|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:Occupational Exposure Record
MONTHYEARML0409101912004-03-26026 March 2004 Transmittal of the 2003 Annual Occupational Radiation Exposure Report ML0208702552002-03-14014 March 2002 Annual Occupational Radiation Exposure Report for 2001 2004-03-26
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 MAR 14 2002 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of )) Docket No. 50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN) - 2001 ANNUAL OCCUPATIONAL RADIATION EXPOSURE REPORT Enclosed is the 2001 Annual Occupational Radiation Exposure Report. This report contains a summary of occupational exposure data for the period of January 1, 2001, to December 31, 2001. Submittal of this report fulfills the requirements of Technical Specification 5.9.1.
If you should have any questions, please contact me at (423) 365-1824.
Sincerely, P. L. Pace, Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Prnted on recycded paper
U.S. Nuclear Regulatory Commission Page 2 MAR 14 2002 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 REIRS Project Manager Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, D.C. 20555
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 1 2001 ANNUAL OCCUPATIONAL RADIATION EXPOSURE REPORT JANUARY 1, 2001 TO DECEMBER 31, 2001 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90
WATTS BAR NUCLEAR PLANT (WBN) 2001 ANNUAL OCCUPATIONAL RADIATION EXPOSURE REPORT Occupational Exposure Data:
Enclosed is the exposure data for personnel at WBN that received greater than 100 millirem between January 1, 2001 and December 31, 2001. The major special maintenance tasks for which exposure data is provided includes:
"* Modification of the waste gas analyzer.
"* Modification and maintenance of the refueling machine.
"* Installation of a permanent ladder outside the pressurizer doghouse.
"* Modification of the Radiation Monitoring System (System 90).
- Modification and upgrade of the polar crane.
WATTS BAR NUCLEAR PLANT Date: 22-JAN-2002 09:20 PO BOX 2000 SPRING CITY, TN, 37381 LICENSE: NPF-90, SNM-IR73 Regulatory Guide 1.16 Information End of Year Report 2001 Number of Personnel
> 100 mrem Total man-rem
- Work and Job Function Station Utility Contractor Station Utility Contractor ROUTINE OPERATIONS AND SURVEILLANCE MAINTENANCE PERSONNEL 0.008 0.000 0.000 0.001 0.000 0.000 OPERATIONS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 1.529 0.000 0.000 0.267 0.000 0.000 SUPERVISORY PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 ENGINEERING PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 ROUTINE PLANT MAINTENANCE MAINTENANCE PERSONNEL 6.743 0.000 1.000 0.828 0.000 0.147 OPERATIONS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 3.663 0.000 0.000 0.702 0.000 0.000 SUPERVISORY PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 ENGINEERING PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 INSERVICE INSPECTION MAINTENANCE PERSONNEL 0.045 0.000 0.000 0.005 0.000 0.000 OPERATIONS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0..95 0.000 0.000 0.036 0.000 0.000 SUPERVISORY PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 ENGINEERING PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 SPECIAL PLANT MAINTENANCE MAINTENANCE PERSONNEL 0.000 0.000 1.000 0.000 0.000 0.106 OPERATIONS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0.019 0.000 0.000 0.003 0.000 0.000 SUPERVISORY PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 ENGINEERING PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 WASTE PROCESSING MAINTENANCE PERSONNEL 0.205 0.000 0.000 0.029 0.000 0.000 OPERATIONS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0.594 0.000 0.000 0.114 0.000 0.000 SUPERVISORY PERSONNEL 0,000 0.000 0.000 0.000 0.000 0.000 ENGINEERING PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000
Regulatory Guide 1.16 Information End of Year Report 2001 Number of Personnel
> 100 mrem Total man-rem
- Work and Job Function Station Utility Contractor Station Utility Contractor REFUELING MAINTENANCE PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 OPERATIONS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 SUPERVISORY PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 ENGINEERING PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 Totals MAINTENANCE PERSONNEL 7.000 0.000 2.000 0.863 0.000 0.253 OPERATIONS PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 6.000 0.000 0.000 1.122 0.000 0.000 SUPERVISORY PERSONNEL 0.000 0.000 0.000 0.000 0.000 0.000 ENGINEERING PERSONNEL 0.000 0,000 0.000 0.000 0.000 0.000 Grand Totals 13.000 0.000 2.000 1.985 0.000 0.253
- The man-rem totals include dose only from individuals receiving more than 100 mrme throughout the year at the site.