ML020870183

From kanterella
Jump to navigation Jump to search

Tech. Spec. Page for Amendment No. 145
ML020870183
Person / Time
Site: Clinton 
Issue date: 03/26/2002
From:
NRC/NRR/DLPM
To:
Hopkins J , NRR/DLPM, 301-415-3027
References
TAC MB2255
Download: ML020870183 (1)


Text

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.8 -------------------

NOTE ---------------------

Only required to be met in MODES 1, 2, and 3.

Verify the combined leakage rate for all In accordance with the Primary secondary containment bypass leakage Containment Leakage Rate paths is _< 0.08 La when pressurized to Testing Program SPa.

SR 3.6.1.3.9


NOTE ----------------------

Only required to be met in MODES 1, 2, and 3.

Verify total leakage rate through all In accordance with the Primary four main steam lines is !_ 112 scfh Containment Leakage Rate when tested at Ž P1.

Testing Program SR 3.6.1.3.10 -----------------

NOTE -----------------------

Only required to be met in MODES 1, 2, and 3.

Verify combined leakage rate through In accordance with the Primary hydrostatically tested lines that Containment Leakage Rate penetrated the primary containment is Testing Program within limits.

(continued)

Amendment No. 145 3.6-19 CLINTON