AmerGen AmerGen Energy Company, LLC An Exelon/British Energy Company Oyster Creek US Route 9 South P.O. Box 388 Forked River, NJ 08731-0388 April 3, 2002 2130-02-20104 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - March 2002 Enclosed is the March 2002 Monthly Operating Report for the Oyster Creek Generating Station.
The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.
Very truly yours, Ron J. DeGregorio, Vice President Oyster Creek Generating Station Enclosure cc:
Administrator, Region I NRC Senior Project Manager Senior Resident Inspector
APPENDIX A Operating Data Report Docket No:
Date:
Completed By:
Telephone:
50-219 4/01/02 David Egan (609) 971-4818 Reporting Period:
March 2002
- 1.
- 2.
- 3.
- 4.
- 5.
6.
YEAR TO DATE 2160 MONTH DESIGN ELECTRICAL RATING (MWe NET).
The nominal net electrical output of the unit specified by 650 the utility and used for the purpose of plant design.
MAXIMUM DEPENDABLE CAPACITY (MWe NET).
The gross electrical output as measured at the output terminals of the turbine generator during the most 619 restrictive seasonal conditions minus the normal station service loads.
NUMBER OF HOURS REACTOR WAS CRITICAL.
The total number of hours during the gross hours of the 744 reporting period that the re.ctor was critical.
HOURS GENERATOR ON LINE.
(Service Hours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus. The sum of 744 the hours that the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
UNITr RESERVE SHUTDOWN HOURS.
The total number of hours during the gross hours of the reporting period that the unit was removed from service 0
for economic or similar reasons but was available for operation.
NET ELECTRICAL ENERGY (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine generator minus the 471,484 normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
0 1,367,840 CUMULATIVE 203,846.7 199,671.7 918.2 113,474,997 Design values have no "Year to Date" or "Cumulative" significance.
2160
Appendix B Unit Shutdowns Docket No:
Date:
Completed By:
Telephone:
50-219 4/01/02 David Egan (609) 971-4818 Reporting Period:
March 2002 F Forced S Scheduled 1
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 2 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)
During March, Oyster Creek generated 471,484 net MWh electric, which was 102.4% of its MDC rating.
No.
Date Type* Duration ReasonI Method of Cause & Corrective Action to (Hours)
Shutting Down Prevent Recurrence Reactor2 Summary: