ML020860568

From kanterella
Jump to navigation Jump to search
Meeting 02-018 with Entergy Nuclear Operations, Inc. Conduct Annual Assessment Meeting to Review Entergy'S Performance in Operating IP3 Facility Over Period April 1, 2001 to December 31, 2001
ML020860568
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/27/2002
From: Eselgroth P
Reactor Projects Branch 2
To:
Shared Package
ML020730378 List:
References
02-018
Download: ML020860568 (5)


Text

March 27, 2002 U.S. NUCLEAR REGULATORY COMMISSION No.02-018 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Indian Point 3 (IP3)

Docket No. 50-286 Time and Date: Thursday, April 11, 2002, at 2:00 p.m.

Location: Verplanck Fire House Broadway and 8th Street (Approximately 200 Yards West of Broadway)

Verplanck, NY 10596

Purpose:

Conduct an annual assessment meeting to review Entergys performance in operating the IP3 facility over the period April 1, 2001 to December 31, 2001.

This assessment is described in the annual assessment letter dated March 1, 2002, and can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/inp3_2001q4.pdf Agenda: The agenda for this meeting will consist of an overview of the NRCs Reactor Oversight process and a presentation on the NRCs annual safety assessment of IP3 by NRC staff, followed by Entergy managements response to the assessment. Detailed finding and performance indicator information for IP3 can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/IP3/ip3_chart.html Following the meeting there will be a brief break followed by a public Q&A session for those who have additional questions for the NRC.

NRC Attendees: P. Eselgroth, Branch Chief, Division of Reactor Projects P. Drysdale, Senior Resident Inspector L. James, Resident Inspector et. al.

Licensee Attendees: John Herron, Indian Point Site Vice President R. Barrett, Vice President, Operations - IP3 J. DeRoy, Plant Manager, Operations - IP3 J. Comiotes, Director, Nuclear Safety Assurance M. Smith, Director Engineering - IP3 et. al.

2 NOTE: This meeting is open to the public for observation. Members of the public may provide comments or questions in writing in advance of the meeting. They may be sent to USNRC, Attn:

Peter W. Eselgroth, 475 Allendale Road, King of Prussia, PA 19406. Attendance by additional NRC personnel should be made known by April 4, 2002, via telephone call to Peter W. Eselgroth at (610) 337-5234. Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known no later than two business days prior to the meeting.

/RA/

Approved By:

Peter W. Eselgroth, Chief Projects Branch 2 Division of Reactor Projects

3 Distribution:

Mr. R. J. Barrett, Vice President, Operations State of New York P. Eselgroth, DRP S. Barber, DRP R. Junod, DRP Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

W. Kane., Deputy Executive Director for Reactor Programs, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation, NRR D. Matthews, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement R. Zimmerman, Deputy Director, Office of Nuclear Regulatory Research (NRR/OD)

J. Zwolinski, Director, Division of Licensing Project Management T. Bergman, RI EDO Coordinator E. Adensam, Project Directorate I-1 (PD1/2), NRR P. Milano, NRR G. Vissing, NRR, (Backup)

W. Lanning, DRS R. Crlenjak, DRS D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA P. Drysdale, Senior Resident Inspector - IP3 G. Matakas, ORA PMNS NRCWEB OEWEB OEMAIL DOCUMENT NAME: C:\ORPCheckout\FileNET\ML020860568.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP E RI/DRP E NAME SBarber/SB PEselgroth/PWE DATE 03/19/02 03/27/02 OFFICIAL RECORD COPY