February 2002 Monthly Operating Report for Palo Verde, Units 1, 2, & 3
ML020840386
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/12/2002
From: Ide W
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00696-WEI-SMM
Download: ML020840386 (4)


Text

William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00696-WEI/SMM March 12, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-52815291530 Monthly Operating Reports for FEBRUARY 2002 Enclosed are the Monthly Operating Reports for FEBRUARY 2002, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Sue Meyer at (602) 250-3078.

Sincerely, WEI/SMM/cj

Enclosures:

FEBRUARY 2002 Monthly Operating Reports cc:

E. W. Merschoff (all w/enclosures)

J. H. Moorman INPO Records Center Utility Data Institute

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Repo 50-528 PVNGS-1 03/07/02 S. M. Meyer (602) 250-3078 rting Period:

February 2002

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

3.
4.
5.

6.

1243 UNIT SHUTDOWNS Outage Duration TypeI Hours Reason2 Method of Shutting Down Reactor 3

Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of February 2002.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit 1 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 672.0 1,416.0 107,647.1 Hours Generator was On-Line 672.0 1,416.0 106,303.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 848,590 1,791,580 127,755,138 No.

Date 1F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

F 50-529 PVNGS-2 03/07/02 S. M. Meyer (602) 250-3078 Reporting Period:

February 2002

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

3.
4.
5.

6.

1243 UNIT SHUTDOWNS Outage Duration Type1 Hours Reason 2 Method of Shutting Down Reactor 3

Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of February 2002.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 672.0 1,416.0 107,317.5 Hours Generator was On-Line 672.0 1,416.0 106,014.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 857,904 1,807,809 128,732,320 No.

Date 1F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

50-530 UNIT NAME:

PVNGS-3 DATE:

03/07/02 COMPLETED BY:

S. M. Meyer TELEPHONE:

(602) 250-3078 Reporting Period:

February 2002

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

Unit 3 Generating Statistics This Month Yr. to Date Cumulative

3.

Hours Reactor was Critical 672.0 1,416.0 102,839.7

4.

Hours Generator was On-Line 672.0 1,416.0 101,851.9

5.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

6.

Net Electrical Energy Generated (MWh) 860,200 1,811,622 124,181,072 UNIT SHUTDOWNS Outage Method of Duration Shutting Down No.

Date Type1 Hours Reason 2 Reactor 3 No reactor shutdowns occurred during the month of February 2002.

Cause and Corrective Action to Prevent Occurrence 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

1247 1F-Forced S-Scheduled