|
---|
Category:Memoranda
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML22299A1052023-01-11011 January 2023 Memo to File - McGuire Final EA 2017+19+21 ML21056A5502021-04-22022 April 2021 Memo to File - Ea/Fonsi for McGuire DFP ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML19088A1362019-03-29029 March 2019 Public Meeting Summary ML20052D9362018-07-0303 July 2018 Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17151A3372017-06-0202 June 2017 Recommendation for Non-Acceptance with Opportunity to Supplement of McGuire Nuclear Station Units 1 and 2 Technical Specifications Completion Time Extension Request for Failure to Supply Information (CACs MF9673, MF9674) ML17110A1862017-04-20020 April 2017 Summary of Public Meeting - McGuire, Units 1 and 2 to Discuss Concerning Annual Assessment ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML15138A3392015-06-0101 June 2015 Summary of Public Teleconference Regarding Potential Submission of a License Amendment Request for a One-Time Extension of Completion Time for Nuclear Service Water System ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML15119A2182015-04-0707 April 2015 Technical Specification (TS) and Tech Spec Bases (Tsb) Manual ML15083A0832015-03-10010 March 2015 TS Bases Updates ML14136A1302014-05-15015 May 2014 End of Cycle Meeting Summary Memo ML14142A0112014-05-0505 May 2014 Technical Specification & Technical Specification Bases ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13198A1732013-07-17017 July 2013 Notice of Forthcoming Pre-Application Teleconference with Duke Energy Carolinas, LLC, McGuire Units 1 and 2 ML13191A9592013-07-15015 July 2013 Notice of Pre-Application Meeting with Duke Energy Carolinas, LLC, McGuire Units 1 & 2, to Discuss with Licensee Its Proposed License Amendment Request to Technical Specification 3.8.4 Condition a to Allow Replacement of Existing Shared ... ML13204A1162013-06-26026 June 2013 SLC Manual Update ML13135A5962013-05-16016 May 2013 Cancelled 05/23/2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13127A4352013-05-0909 May 2013 Notice of Forthcoming Pre-Application Meeting with Duke Energy Carolinas, Llc. to Discuss a Proposed License Amendment Request Concerning Methodology Report DPC-NE-3001-P for Catawba and McGuire Nuclear Stations ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12340A5182012-11-26026 November 2012 Submittal of Technical Specification (TS) and Technical Specification Bases (Tsb) Manual ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML1218006502012-07-0303 July 2012 Mcguire Nuclear Station, Units 1 and 2 - Fire Protection Fire Protection Safety Evaluation Input Regarding License Amendment Request Measurement Uncertainty Recapture Power Uprate ML11257A0382011-09-0101 September 2011 Technical Specification Bases Updates ML1106603302011-03-0707 March 2011 Notice of Meeting with Duke Energy to Present Status of Licensing Submittals Regarding Implementation of National Fire Protection Association Standard 805, Requirements at Catawba Nuclear Station, Units 1 and 2 and McGuire Nuclear Station ML1104900602011-03-0404 March 2011 Final McGuire Task Interface Agreement (TIA) - McGuire Service Water System Unit Crossties Relative to Sharing/Donating in Abnormal Procedures (TIA 2009-011) ML1029306502010-10-20020 October 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC Regarding McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2, ML1027001972010-09-14014 September 2010 Revisions to Technical Specifications Bases ML1025203282010-09-13013 September 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC (Duke), to Discuss Duke'S Potential Submittal of an Amendment to McGuire 1 and 2 Licenses Regarding Implementation of an Alternate Source Term ML1015804072010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of Duke Energy'S Ownership Interest of Catawba, Units 1 and 2, McGuire, Units 1 and 2, and Oconee, Units 1, 2 and 3 on May 20, 2010 - Finding of No Potential Issues in Bank Statement ML1012604632010-05-0707 May 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC (Duke) to Discuss Duke'S Responses to Generic Letter 2004-02 at Catawba 1 and 2 and McGuire 1 and 2 ML1007503442010-03-10010 March 2010 Submittal of Technical Specification Bases Updates ML0926700202009-10-0707 October 2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02 ML0922908922009-08-18018 August 2009 Notice of Conference Call with Duke Energy Carolinas, LLC (Duke), Regarding Catawba Nuclear Station, Units 1 and 2 (Catawba 1 and 2) and McGuire Nuclear Station Units 1 and 2 ML0908202662009-03-16016 March 2009 Submittal of Facility Operating License Revision ML0831009482008-11-10010 November 2008 Notice of Meeting with Duke Energy Carolinas, LLC, (Duke), Catawba, Units 1 and 2, and McGuire, Units 1 and 2 ML0831107952008-11-0606 November 2008 Cancellation of Meeting with Duke Energy Carolinas, LLC, to Discuss the Request for Additional Information Generic Letter 2004-04, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents. ML0829701832008-10-30030 October 2008 Notice of Meeting with Duke Energy Carolinas, LLC, to Discuss the Request for Additional Information Generic Letter 2004-04, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents ... ML0818301542008-07-0101 July 2008 Notice of Meeting with Duke Energy Carolinas, LLC to Discuss Transition to ASME NQA-1-1994 ML0809200162008-04-0101 April 2008 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.2.06 Regarding Protection Against High-Pressure Feedwater Heater ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment 2024-05-01
[Table view] |
Text
April 2, 2002 MEMORANDUM TO: Richard J. Laufer, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Robert E. Martin, Senior Project Manager /RA/
Project Directorate II-1 Division of Licensing Project Management
SUBJECT:
DOCUMENTATION OF TELEPHONE CONFERENCE WITH DUKE ENERGY ON THE MCGUIRE NUCLEAR STATION On March 21, 2002, the NRC staff (R. Martin, S. Bloom, K. Karwoski, S. Shaeffer, M. Lesser) held a telephone conference with representatives of Duke Energy regarding inspections recently completed on the McGuire Unit 2 reactor vessel head. The telephone conference was held in response to NRC Bulletin 2002-01, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, dated March 18, 2002. Representatives of Duke Energy included M. Wilder, McGuire Licensing Engineer, B. Travis, McGuire Engineering Manager, M. Cash, Corporate Licensing Manager, M. Robinson, Corporate Engineering Manager and D. Whitaker, Engineer.
On or about March 18, 2002, during a final walkdown of McGuire Unit 2 in preparation for exiting its refueling and inspection outage, Duke identified a small amount of boron (approximately 1/2 of a cubic inch) along one of the control rod drive mechanisms. The leak was from an intermediate canopy seal weld. The leak was repaired.
On March 19, 2002, Duke decided to perform a 100 percent bare-metal visual inspection of the reactor vessel head. This inspection was completed on March 20, 2002. The vessel head was found to be in a very clean condition with no boron deposits on the head. Two pieces of foreign material (i.e., instrument clip and steel wire) were found on the head as was some material from the weld preparation for the canopy seal leak discussed above. This latter material was removed. Duke stated that these activities were expected to add about seven rem to the occupational radiation exposure for the outage. With respect to the likelihood of developing circumferential cracking of the control rod drive mechanisms, McGuire Unit 2 has been categorized as a low susceptibility plant.
The NRC staff informed Duke that this telephone conference would be documented in a memorandum to file.
Docket No. 50-370
April 2, 2002 MEMORANDUM TO: Richard J. Laufer, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Robert E. Martin, Senior Project Manager /RA/
Project Directorate II-1 Division of Licensing Project Management
SUBJECT:
DOCUMENTATION OF TELEPHONE CONFERENCE WITH DUKE ENERGY ON THE MCGUIRE NUCLEAR STATION On March 21, 2002, the NRC staff (R. Martin, S. Bloom, K. Karwoski, S. Shaeffer, M. Lesser) held a telephone conference with representatives of Duke Energy regarding inspections recently completed on the McGuire Unit 2 reactor vessel head. The telephone conference was held in response to NRC Bulletin 2002-01, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity", dated March 18, 2002. Representatives of Duke Energy included M. Wilder, McGuire Licensing Engineer, B. Travis, McGuire Engineering Manager, M. Cash, Corporate Licensing Manager, M. Robinson, Corporate Engineering Manager and D. Whitaker, Engineer.
On or about March 18, 2002, during a final walkdown of McGuire Unit 2 in preparation for exiting its refueling and inspection outage, Duke identified a small amount of boron (approximately 1/2 of a cubic inch) along one of the control rod drive mechanisms. The leak was from an intermediate canopy seal weld. The leak was repaired.
On March 19, 2002, Duke decided to perform a 100 percent bare-metal visual inspection of the reactor vessel head. This inspection was completed on March 20, 2002. The vessel head was found to be in a very clean condition with no boron deposits on the head. Two pieces of foreign material (i.e., instrument clip and steel wire) were found on the head as was some material from the weld preparation for the canopy seal leak discussed above. This latter material was removed. Duke stated that these activities were expected to add about seven rem to the occupational radiation exposure for the outage. With respect to the likelihood of developing circumferential cracking of the control rod drive mechanisms, McGuire Unit 2 has been categorized as a low susceptibility plant.
The NRC staff informed Duke that this telephone conference would be documented in a memorandum to file.
Docket No. 50-370 DISTRIBUTION:
PUBLIC PDII-1 R/F RMartin CHawes Accession Number: ML020860122 OFC PDII-1/PM LPM PDII-1/LA PDII-1/ASC NAME RMartin SBloom CHawes RLaufer DATE 4/1/02 4/2/02 4/1/02 4/2/02 OFFICIAL RECORD COPY