Text

Indiana Michigan Power Company Cook Nudear Plant One Cook Place Bridgman MI 49106 616465*15 INDIANA MICHIGAN POWER April 5, 2002 AEP:NRC:2540-01 10 CFR 50.54(a)(4)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 RESPONSE TO QUALITY ASSURANCE PROGRAM DESCRIPTION REDUCTION IN COMMITMENT

Reference:

1) Letter from S. A. Greenlee, Indiana Michigan Power Company, to U. S. Nuclear Regulatory Commission Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, Quality Assurance Program Description Reduction in Commitment," submittal AEP:NRC:2540, dated January 11, 2002.
2) Letter from Singh S. Bajwa, U. S. Nuclear Regulatory Commission to A. C. Bakken III, Indiana Michigan Power Company, "Donald C. Cook Nuclear Plant, Units 1 and 2 -

Quality Assurance Program Reduction in Commitment,"

dated March 8, 2002, (TAC NOS. MB3943 AND MB3944).

Indiana Michigan Power Company (I&M), the Licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, requested approval in Reference 1 for a reduction in commitment to the CNP Quality Assurance Program Description (QAPD). The proposal would have revised Exception/Interpretation I ld to allow continued use of the Training Center File Rooms for the storage of quality assurance records.

In Reference 2, the Nuclear Regulatory Commission (NRC) informed I&M that the proposed reduction in commitment to the QAPD was not acceptable. In addition the NRC requested a schedule as to when the quality assurance records currently stored in the Training Center would be stored in an area that provides adequate protection of the records in accordance with Criterion XVII of Appendix B to 10 CFR 50.

AEPA >merica's Energy Partner

U. S. Nuclear Regulatory Commission AEP:NRC:2540-01 Page 2 In response to Reference 2, I&M will provide storage protection in accordance with 10CFR 50 Appendix B Criterion XVII for the records currently stored in the Training Center by September 30, 2002.

The attachment to this letter contains this new commitment. Should you have any questions or require additional information, please contact Mr. Gordon P. Arent, Manager of Regulatory Affairs, at (616) 697-5553.

Sincerely,

,. A. Greenlee Director, Nuclear Technical Services

/dmb Attachments:

c:

K. D. Curry J. E. Dyer MDEQ - DW & RPD NRC Resident Inspector R. Whale

U. S. Nuclear Regulatory Commission AEP:NRC:2540-01 Page 3 bc:

G. P. Arent P. B. Cowan, w/o attachment R. W. Gaston, w/o attachment S. A. Greenlee S. B. Haggerty D. W. Jenkins, w/o attachment A. K. Medrano T. P. Noonan, w/o attachment J. E. Pollock M. W. Rencheck, w/o attachment J. F. Stang, Jr., - NRC Washington, DC T. R. Stephens

Attachment to AEP:NRC:2540-01 COMMITMENTS The following table identifies those actions committed to by Indiana Michigan Power Company (I&M) in this document. Any other actions discussed in this submittal represent intended or planned actions by I&M. They are described to the Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.

Commitment Date I&M will store the quality assurance records currently stored in the Training Center in an area that provides adequate September 30, 2002 protection of the records in accordance with Criterion XVII of Appendix B to 10 CFR 50.