VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 13, 2002 United States Nuclear Regulatory Commission Serial No.02-147 Attention: Document Control Desk NAPS/JHL Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the February 2002 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, D. A. Heacock Site Vice President Enclosure Commitments made in this letter: None.
cc:
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT FEBRUARY 2002 Approved:
Site Vice President Date
OPERATING DATA REPORT 50-338 03105/02 D. A. Heacock (540) 894-2101 U n it N a m e :............................................................
Reporting Period:..................................................
Licensed Thermal Power (MW t):..........................
Nameplate Rating (Gross MW e):..........................
Design Electrical Rating (Net MW e):....................
Maximum Dependable Capacity (Gross MWe):....
Maximum Dependable Capacity (Net MWe):........
North Anna Unit 1 February 2002 2,893 979.74 907 971 925
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10.
Reasons For Restrictions, If Any:
N/A This Month Year-To-Date Cumulative
- 11.
Hours in Reporting Period 672.0 1,416.0 207,660.0
- 12.
Hours Reactor Was Critical 672.0 1,416.0 167,711.8
- 13.
Reactor Reserve Shutdown Hours 0.0 0.0 7,275.2
- 14.
Hours Generator On-Line 672.0 1,416.0 164,445.3
- 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16.
Gross Thermal Energy Generated (MWH) 1,943,242.7 4,093,777.5 447,523,784.4
- 17.
Gross Electrical Energy Generated (MWH) 660,967.0 1,392,284.0 184,747,515.0
- 18.
Net Electrical Energy Generated (MWH) 629,368.0 1,325,728.0 140,145,295.0
- 19.
Unit Service Factor 100.0%
100.0%
79.2%
- 20.
Unit Availability Factor 100.0%
100.0%
79.2%
- 21.
Unit Capacity Factor (Using MDC Net) 101.2%
101.2%
75.4%
- 22.
Unit Capacity Factor (Using DER Net) 103.3%
103.2%
74.4%
- 23.
Unit Forced Outage Rate 0.0%
0.0%
6.8%
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
(
Reference:
Letter Serial No.00-070, dated February 11, 2000)
- 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
N/A Estimated start-up dates are no longer provided.
(
Reference:
Letter Serial No.00-070, dated February 11, 2000)
- 26.
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
Docket No.:
Date:
Contact:
Telephone:
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit Name:
North Anna Unit 1 Date:
03/05/02
Contact:
D. A. Heacock Telephone:
(540) 894-2101 MONTH:
February, 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 937 937 936 936 936 937 936 936 937 936 936 936 936 936 936 936 Day 17 18 19 20 21 22 23 24 25 26 27 28 Average Daily Power Level (MWe - Net) 936 937 936 936 937 937 938 937 937 937 938 938 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Docket No.:
50-338 Unit Name:
North Anna Unit 1 Date:
03/05/02
Contact:
D. A. Heacock Telephone:
(540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: February, 2002
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data February 1, 2002 0000 Began the month in Mode 1, 100% power, 983 MWe.
February 28, 2002 2400 Ended the month in Mode 1, 100% power, 984 MWe.
Docket No.:
50-338 Unit Name:
North Anna Unit 1 Date:
03/05/02
Contact:
D. A. Heacock Telephone:
(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: February, 2002 (1)
(2)
(3)
(4)
(5)
Method Report Duration of LER No.
System Component Cause &
No.
Date Type Hours Reason Shutting Code Code Corrective Action Down to Prevent Reactor Recurrence None during the reporting period.
(2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F
Administrative G -
Operational Error H -
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Continuations 5 -
Load Reduction 9 -
Other (5)
Exhibit H - Same Source (1)
F:
Forced S:
Scheduled
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unit Name:
North Anna Unit 2 Date:
03/05/02
Contact:
D. A. Heacock Telephone:
(540) 894-2101 MONTH:
February, 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 923 923 923 923 923 923 923 923 924 924 923 923 922 923 923 923 Day 17 18 19 20 21 22 23 24 25 26 27 28 Average Daily Power Level (MWe - Net) 923 923 923 923 923 922 922 922 922 922 924 922 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Docket No.: 50-339 Unit Name:
North Anna Unit 2 Date:
03/05/02
Contact:
D. A. Heacock Telephone:
(540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: February, 2002
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
Date Time Data February 1, 2002 0000 Began the month in Mode 1, 100% power, 969 MWe.
February 28, 2002 2400 Ended the month in Mode 1, 100% power, 965 MWe.
Docket No.:
50-339 Unit Name:
North Anna Unit 2 Date:
03/05/02
Contact:
D. A. Heacock Telephone:
(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: February, 2002 None during the reporting period.
(2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error H -
Other (explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Continuations 5 -
Load Reduction 9 -
Other (5)
Exhibit H - Same Source (1)
F:
Forced S:
Scheduled