ML020870480
| ML020870480 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/15/2002 |
| From: | Overbeck G Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-04669-GRO/SAB/RJR, IEB-01-001 | |
| Download: ML020870480 (7) | |
Text
04/18/21002 13:00 623-393-5442 PAGE 02/08 1 OCFRS0.54(f)
Gregg R. Overbeck Mall SlaBion 75 02 Palo Verde Nuclear Senior Vice Prmsiderl*
TEL (623) 393-5148 P.O Box 52034 Generatinfl Station Nuclear FAX (623) 393-6077 Phoenlx, AZ 85072-2034 102-04669-GRO/SAB/RJR U.S. Nuclear Regulatory Commission March 15, 2002 ATTN: Document Control Desk Washington, DC 20555-0001
References:
- 1. Letter 102-04603-CDM/SAB/RJR, dated September 4, 2001, "Response to NRC Bulletin 2001-01: Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles," from C. D. Mauldin, APS to USNRC.
- 2. Letter dated November 5, 2001, "Palo Verde Nuclear Generating Station, Units 1, 2, and 3-Telephone Conference Summary RE:
Responses to Bulletin 2001-01," from L. R. Wharton, USNRC to G. R. Overbeck, APS.
- 3. Letter 102-04628-GRO/SAB/RJR, dated December 06, 2001, "Revised Inspection Schedule in Response to NRC Bulletin 2001-01, from Gregg R. Overbeck, APS to USNRC.
- 4. Telephone Conferences, dated December 13, 2001 and December 14, 2001, Discussion on Supplemental Response Letter (Reference 3) between APS Staff and USNRC Staff.
- 5. Letter 102-04650-GRO/SAB/RJR, dated January 29, 2002, "Response to NRC Bulletin 2001 -01 Request for Additional Information," from Gregg R. Overbeck, APS to USNRC.
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket Nos. STN 50-528, 50-529, and 50-530 NRC Bulletin 2001-01 Inspection Method This letter amends the Arizona Public Service Company (APS) response to NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles.
A ineinber oc STARS (Stza;,teqir.; Teiixw.i 4*ml Pe.rce Sharinig) A1.i..ng C.lawila y a Colnl',;*cht Pomk - Dibio Canyon -*
Vc*-@e -
,;nimrh Texan Pr-ojecm
- WNo.lf Creýek PALO VERDE NGS
U.S. Nuclear Regulatory Commission ATTN: -Document Control Desk NRC Bulletin 2001-01 Inspection Method Page 2 As a result of pre-outage planning for the reactor vessel head penetration (VHP) inspections, APS has identified some concerns with the ability to successfully perform under the head exams on all nozzles due to accessibility issues.
APS' current commitment, as identified in Reference 5, is to perform 100 percent inspection of the VHPs using a combination of eddy current, liquid penetrant, and ultrasonic examination techniques as necessary. The inspection of the reactor head vent nozzle will be performed by an effective visual examination or by under the head surface and/or volumetric examinations.
APS is now committing to perform a 100 percent inspection of the VHPs using either an effective visual examination, or under the head surface and/or volumetric examinations using a combination of eddy current, liquid penetrant, and ultrasonic examination techniques as necessary. This inspection will include the reactor head vent nozzle.
The schedule for conducting the proposed inspection remains as provided in Reference
- 3. APS will finalize its proposed inspection schedule for Units 1 and 3 based on the results of the Unit 2 inspections and provide the schedule to the NRC.
No new commitments are being made to the NRC by this letter. Please contact Thomas N. Weber at (623) 393-5764 if you have any questions or require additional information.
Sincerely, G RO/SAB/RJ R/kg cc:
E. W. Merschoff J. N. Donohew J. H. Moorman
04/19/2002 13:eO 623-393-5442 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk NRC Bulletin 2001-01 Inspection Method Page 3 FOR INTERNAL DISTRIBUTION ONLY bcc. CONCURRENCE T. N. Weber (7636)
S. A. Bauer (7637)
M. J, Winsor (7669)
C. D. Mauldin (7605) bcc.
NOC M. A, Melton M. E. Powell M. J. Sontag M. K. Banks N. E. Meador G. R. Overbeck W. E. Ide B. A. Pregulman C. K. Seaman STARS Distribution (7602) 7545)
(7299)
(7997)
(7615)
(7636)
(7602)
(7616)
(8695)
(7636) w/o attachments w/o attachments w/o attachments w/o attachments w/o attachments w/o attachments w/o attachments w/o attachments wlo attachments w/o attachments wlo attachments w/o attachments w/o attachments w/o attachments 1Ix e-Mail Hard Copy None COMMITMENTS RCTS Action #:
2419216 Action Group:
ISI Assign To: (Optional)
Melton, M Parent Record #:
Unit 2
Trend Code Date Due:
Milestone ID: (if Applicable) RIO
==
Description:==
Perform a 100% inspection of U2 CEDM nozzles as identified in APS' revised response to NRC Bulletin 2001-01 ir, H
ti!aA
- vd, he*!$*41fac*
id?&6**l) t6 jx -
Provide update to NRC within 30 days following restart.
2 3
All "Active Y Active N Obligation Mgmt Periodic Work Mgmnt PAGE 04/08 PALO 'VERDE NGS
04/18/2002 13:00 623-393-5442 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk NRC Bulletin 2001-01 Inspection Method Page 4 FOR INTERNAL DISTRIBUTION ONLY RCTS Action #:
2419214 Action Group:
ISI Assign To: (Optional)
Melton, M Parent Record #:
Unit
- Trend Code Date Due:
Milestone ID: (If Applicable)
==
Description:==
Finalize proposed inspection schedule for Units 1 and 3 and submit the schedule to the NRC and open additional Actions for Units 1 and 3.
1 Active Y 2
Active N 3
Obligation Mgmt All Periodic Work Mgmnt SOURCE DOCUMENTS
- 2. Letter 102-04603-CDM/SAB/RJR, dated September 4, 2001, "Response to NRC Bulletin 2001-01: Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles," from C. D. Mauldin, APS to USNRC.
- 3. Letter dated November 5, 2001, "Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Telephone Conference Summary RE: Responses to Bulletin 2001-01," from L. R. Wharton, USNRC to G. R. Overbeck, APS.
- 4. Letter 1 02-04628-GRO/SAB/RJR, dated December 06, 2001, "Revised inspection Schedule in Response to NRC Bulletin 2001-01, from Gregg R.
- 5. Telephone Conference, dated December 13, 2001, Discussion on Supplemental Response Letter (Reference 3) between APS Staff and USNRC Staff.
- 6. Email from TNW, 12/14/01, Summary of NRC Phone Call on Bulletin 2001-01
- 7. Email from MJW, 01/08/02, Response to NRC on CEDM Nozzle Inspections PALO VERDE NGS PAGE 05/a8
04/18/2002 13:00 623-393-5442 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk NRC Bulletin 2001-01 Inspection Method Page 5 FOR INTERNAL DISTRIBUTION ONLY VERIFICATION OF ACCURACY RA Preparer: I have prepared the attached document and validated selected statements of fact to the identified source and Licensing Basis documents (QV&V).
/RJ Rogaiski I1 O23
(
7v-trePrinted Date Technical Input: I have reviewed and verified that the technical information been accurately translated and correctly described.
Signature Printed Date RA Peer Reviewer: I have reviewed the attached document for completeness, QV&V adequacy and submittal quality.
NA I
I Signature Printed Date Other Licenaing Document Changes:
[X] NO
[ ]Yes LDCR TS Bases
[XI NO
[ ] Yes LDCR TRM
[X] NO
[ Yes LDCR OX] NO
[] Yes Tracking Number-PAGE 06/08 PALO VERDE NGS OTHER
STATE OF ARIZONA
)
)ss.
COUNTY OF MARICOPA )
I, Gregg R. Overbeck, represent that I am Senior Vice President - Nuclear, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, and that to the best of my knowledge and belief, the statements made therein are true and correct.
Gre dg R. Overbeck Sworn To Before Me This 4Ki1Day Of A
, 2002.
Notary Public ra a Click Yi Not-,, -ubhc-Arizona
ý County
- 3 j Notary Commission Stamp
04/18/2002 13:00 623-393-5442 EXTERNAL CORRESPONDENCE ONLY PVNGS Document Authorization Routing Slip NUCLEAR REGULATORY AFFAIRS LIM I L'.
Spa IDr~ft rIS Nmet¶E:H:N1WJ1chrt3Bu1tln 20010.1O12001.01 scial Inspictlofl MAtllod Chang.sl,doc Changing NRC Bulletin commitment to allow the use of an effective visual examination or under the head
.l 1,*d,.
A d
lIUIUI VUJIUI I IfU I' '*I
.7II i,.
i
-e",
f
,. +.
,h+.
I.+
.+,,
- i i
I{ :
/
. +: + ::
b~ i +: " : " + :" +*
. *J t "..
, " *' + '
' ;:*'3:*, * * :"*"
X:*
,... :.I,,,.:
N."!
TO FINAL APPROVER Target Date:
02/28102 Actual Date:
I Signature Date:
1/
~to/'
Finsl Ra*vlw 3 D ty, Prito Ous C#te)
(D I# F R8ntt Rav1@ww rn s*_e_
SM proved/teffev T,
N Weber 7636 X
t S. A. Bauer 7636 X
/
/';Cw,0 M. J. Winsor 7669 X
3"_,
C, D.
Mauldin 7605 X
G. R. Overbeck 7605 X
RETURN TO: Karen Gantlon STA: 71536 FOR QLJESTIONS, CONTACT: Rich RogaIRkI EXT':
D E:
b";
PAGE 0S/e8 PALO VERDE NGS