ML020920709

From kanterella
Jump to navigation Jump to search
February 2002 Monthly Operating Report for Nine Mile Point, Unit 1
ML020920709
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/14/2002
From: Hopkins L
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1649
Download: ML020920709 (5)


Text

A.PR-02-02 TUE 12:41 PH 9 MILE I OPERATIONS r~St)

  • bOo P.O. Box 63 Lycomir 0, New York 13093, 0

Constellation Nuclear Nine Mile Point March 14, 2002 Nuclear Station NMP1L 1649 A Member of the Consfelltion Energy Group U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 1 Docket No. 5 0-220 DPR-63.

Subject:

Monthly Operating Report for February 2002 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for February 2002 for the Nine Mile Point Nuclear Station Unit 1.

Submittal of this information complies with Section 6.9.1.c of the Unit I Technical Specifications.

Very truly yours, Lawrence A. Hopkins Unit I Plant General Manager LAH/j-n Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Huncgs, NRC Senior Resident Inspector Records Management FAX NO. 3153492640 P. 02

A hPR-02-02 TUE 12:41 PM 9 MILE I OPERAlTIONS FAX NO, 3153492640 P. 03 ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 3/5102 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 OPERATING STATUS UniL Name: Nine Mile Point Unit #1 Reporting Period: Pe.hruat.2.002 1

2 Design Elcctrical Rating: (Net MWc)

Maximim Dependable Capacity: (Net MWe) 613 565 CriticulI flours Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generaled (MWH)

This Month 672.0 672.0 0.0 412,470.0 Yr-to-Date 1,416.0 1,416.0 0.0 871,702.0 Cumulative 198,438.1 194,084.2 20.4 107,902,521.0 3

4 5

6

ATPACBMEN'T B UUNIT S HUMTOW NNS REPORTIN4G PERIOD - FEBRUARY 2002 A.

E.quiprn¶=n Failare (Explaizi)

D3.

h'ainftnancz o; Tcsl C.

Ref-iding D.

Regulatony Restddicti E.

Operator Trainaing/Uccns Examimaion F.

Adrinhisntive

0.

Opeational Enxoc (Explan)

H.

Other (Explaia)

ý:"NOTB: Sequcatial numbenio~gusrd.

-o DOCKET NO: i0-220

'l UNMT.ANM N-IMPI DATE: 3/05102 r'-1 PREPARED BY: P. E. Newusil

S TELEPHONE
('315) 309-7935 I,

MamuaI

2.

Manual Trip/Scram Autoroatic ThpiSen~m

4.

C3nti~nation

5.

OlhCr (Explain)

NO.

DATE F: FORCED DURATION REASONS' METHOD OF SHIUTEIXG CAUSE & CORRECTIVE ACTIONS S: SCHEDULED (HOURS)

DOWN;'

COMMENTS N o shutdow.n occurrred -.n Feb ruary 2002

-0i Co m-r CD

-,a CD

A APR-02-02 TUE 12:41 PM 9 MILE I OPERATIONS FAX NO. 3153492640 P. 05 ATTACHMENT C NARRATTVE OF OPERATING EXPERIENCE DOCKFT NO: 50-220 UNIT NAME: NMP1 DATE: 3./05/02 PREPARED BY: P. E. Netosil TELEPHONE: (315) 349-7935 The unit operated during the month of February 2002 with a Net Electrical Design capacity fictor of 100,1 percent. On February 9, 2002, power was reduced to perform a Control Rod Sequence Exchange. There were no challenges to the electromatic relief valves or safety valves during the operating period.

APR-02-02 TUE 12:42 PM 9 MILE I OPERATIONS RO. Box 63 Lyoorning. Now York 13093 0

Constellation Nuclear Nine Mile Point March 14, 2002 Nuclear Station NMP I L 1649 A M4umber of tho Constellnlion Energy Group UJ. S. Nuclear Regulatoiy Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63, Subject.

Monthly Operating Report for February 2002 Gentlemen.

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for February 2002 for the Nine Mile Point Nuclear Station Unit 1, Submittal of this information complies with Section 6.9, 1.c of the Unit 1 Technical Specifications.

Very truly yours, Lawrence A. Hopkins Unit 1 Plant General Manager IAL-jijm Attachmcnts cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K-Hunegs, NRC Senior Resident Inspector Records Management FAX NO. 3153492640 P. 06