indication on the upper display of the batch controller.
Boric Acid Pump maximum flow is 40 gpm.
None.
SAT UNSAT
- 12.
PERFORMANCE STEP:
Stop the running boric acid pump.
STANDARD:
Stop Boric Acid Pump 1 using HIS MU50A, after desired batch has been added.
CUE:
None.
SAT UNSAT
- 13.
PERFORMANCE STEP:
Close MU 23, FLOW CONTROL, using HC MU 23.
STANDARD:
Close MU 23, FLOW CONTROL, using HC MU 23.
CUE:
None.
SAT UNSAT
- 14.
PERFORMANCE STEP:
Verify MU 40, BATCH ISO, is closed using HIS MU 40.
STANDARD:
Verify MU 40, BATCH ISO, is closed using HIS MU 40.
CUE:
None.
SAT UNSAT TERMINATING CUES:
This JPM is complete.
END TIME Page 5 of 6
JPM No.
B.I.D VERIFICATION OF COMPLETION Operator Evaluator SSN Date License:
[ ] RO
[ ] SRO Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained:
Yes No N/A Result:
[ I SATISFACTORY
[ I UNSATISFACTORY NOTE:
An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator's Signature Date Page 6 of G
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.l.E Rev.
00 Page 1 of 5 TASK NO.:
012-003-01-0100 TASK DESCRIPTION:
Manually Trip an RPS Channel K/A
REFERENCE:
012 1X 7\\
", 012-XXX-A4.04 APPLICABLE METHOD OF TESTING:
Actual Performance Simulator TIME FOR COMPLETION:
8 minutes APPLICABILITY:
[X]
[X]
[ )
NLO TASK STANDARDS:
Identify CTMT high pressure module will not trip, trip RPS Channel 2 by using the RCS Flow Test Module.
REQUIRED MATERIALS:
DB-OP-06403, RPS and NI Operating Procedure GENERAL
REFERENCES:
DB-OP-06403, RPS and NI Operating Procedure INITIAL CONDITIONS:
The Plant is in Mode 1.
INITIATING CUES:
Channel 2 of the RPS is inoperable due to an out-of-specification power-to-pumps B/S setting.
The Shift Manager directs you to trip Channel 2 of the RPS on CTMT pressure per DB-OP-06403, RPS and NI Operating Procedure.
(Hand examinee a copy of DB-OP-06403)
JPM No. B.I.E Page 2 of 6 INITIAL CONDITIONS:
The plant is in Mode 1.
INITIATING CUES:
Channel 2 of the RPS is inoperable due to an out-of-specification power-to-pumps B/S setting.
The Shift Manager directs you to trip Channel 2 of the RPS on CTMT pressure per DB-OP-06403, RPS and NI Operating Procedure.
JPM No. B.1.E SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Manually trip an RPS channel INITIAL CONDITION:
Mode 1, 2 or 3 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITIONS:
None MALFUNCTIONS/FAILURE TO INSERT:
On page 954, fail RPS Channel. 2 High Building Pressure Contact Buffer Module Test toggle switch to FALSE ACTION/CUES:
None Page 3 of 6
JPM No. B.I.E PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT required unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Locate the correct procedure section.
STANDARD:
Identifies Section 4.1, as correct procedure section.
COMMENT:
Hand procedure to examinee.
When correct procedure section has been located, provide CUE to trainee.
CUE:
All prerequisites are complete.
SAT UNSAT 2
PERFORMANCE STEP:
Obtain the door key to RPS Channel 2.
....... C.........
STANDARD:
Obtain key 33 from Control Room Simulator key cabinet.
CUE:
None.
SAT UNSAT
- 3.
PERFORMANCE STEP:
Depress the TEST toggle switch for HIGH BUILDING PRESS C.........
CONTACT BUFFER module and determine that RPS Channel 2 did NOT trip.
STANDARD:
Depress and hold the TEST toggle switch for the HIGH BUILDING PRESS CONTACT BUFFER module.
Individual recognizes that TEST switch did NOT trip channel.
CUE:
None.
NOTE:
If failure is NOT detected, channel will not be tripped and individual will continue with HIGH BUILDING PRESS CONTACT BUFFER module section.
SAT UNSAT
- 4.
PERFORMANCE STEP:
Informs Shift Manager (SM).
STANDARD:
Informs SM that RPS Channel 2 High Building Pressure will not trip.
CUE:
If asked, Shift Manager directs you to "TRIP" RPS Channel 2 using RCS FLOW Test Module.
SAT UNSAT Page 4 of 6
- 5.
PERFORMANCE STEP:
Place the RPS Flow module TEST Selector Switch (TSS)
C.........
in TEST OPERATE.
STANDARD:
Rotate TSS for RCS Flow test module to TEST OPERATE.
CUE:
None.
SAT UNSAT
- 6.
PERFORMANCE STEP:
Verify RPS channel tripped.
STANDARD:
Verify the ON TEST light is BRIGHT and the PROTECTIVE SUB-SYSTEM light is BRIGHT.
CUE:
None.
SAT UNSAT
- 7.
PERFORMANCE STEP:
Lock the doors and return key.
STANDARD:
Doors locked and key returned.
CUE:
None.
SAT UNSAT TERMINATING CUES:
This JPM is complete.
(Terminated by the trainee).
END TIME Page 5 of 6 JPM No. B.I.E
JPM No.
B.I.E VERIFICATION OF COMPLETION Operator Evaluator Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained Yes No N/A Result:
[ I SATISFACTORY
[ ]
UNSATISFACTORY NOTE: An " Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator's Signature Page 5 of 5 Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.1.F Rev.
00 Page TASK NO.:
029-007-01-0100 TASK DESCRIPTION:
Purge the Penetration Rooms K/A
REFERENCE:
o2-42.Co (71,/)
APPLICABLE METHOD OF TESTING:
Actual performance Simulator TIME FOR COMPLETION:
10 minutes APPLICABILITY:
[X) RO
[XI SRO TASK STANDARDS:
Start CTMT purge on the penetration rooms REQUIRED MATERIALS:
DB-OP-06503, CTMT Purge System Procedure GENERAL
REFERENCES:
DB-OP-06503, CTMT Purge System Procedure INITIAL CONDITIONS:
The plant is at 100% power.
Maintenance on CTMT purge has just been completed.
INITIATING CUES:
You have been directed to start CTMT purge on the penetration rooms.
I of 6
JPM No.
B.1.F Page 2 of 6 INITIAL CONDITIONS:
The plant is at 100% power.
Maintenance on CTMT purge has just been completed.
INITIATING CUES:
You have been directed to start CTMT purge on the penetration rooms.
JPM No.
B.1.F SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Start CTMT purge on penetration rooms.
INITIAL CONDITION:
100%- power ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITIONS:
CTMT purge off all supply and exhaust valves closed.
Sign off prerequisites in the procedure MALFUNCTIONS/FAILURE TO INSERT:
None ACTION/CUES:
None JPM STEP NUMBER Page 3 of 6 CUE
JPM No. B.l.F PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Identifies correct proceudre and section.
STANDARD:
Identifies DB-OP-06503, Section 3.3 as the correct procedure and section.
CUE:
None.
SAT UNSAT
- 2.
PERFORMANCE STEP:
Complete prerequisites.
STANDARD:
Verify Steps 3.3.1 to 3.3.3 are complete.
CUE:
Prerequisites are complete.
SAT UNSAT
- 3.
PERFORMANCE STEP:
Make plant announcement.
STANDARD:
Announce over Gai-Tronics starting Mechanical Penetration Room Purge System.
CUE:
None.
SAT UNSAT
- 4.
PERFORMANCE STEP:
Verify proper valve alignment.
C........
STANDARD:
Verify open CV 5009,
- 5016, 5004, and 5021.
CUE:
None.
SAT UNSAT
- 5.
PERFORMANCE STEP:
Determine if roll media filter is required.
STANDARD:
Refer to Limit and Precaution 2.2.4 to determine if roll media filter is required.
CUE:
Roll media filter is NOT required.
SAT UNSAT Page 4 of 6
JPM No. B.I.F
- 6.
PERFORMANCE STEP:
Start CTMT purge exhaust fan.
C.........
STANDARD:
Place HIS 5013 CTMT Purge Exhaust System to START.
CUE:
None.
SAT UNSAT
- 7.
PERFORMANCE STEP:
Start CTMT purge supply fan.
.C.........
STANDARD:
Place HIS 5003 CTMT Purge Supply System to START after CTMT purge exhaust fan starts.
CUE:
SAT UNSAT
- 8.
PERFORMANCE STEP:
Verify system starts.
STANDARD:
Check that both the supply and exhaust fans have started.
CUE:
None.
SAT UNSAT
- 9.
PERFORMANCE STEP:
Verify RE 5052 is in service.
STANDARD:
Verify RE 5052 is in service.
CUE:
RE 5052 is in service.
SAT UNSAT TERMINATING CUES:
This JPM is complete.
END TIME Page 5 of 6
JPM No.
B.I.F VERIFICATION OF COMPLETION Operator Evaluator SSN Date License:
[ ] RO
[ ] SRO Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained:
Yes No N/A Result:
[ I SATISFACTORY
[ I UNSATISFACTORY NOTE:
An "Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:
Evaluator' s Signature Page 6 of 6 Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.1.G Rev.
05 Page 1 of 6 TASK NO.:
013-005-05-0100 TASK DESCRIPTION:
Manually Initiate SFAS K/A
REFERENCE:
013-XXX-A4.02 4.3/4.4, 013-XXX-A4.03 4.5/4.7 APPLICABLE METHOD OF TESTING:
Actual Performance Simulator TIME FOR COMPLETION:
7 minutes APPLICABILITY:
[X]
[X]
Actuation of SA Levels 1-4 components for both channels.
Reclose the following valves:
- 1. Post accident sampling valves
- 2.
Pressurizer and Quench Tank sample valves
- 3.
Letdown isolation CTMT spray manually actuated.
REQUIRED MATERIALS:
DB-OP-06405, Safety Features Actuation System Procedure, Revision 02, C-9 DB-OP-02000,
REFERENCES:
DB-OP-06405, Safety Features Actuation System Procedure, Revision 02, C-9 INITIAL CONDITIONS:
A loss of coolant accident has occurred.
CTMT sample valves CV 5010A through E and CV 5011A through E have been blocked and reopened.
PZR and quench tank sample valves, RC 240A, RC 240B, RC 232 have been blocked and reopened.
MU2A and MU3 have been blocked and reopened.
INITIATING CUES:
Due to a change in leak size, RCS pressure is dropping rapidly and CTMT pressure is increasing rapidly.
The Shift Manager directs you to manually actuate all SFAS components including CTMT spray. (SFAS Levels 1-4 including Containment spray).
JPM NO.:
B.I.G INITIAL CONDITIONS:
A loss of coolant accident has occurred.
CTMT sample valves CV 5010A through E and CV 5011A through E have been blocked and reopened.
PZR and quench tank sample valves, RC 240A, RC 240B, RC 232 have been blocked and reopened.
MU2A and MU3 have been blocked and reopened.
INITIATING CUES:
Due to a change in leak size, RCS pressure is dropping rapidly and CTMT pressure is increasing rapidly.
The Shift Manager directs you to manually actuate all SFAS components including CTMT spray. (SFAS Levels 1-4 including Containment spray).
Page 2 of 6
JPM NO.:
B.I.G PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Locate the correct procedure section.
STANDARD:
Identifies DB-OP-06405, SFAS System Procedure, Section 5.2, or DB-OP-02000, Attachment 9, as the correct procedure section.
COMMENT:
Operator may elect to perform from memory or from CTRM operator aid. If DB-OP-06405 is used then hand trainee a copy of the procedure.
CUE:
None.
SAT UNSAT
- 2.
PERFORMANCE STEP:
Depress the SFAS reset pushbuttons.
STANDARD:
Push RESET on HIS 2022B and HIS 2023B.
COMMENT:
SFAS Channel 2 will NOT reset, and is NOT critical.
Channel 1 NOT critical if examinee actuates at the component level for Channel 1. Step 5 would become critical with standard to push CLOSE on the listed switches.
CUE:
None.
SAT UNSAT
- 3.
PERFORMANCE STEP:
Determine SFAS Actuation Channel 2 did not reset.
STANDARD:
Visual observation that SFAS Actuation Channel 2 equipment did not reposition.
CUE:
If asked, Shift Manager directs the operator to manually place all SFAS components in their SFAS position.
SAT UNSAT Page 3 of 6
JPM NO.:
B.l.G
- 4.
PERFORMANCE STEP:
Trip SFAS Actuation Channel 1 and 2 for all components except CTMT spray.
C........
STANDARD:
Push TRIP on HIS 2022A and HIS 2023A.
COMMENT:
Operator may not perform all of this step since RESET was unsuccessful for Channel 2.
CUE:
None.
SAT UNSAT
- 5.
PERFORMANCE STEP:
CLOSE CV 5011A through E, RC 240A, and MU 2A.
STANDARD:
Visually verify CLOSED HIS 5011A, HIS 5011B, HIS 5011C, HIS 5011D, HIS 5011E, HIS 240A, and HIS MU2A.
CUE:
None.
SAT UNSAT
- 6.
PERFORMANCE STEP:
CLOSE CV 5010A through E.
. C.........
STANDARD:
Push CLOSE on HIS 5010A, HIS 5010B, HIS 5010C, HIS 5010D, HIS 5010E.
COMMENT:
Also acceptable is to RESET SFAS Output Modules L122 and L124.
CUE:
None.
SAT UNSAT
- 7.
PERFORMANCE STEP:
CLOSE RC 240B, RC 232 and MU 3.
......o C.........
STANDARD:
Push CLOSE on HIS 240B, HIS 232 and HIS MU3.
COMMENT:
Also acceptable to RESET SFAS Output Modules L272 and L274 for RC 240B, L282 and L284 for RC 232, and L272 and L274 for MU3.
CUE:
None.
SAT UNSAT Page 4 of 6
JPM NO.:
B.1.G
- 8.
PERFORMANCE STEP:
Manually actuate CTMT spray.
.C.........
STANDARD:
Push TRIP on HIS 2020A and HIS 2021A.
COMMENT:
Also acceptable to manually start spray pumps and verify open discharge valves.
CUE:
None.
SAT UNSAT TERMINATING CUES: Another operator will verify proper SFAS actuation. This JPM is complete.
(Terminated by the evaluator).
END TIME Page 5 of 6
JPM No. B.I.G VERIFICATION OF COMPLETION Operator Evaluator Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained Yes Result:
No N/A
[ I SATISFACTORY
[ I UNSATISFACTORY NOTE: An " Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:_____________________
Dat Evaluator' s Signature Page 6 of 6 Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.2.A Rev.
00 Page 1 of 1 TASK NO. :000-078-05-0100 TASK DESCRIPTION:Serious Control Room fire, Primary side Reactor Operator actions inside the RRA.
K/A
REFERENCE:
068AAI.06 APPLICABLE METHOD OF TESTING:
Simulate performance Control Room Simulator x In plant TIME FOR COMPLETION:
30 minutes APPLICABILITY:
[XI RO
[X]
SRO TASK STANDARDS:Perform required operator actions outside the control room for a serious control room fire REQUIRED MATERIALS:
DB-OP-02519.04 GENERAL
REFERENCES:
INITIAL CONDITIONS:The control room has been evacuated due to a serious control room fire.
INITIATING CUES:You are directed to perform the actions outside the control room of the primary side reactor operator for a serious sontrol room fire.
steps l.a through l.c of attachment 3 have been completed. You have a latern, a radio, and fresh battery, and an emergency key ring.
B. 2.A Page 1 of 7 DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET INITIAL CONDITIONS:
The Control Room has been evacuated due to a serious Control Room fire.
INITIATING CUES:
You are directed to perform the actions outside the Control Room of the Primary Side Reactor Operator for a serious Control Room fire.
Steps l.a.
through 1 c.
of Attachment 3 have been completed.
You have a Captain's lantern, a radio and fresh battery and an emergency key ring.
Page 2 of 7 PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT required unless otherwise specified.
START TIME:
NOTE:
This JPM should be initiated from the Control Room. Entry to the RRA via the emergency entrance is NOT required.
- 1.
PERFORMANCE STEP:
Locate the correct procedure attachment.
STANDARD:
Identifies as correct attachment.
CUE:
None.
SAT UNSAT
- 2.
PERFORMANCE STEP:
Close AF 599, Steam GEN 2 Aux Feedwater Line Stop C........
Valve.
STANDARD:
CLOSE AF 599 using handwheel.
CUE:
AF 599 handwheel has been rotated clockwise.
Position indicates closed.
SAT UNSAT
- 3.
PERFORMANCE STEP:
Place disconnect switches to LOCAL on CDYE2.
C........
STANDARD:
Place all CDYE2 disconnect switches in the LOCAL position.
NOTE:
Trainee should verbalize each disconnect switch that is being repositioned.
CUE:
Disconnect switch has been placed in the LOCAL position on CDYE2.
SAT UNSAT
- 4.
PERFORMANCE STEP:
Place disconnect switches to LOCAL on CDEllA.
.. C.........
STANDARD:
Place all CDE11A disconnect switches in LOCAL position.
NOTE:
Trainee should verbalize each disconnect switch that is being repositioned.
CUE:
Disconnect switch has been placed in the LOCAL position on CDE1lA.
SAT UNSAT B.2.A
Page 3 of 7
- 5.
PERFORMANCE STEP:
Place disconnect switches to LOCAL on CDEllC.
C o........
STANDARD:
Place all CDEllC disconnect switches in LOCAL position.
NOTE:
CUE:
Trainee should verbalize each disconnect switch that is being repositioned.
Disconnect switch on CDEIIC.
has been placed in the LOCAL position SAT UNSAT
- 6.
PERFORMANCE STEP:
Place disconnect switches to LOCAL on CDEllB-l.
.eCe........
STANDARD:
Place all CDEllB-l disconnect switches in LOCAL position.
NOTE:
CUE:
Trainee should verbalize each disconnect switch that is being repositioned.
Disconnect switch on CDEIIB-I.
has been placed in the LOCAL position SAT UNSAT
- 7.
PERFORMANCE STEP:
Place disconnect switches to LOCAL on CDEllB-2.
.oC.........
STANDARD:
CUE:
Place the following disconnect switches in LOCAL at CDEllB-2, MU 59C, MU 59D, RC 240A, CC1407A, and DH 12.
MU MU RC CC DH 59C disconnect switch is placed in LOCAL.
59D disconnect switch is placed in LOCAL.
240A disconnect switch is placed in LOCAL.
1407A disconnect switch is placed in LOCAL.
12 disconnect switch is placed in LOCAL.
SAT UNSAT
- 8.
PERFORMANCE STEP:
Open BE 1180 on EIIB.
.Ce.C........
STANDARD:
OPEN breaker BE 1180 for YE2 240 VAC MCC on EllB.
CUE:
BE 1180 breaker handle is placed in OFF (OPEN).
SAT UNSAT B.2. A
Page 4 of 7
- 9.
PERFORMANCE STEP:
Proceed to the Makeup Pump Room and establish communications with the Unit Supervisor.
STANDARD:
Communications established with the Unit Supervisor from the Makeup Pump Room.
CUE:
Communications have been established.
The Unit Supervisor reports Makeup Pump 1 is ready for operation.
SAT UNSAT
- 10. PERFORMANCE STEP:
Start Makeup Pump (MU Pump 1).
C........
STANDARD:
Press local START Button on NP0371B for MU Pump 1 main oil pump (AC).
CUE:
Local START button (on NPO371B) for MU Pump 1 main oil pump has been pressed.
Green light goes OFF; Red light LIGHTS.
SAT UNSAT
- 11. PERFORMANCE STEP:
Start the Makeup Pump (cont.).
STANDARD:
Check MU Pump 1 aux. gear LO pump started at NPO371D.
CUE:
Red light is LIT (on NPO371D).
SAT UNSAT
- 12.
PERFORMANCE STEP:
Start the Makeup Pump (cont.).
STANDARD:
Check 12 gpm CCW flow to MU Pump 1 Oil Cooler at FI 2190.
CUE:
F1 2190 reads 14 gpm.
SAT UNSAT
- 13.
PERFORMANCE STEP:
Start the Makeup Pump (Cont.).
STANDARD:
Check Main Oil Pump discharge pressure >15 psig on PI MUl06B.
CUE:
PI MU106B reads 23 psig.
(Communications have been established with the Shift Manager.)
SAT UNSAT B.2.A
Page 5 of 7
- 14.
PERFORMANCE STEP:
Verify Makeup System is lined up and establish communications with the Shift Manager.
STANDARD:
Wait to be contacted or contact the Safety EO.
Contact the Shift Manager.
CUE:
Safety EO reports the Makeup system is lined up.
Communications have been established with the Shift Manager.
SAT UNSAT
- 15.
PERFORMANCE STEP:
Start the Makeup Pump (cont.).
C.........
STANDARD:
CLOSE/START has been pressed on NPO371A to START Makeup Pump 1. Makeup Pump 1 is visually inspected during operation (not critical).
CUE:
CLOSE/START has been pressed (on NPO371A).
Green light goes OFF; Red light LIGHTS.
MU Pump 1 is operating normally.
All parameters are acceptable.
Shift Manager directs you to open MU 6420 two turns.
SAT UNSAT
- 16.
PERFORMANCE STEP:
Throttle MU 6420, NORMAL MAKEUP Flow Controller.
.C...
STANDARD:
MU 6420 is throttled to the desired position.
CUE:
MU 6420 clutch has been engaged. Handwheel has been rotated two turns in the counter clockwise direction.
The Equipment Operator notifies you to shift MU Pump recirc to the BWST.
SAT UNSAT
- 17.
PERFORMANCE STEP:
Open MU 208, High Pressure Line Flow Test Isolation.
.C.........
STANDARD:
MU 208 is open.
CUE:
MU 208 valve handwheel rotated counterclockwise to OPEN, valve stem is UP.
SAT UNSAT B.2.A
Page 6 of 7
- 18.
PERFORMANCE STEP:
Close MU 206, MU Pump 1 Recirc Stop to Seal Return.
..C.........
STANDARD: Unlocked and closed MU 206.
CUE:
MU 206 is unlocked, valve handwheel is rotated clock wise, valve stem is DOWN.
SAT UNSAT
- 19.
PERFORMANCE STEP:
Notify Equipment Operator to setup MU Pump recir.
flow.
STANDARD:
Equipment Operator notified to setup MU Pump recirc flow.
CUE:
Equipment Operator acknowledges to setup MU Pump recirc flow.
SAT UNSAT
- 20.
PERFORMANCE STEP:
Notify RP Supervisor posted radiological boundaries have been violated.
STANDARD:
RP Supervisor notified that posted radiological boundaries have been violated.
CUE:
RP Supervisor acknowledges that posted radiological boundaries have been violated.
SAT UNSAT TERMINATING CUES:
This JPM is complete.
(Terminated by the trainee.)
END TIME B.2.A
Page 7 of 7 VERIFICATION OF COMPLETION Operator Evaluator Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained Yes Result:
No N/A
[ I SATISFACTORY
[ I UNSATISFACTORY NOTE: An " Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:_____________________
/
Evaluator's Signature B.2.A Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.2.B Rev.
00 Page 1 of 7 TASK NO.:
076-004-04-0100 TASK DESCRIPTION:
Lineup and Start the Backup Service Water Pump During a Loss of all Service Water K/A
REFERENCE:
076-XXX-A2.01 APPLICABLE METHOD OF TESTING:
Simulate performance In-plant TIME FOR COMPLETION:
15 minutes APPLICABILITY:
[X]
[X]
[X]
NLO TASK STANDARDS:
Provide service water flow to the Service Water System, Loop 1, by utilizing the Backup Service Water Pump.
REQUIRED MATERIALS:
DB-OP-02511, Loss of Service Water Pumps/Systems, Revision 02 GENERAL
REFERENCES:
DB-OP-02511, Loss of Service Water Pumps/Systems, Revision 02 INITIAL CONDITIONS:
The Backup Service Water Pump is in service as a dilution source.
Service Water Pump 1 is aligned to supply Primary loads.
INITIATING CUES:
The plant has experienced a loss of all service water pumps.
DB-OP-02511, Loss of Service Water Pumps/Systems, is in progress at Step 4.3.8.
You have been directed to continue with the procedure.
JPM No. B.2.B Page 2 of 7 INITIAL CONDITIONS:
The Backup Service Water Pump is in service as a dilution source.
Service Water Pump 1 is aligned to supply Primary loads.
INITIATING CUES:
The plant has experienced a loss of all service water pumps.
DB-OP-02511, Loss of Service Water Pumps/Systems, is in progress at Step 4.3.8.
You have been directed to continue with the procedure.
JPM No. B.2.B PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT required unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Locate the correct procedure.
STANDARD:
Locate and obtain DB-OP-02511, Loss of Service Water Pumps/
Systems.
COMMENTS:
This JPM is written assuming SW Pump 3 is aligned to Loop 1.
Actual plant conditions may NOT be as assumed.
CUE:
None.
SAT UNSAT
- 2.
PERFORMANCE STEP:
Stop the Backup Service Water Pump.
.C........
STANDARD:
Rotate HIS 3609 to STOP.
CUE:
The B/U Service Water Pump Green Light LIGHTS, Red Light goes OFF and AMPS are Zero SAT UNSAT
- 3.
PERFORMANCE STEP:
Route to Attachment 5.
STANDARD:
Route to section for given conditions.
CUE:
None.
SAT UNSAT
- 4.
PERFORMANCE STEP:
Align the Backup Service Water Pump to Loop 1.
.C.......
STANDARD:
CLOSE SW 403, BSW Pump Outlet to the Collection Box.
CUE:
SW 403 handwheel is rotated clockwise, Indicator moves to CLOSE.
SAT UNSAT Page 3 of 7
JPM No. B.2.B
- 5.
PERFORMANCE STEP:
Align the Backup Service Water Pump to Loop 1.
.C........
STANDARD:
CLOSE SW 400, SW Pump 3 DISCH ISO.
COMMENT:
Sequence is NOT required within this block.
CUE:
SW 400 handwheel is rotated clockwise, Indicator moves to CLOSE.
SAT UNSAT
- 6.
PERFORMANCE STEP:
Align the Backup Service Water Pump to Loop 1 STANDARD:
CLOSE SW 24, SW Pump 3 X-TIE to SW Loop 2.
COMMENTS:
Steps 6 & 7 must be performed prior to steps 8 & 9.
CUE:
SW 24 indicator is at close, handwheel is rotated clockwise.
SAT UNSAT
- 7.
PERFORMANCE STEP:
Align the Backup Service Water Pump to Loop 1 STANDARD:
CLOSE SW 25, SW Pump 3 X-TIE to SW Loop 2.
COMMENTS:
Steps 6 & 7 must be performed prior to steps 8 & 9.
CUE:
SW 25 indicator is at close, handwheel is rotated clockwise.
SAT UNSAT
- 8.
PERFORMANCE STEP:
Align the Backup Service Water Pump to Loop STANDARD:
OPEN SW 22, SW Pump 3 X-TIE to SW Loop 1.
COMMENTS:
Steps 6 & 7 must be performed prior to steps 8 & 9.
CUE:
SW 22 Indicator is at OPEN, handwheel is rotated slightly clockwise then back counterclockwise to OPEN.
I.
SAT UNSAT Page 4 of 7
JPM No. B.2.B
- 9.
PERFORMANCE STEP:
Align the Backup Service Water Pump to Loop 1.
STANDARD:
OPEN SW 23, SW Pump 3 X-TIE to SW Loop 1.
COMMENTS:
Steps 6 & 7 must be performed prior to steps 8 & 9.
CUE:
SW 23 Indicator is at OPEN, handwheel is rotated slightly clockwise then back counterclockwise to OPEN.
SAT UNSAT
- 10. PERFORMANCE STEP:
Align the Backup Service Water Pump to Loop 1
.C........
STANDARD:
OPEN SW 401, BSW Pump Out to SW Pump 3 CUE:
SW 401 handwheel is rotated counterclockwise, Indicator moves to OPEN.
SAT UNSAT
- 11. PERFORMANCE STEP:
Verify the BUSW pump is NOT running.
STANDARD:
Local verification by lights or observing pump CUE:
Green "STOP" light on HIS 3609A is LIT.
BUSW pump is NOT rotating.
SAT UNSAT
- 12.
PERFORMANCE STEP:
Place the Backup Service Water Pump in "FAST" Speed.
.C.......
STANDARD:
Place the Backup Service Water Pump Speed Select Switch HIS 3609A to "FAST" speed.
CUE:
B/U SW Pump Speed Select Switch (HIS 3609A) is rotated to FAST.
SAT UNSAT Page 5 of 7
JPM No. B.2.B Page 6 of 7
- 10. PERFORMANCE STEP:
Start the Backup Service Water Pump.
.C.......
STANDARD:
Communicate with Control Room to start the pump.
CUE:
The Control Room Operator acknowledges and starts the pump.
SAT UNSAT TERMINATING CUES: This JPM is complete.
END TIME
JPM No.
B.2.B VERIFICATION OF COMPLETION Operator Evaluator Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained Yes Result:
No N/A
[ I SATISFACTORY
[ ]
UNSATISFACTORY NOTE: An " Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:_____________________
Evaluator's Signature Page 7 of 7 Date
DAVIS-BESSE NUCLEAR POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NO.:
B.2.C Rev.
00 Page 1 of 6 TASK NO.:
074-008-04-0100 TASK DESCRIPTION:
Perform Actions for Loss of TPCW Pump K/A
REFERENCE:
XXX-GEN-2.4.11 APPLICABLE METHOD OF TESTING:
Simulate Performance In-Plant TIME FOR COMPLETION:
14 minutes APPLICABILITY:
[XI RO
[XI SRO
[X]
NLO TASK STANDARDS:
- 1. Maintain proper discharge pressure on the running TPCW pump.
- 2.
Maintain proper Main Generator Hydrogen Cooler outlet temperature.
- 3.
Start the EIAC and stop the running SAC.
- 4.
Lockout the Mechancial Hogger and isolate cooling water.
REQUIRED MATERIALS:
DB-OP-02514.03, Loss of Turbine Plant Cooling Water Pumps GENERAL
REFERENCES:
DB-OP-02514.03 INITIAL CONDITIONS:
You are the spare RO.
The plant is operating at 100% power, TPCW Pumps 1 and 2 are running.
TPCW Pump 3 is disassembled for maintenance.
SAC 2 is running.
INITIATING CUES:
TPCW Pump 2 has tripped and cannot be restarted.
The Shift Manager, directs you to perform all required local operator actions of DB-OP-02514, Step 4.1.3, including TPCW load reduction.
The HLCWT is at 19 feet and decreasing slowly.
(Hand the examinee a copy of DB-OP-02514)
JPM No.
B.2.C INITIAL CONDITIONS:
You are the spare RO.
The plant is operating at 1009 power, TPCW Pumps 1 and 2 are running.
TPCW Pump 3 is disassembled for maintenance.
SAC 2 is running.
INITIATING CUES:
- 2 TPCW Pump has tripped and cannot be restarted.
The Shift Manager, directs you to perform all required local operator actions of DB-OP-02514, Step 4.1.3, including TPCW load reduction.
The HLCWT is at 19 feet and decreasing slowly.
Page 2 of G
JPM No. B.2.C PERFORMANCE INFORMATION NOTE:
Critical steps denoted with a "C".
Failure to meet any one of these standards for this item constitutes failure.
Sequence is NOT critical unless denoted in the "Comments".
START TIME:
- 1.
PERFORMANCE STEP:
Throttle COOLING WATER PUMP 1-1 DISCHARGE ISOLATION C........
VALVE CW 6 to maintain pump discharge pressure above 50 psig.
STANDARD:
CW6 handwheel rotated clockwise toward closed.
Valve left in throttled position.
CUE:
(If asked prior to throttling, discharge pressure [PI 1582]
is 40 psig).
(CW 6) handwheel has been rotated in clockwise direction.
Pointer moves toward CLOSED.
Discharge pressure (PI 1582) is 55 psig.
SAT UNSAT
- 2.
PERFORMANCE STEP:
.C.........
STANDARD:
Place GEN HYDROGEN COOLERS OUTLET DEG F TIC 2396B in MANUAL and throttle to maintain generator cold gas temperature between 110 and 113 0 F.
Slide moved left to M.
CLOSE pushbutton pressed then released.
Valve left in throttled position.
CUE:
Slide has been moved left to M.
CLOSE button pressed then released.
Red (temperature) indicator rises to 112*F and stops there.
(If asked, EIAC is available).
SAT UNSAT
- 3.
PERFORMANCE STEP:
Start EIAC.
C.
- STANDARD:
Direct CTRM operator to start EIAC OR Press START on HIS 5491.
CUE:
CTRM operator has started EIAC.
OR START has been pressed (on HIS 5491).
Green TRIP light goes OFF.
Red RUN light comes ON.
SAT UNSAT Page 3 of 6
JPM No. B.2.C
- 4.
PERFORMANCE STEP:
Open one of the Diesel Air Compressor Inlet Valves to Station Air Compressor Receiver SA 54 or SA 55.
STANDARD:
Check of valve stem OUT.
COMMENT:
SA 54 is normally open.
CUE:
SA 54 (55) valve stem is OUT.
SAT UNSAT
- 5.
PERFORMANCE STEP:
Open SV 6445 IA/SA CROSSTIE SOLERNOID VALVE.
STANDARD:
SV 6445 OPEN pushbutton pressed.
CUE:
(SV 6445)
OPEN pushbutton has been pressed.
Red OPEN light comes ON, green CLOSED light goes OFF.
SAT UNSAT
- 6.
PERFORMANCE STEP:
Stop the operating Station Air Compressor.
,.Co........
STANDARD:
Direct CTRM operator to stop SAC 1 or SAC 2.
OR Place local SAC 1 or SAC 2 UNLOAD/AUTO switch in UNLOAD.
Press local SAC 1 or SAC 2 STOP pushbutton.
CUE:
CTRM operator has stopped SAC I or SAC 2.
OR (SAC 1 or SAC 2)
UNLOAD/AUTO switch has been placed in UNLOAD.
(SAC 1 or SAC 2)
STOP pushbutton has been pressed.
Compressor shaft stops turning.
SAT UNSAT
- 7.
PERFORMANCE STEP:
Lock out Mechanical Hogger and SAC 1 and 2.
,.C........
STANDARD:
Direct CTRM operator to lock out Mechanical Hogger, SAC 1 and SAC 2.
CUE:
CTRM operator has locked out Mechanical Hogger, SAC 1 and SAC 2.
SAT UNSAT Page 4 of 6
JPM No.
B.2.C
- 8.
PERFORMANCE STEP:
CW 470 SAC 2 Cooling Water Supply.
.C.........
STANDARD:
CW 470 handwheel rotated in clockwise direction.
CUE:
(CW 470) handwheel has been rotated in clockwise direction.
Valve stem is IN.
SAT UNSAT
- 9.
PERFORMANCE STEP:
Close CW 1020 Mechanical Hogger Cooler Inlet.
.C........
STANDARD:
CLOSE pressed on Mechanical Hogger Cooler Inlet Valve NV 1020.
CUE:
(NV 1020)
CLOSE pushbutton has been pressed.
Green light comes ON, red light goes OFF.
SAT UNSAT TERMINATING CUES:
This JPM is complete.
(Terminated by the trainee).
END TIME Page 5 of G
JPM No.
B.2.C VERIFICATION OF COMPLETION Operator Evaluator Validated Completion Time:
minutes Actual Completion Time:
minutes Acceptable Progress Maintained Yes Result:
No N/A
[ ]
SATISFACTORY
[ ]
UNSATISFACTORY NOTE: An " Unsatisfactory" requires Comment and will require subsequent remedial training.
Comments/Feedback:_____________________
Evaluator's Signature
/
Date Page 6 of 6