Reactor & Senior Reactor Operator Initial Examinations Turkey Point Nuclear Plant - 50-250/2002-301 and 50-251/2002-301
ML020860099
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/22/2002
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Stall J
Florida Power & Light Co
References
50-250/02-301, 50-251/02-301
Download: ML020860099 (5)


See also: IR 05000250/2002301

Text

March 22, 2002

Florida Power and Light Company

ATTN: Mr. J. A. Stall, Senior Vice President

Nuclear and Chief Nuclear Officer

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

TURKEY POINT NUCLEAR PLANT - 50-250/2002-301 AND 50-251/2002-301

Dear Mr. Stall:

In a telephone conversation on March 20, 2002, between Mr. Rich Bretton, Operation Initial

Licensing Training Supervisor, and Mr. Steven D. Rose, Operations Engineer, arrangements

were made for the administration of licensing examinations at Turkey Point Nuclear Plant during

the week of October 7, 2002 (operating test) and October 14, 2002 (written examination). The

on-site preparatory week is scheduled for the week of September 16, 2002.

The NRC will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of

NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will

be given the opportunity to review the examinations during the week of August 26, 2002. The

facility has agreed to fill in the scenario details (ES-D-2) and the details of the JPMs. The

facility has also agreed to make all of the copies of the examination prior to administration.

To meet the above schedule, it will be necessary for your staff to furnish the reference materials

identified in Attachment 2 of ES-201 by April 15, 2002. Any delay in receiving the required

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examination to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

FP&L 2

To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor

operator license applications (Office of Management and Budget (OMB) approval number 3150-

0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)

(OMB approval number 3150-0090) at least 30 days before the examination date. If the

applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The

public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of

Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Rich Bretton has been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Steven D. Rose at (404) 562-4609,

(Internet E-mail: SDR2@NRC.GOV), Ron Aiello at (404) 562-4641, (Internet E-mail:

RFA@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-250, 50-251

License Nos. DPR-31, DPR-41

cc: (See page 3)

FP&L 3

cc contd:

T. O. Jones Attorney General

Plant General Manager Department of Legal Affairs

Turkey Point Nuclear Plant The Capitol

Florida Power and Light Company Tallahassee, FL 32304

Electronic Mail Distribution

William A. Passetti

John P. McElwain Bureau of Radiation Control

Site Vice President Department of Health

Turkey Point Nuclear Plant Electronic Mail Distribution

Florida Power and Light Company

9760 SW 344th Street County Manager

Florida City, FL 33035 Metropolitan Dade County

Electronic Mail Distribution

Olga Hanek

Acting Licensing Manager Craig Fugate, Director

Turkey Point Nuclear Plant Division of Emergency Preparedness

Florida Power and Light Company Department of Community Affairs

Electronic Mail Distribution Electronic Mail Distribution

Don Mothena, Manager Curtis Ivy

Nuclear Plant Support Services City Manager of Homestead

Florida Power & Light Company Electronic Mail Distribution

Electronic Mail Distribution

John E. Kirkpatrick, Training Manager

Rajiv S. Kundalkar Turkey Point Nuclear Plant

Vice President - Nuclear Engineering 9760 SW 344th Street

Florida Power & Light Company Florida City, FL 33035

Electronic Mail Distribution

M. S. Ross, Attorney

Florida Power & Light Company

Electronic Mail Distribution

Jim Reed

Document Control Supervisor

Florida Power & Light Company

Electronic Mail Distribution

FP&L 4

Distribution:

K. Jabbour, NRR

C. Evans (Part 72 Only)

RIDSNRRDIPMLIPB

PUBLIC

OFFICE RII:DRS RII:DRS RII:DRS RII:DRP

SIGNATURE /RA/ /RA/ /RA/ /RA/

NAME SRose:pmd RAiello MErnstes RMusser

DATE 3/ 21 /2002 3/ 22 /2002 3/ 22 /2002 3/ 22 /2002

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\120day letter(SDR).wpd