March 2002 Monthly Operating Report for St. Lucie Units 1 and 2
ML021060118
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/12/2002
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-066
Download: ML021060118 (7)


Text

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 o

April 12, 2002 FPL L-2002-066 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the March 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, Donald E. Jernigan Vice President St. Lucie Plant DEJ/spt Attachments an FPL Group company

DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie Unit 1 April 2, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: March 2002

1. Design Electrical Rating (Mwe-Net)
2. Maximum Dependable Capacity (Mwe-Net)__
3. Number of Hours Reactor Critical
4. Number of Hours Generator On Line
5. Unit Reserve Shutdown Hours
6. Net Electrical Energy (MWH).

830 839 MONTH 744 744 0.0 638961

-YTD 2160 2160 0.0 1855687 CUMULATIVE 178760.5 176947 0.0 144532426

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie #1 April 2, 2002 J.A. Rogers (772) 467-7296 REPORT MONTH March 2002 Unit 1 operated at essentially full power through the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-335 St. Lucie #1 April 2, 2002 J.A. Rogers (772) 467-7296 REPORT MONTH March 2002 Reason A - Equipment Failure (Explain)

B - Maintenance or Test C

Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H-Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

Number Date Typel Duration Reason 2 Method of Cause & Corrective (Hours)

Shutting Action to Down Prevent Recurrence Reactor3 Unit 1 operated at essentially full power for the entire month of March.

F Forced S

Scheduled 2

091A?~ PPL

DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie Unit 2 April 2, 2002 J. A. Rogers (772) 467-7296 REPORTING PERIOD: March 2002

1. Design Electrical Rating (Mwe-Net)
2. Maximum Dependable Capacity (Mwe-Net)
3. Number of Hours Reactor Critical
4. Number of Hours Generator On Line
5. Unit Reserve Shutdown Hours
6. Net Electrical Energy (MWH) 830 839 MONTH 744 744 0.0 637911

-YTD 2145.4 2142.6 0.0 1831237 CUMULATIVE 142158.6 140400.3 0.0 115561883

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie #2 April 2, 2002 J.A. Rogers (772) 467-7296 REPORT MONTH March 2002 Unit 2 operated at essentially full power through the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-389 St. Lucie #2 April 2, 2002 J.A. Rogers (772) 467-7296 REPORT MONTH March 2002 Reason A - Equipment Failure (Explain)

B - Maintenance or Test C

- Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

R - Other (Explain) 3 Method 1

Manual 2

- Manual Scram 3 - Automatic Scram 4

Continued 5 -

Load Reduction 9 - Other (Explain)

Number Date Typel Duration Reason 2 Method of Cause & Corrective (Hours)

Shutting Action to Down Prevent Recurrence Reactor 3 Unit 2 operated at essentially full power for the entire month of March.

1 F

Forced S

Scheduled 091587 POL