ML021010407
| ML021010407 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/11/2002 |
| From: | Westreich B NRC/OE |
| To: | Carolina Power & Light Co |
| Nelson D | |
| References | |
| EA-00-022, EA-01-310 EN-02-013 | |
| Download: ML021010407 (1) | |
Text
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION April 11, 2002 EN-02-013 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
Carolina Power & Light Co. (EA-00-022, EA-01-310)
(Shearon Harris)
Docket No. 50-400
Subject:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a WHITE Significance Determination Process (SDP) finding and associated Notice of Violation will be issued on or around April 16, 2002, to Carolina Power & Light Co. as a result of inspections at the Shearon Harris Nuclear Power Plant. This WHITE finding, an issue with low to moderate increased importance to safety, which may require additional NRC inspections, concerned the Thermo-Lag fire barrier assembly that serves as the fire area separation barrier between Fire Area 1-A-SWGR-B [B Train Switchgear Room/Auxiliary Control Panel Room] and Fire Area 1-A-CSR-A [A Train Cable Spreading Room]. This fire barrier did not have the required three-hour fire resistance rating. This condition represented a violation of 10 CFR 50.48 and Harris Operating License Condition 2.F in that the fire resistance rating was indeterminate instead of the required three hour rating. An additional violation of License Condition 2.F was identified in that the 1997 change to the Fire Protection Program revising the rating of the Thermo-Lag fire barrier assembly from three hours to that suitable for the hazard required prior NRC approval. Accordingly, a Notice of Violation representing both a violation associated with a WHITE finding and a Severity Level III violation is being issued.
It should be noted that the licensee has not been specifically informed of this action. The schedule of issuance and notification are:
Mailing of Final Significance Determination and Notice of Violation April 16, 2002 Telephone Notification of licensee April 16, 2002 Contacts:
D.J. Nelson, OE, 415-3280 J. Luehman, OE, 415-2741 Distribution:
OWFN Chairman Meserve Comm. Dicus Comm. Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR OI SP TWFN OCFO OP CENTER NMSS OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS OE:ESDJNelson OE:BWestreich 04/11/02 04/11/02