Submittal of Carolina Power & Light Companys & Florida Power Corporations Semiannual Fitness for Duty Program Performance Data for Brunswick Steam Electric Plant, Shearon Harris Nuclear Power Plant, H.B. Robinson Steam Electric Plant, Cryst
ML020780395
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  
Issue date: 02/19/2002
From: Morton T
Carolina Power & Light Co, Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PE&RAS-02-007
Download: ML020780395 (13)


Text

CP&L "A

Progress Energy Company 10 CFR 26.71 (d)

SHFlorida Power A Progress Energy Company PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-02-007 February 19, 2002 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:

In accordance with 10 CFR 26.7 1(d), enclosed is Carolina Power & Light (CP&L) Company's and Florida Power Corporation's (FPC) semiannual Fitness For Duty (FFD) Program performance data for the above listed plants.

The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period July 1, 2001 through December 31, 2001.

Please contact me at (919) 546-6901 if you need additional information concerning this report.

Sincerelv.

Terry C. Morton Manager - Performance Evaluation & Regulatory Affairs DSL Enclosure c:

L. A. Reyes, Regional Administrator - Region II T. A. Easlick, USNRC Senior Resident Inspector - BSEP, Unit Nos. 1 and 2 A. G. Hansen, NRR Project Manager - BSEP, Unit Nos. 1 and 2; HBRSEP, Unit No. 2 J. B. Brady, USNRC Senior Resident Inspector - SHNPP, Unit No. 1 J. M. Goshen, NRR Project Manager - SHNPP, Unit No. 1; CR-3 USNRC Resident Inspector - HBRSEP, Unit No. 2 USNRC Resident Inspector - CR-3 J. A. Sanford - North Carolina Utilities Commission

Fitness For Duty Program (July 1, 2001 - December 31, 2001)

PERFORMANCE DATA

SUMMARY

OF MANAGEMENT ACTIONS Lessons Learned and Actions Taken Not applicable for this reporting period.

2

EFFECTIVENESS EVALUATION Fitness For Duty Program Performance Data Random testing is required to be performed at an annual rate of at least 50% of the workforce in accordance with 10 CFR 26.24(a)(2). The current six month reporting period random testing rate was approximately 27.8 % for Carolina Power and Light Company (CP&L) Plants (Brunswick, Harris, and Robinson) and 23.9% for Florida Power Corporation (FPC) Crystal River Plant. For CP&L, there were 943 random tests conducted with an average of 3389 workers eligible for testing. For FPC, there were 252 random tests conducted with an average of 1054 workers eligible for testing. The annual testing rate for CP&L was approximately 55.8%

with 1796 random tests conducted with an average of 3220 workers eligible for testing. The annual testing rate for FPC was approximately 51.3% with 488 random test conducted with an average of 951 workers eligible for testing.

For this reporting period for CP&L, the total rate of positive test results was approximately 0.73%. There were 18 positive results out of 2477 tests.

The positive test results were comprised of 14 pre-access, 3 random, 0 for-cause, and 1 other. For this reporting period for FPC, the total rate of positive test results was approximately 0.82%. There were 11 positive results out of 1338 tests. The positive test results were comprised of 10 pre-access, 0 random, 1 for-cause, and 0 other. For the year for CP&L, the total rate of positive results was approximately 0.87%. There were 39 positive test results out of 4479 tests. The annual positive test results were comp-nid of 34 pre-access, 4 random, 0 for-cause, and 1 other. For the year for FPC, the total rate of positive results was approximately 0.66%. There were 11 positive test results out of 1662 tests. The annual positive test results were comprised of 10 pre-access, 0 random, 1 for-cause and 0 other. Unescorted access for the individuals with confirmed positive tests was denied or revoked, as applicable.

For this reporting period for CP&L, the positive test rate for employees was 0%, with 0 positive results out of 649 tests. For FPC, the positive test rate for employees was 0.24% with 1 positive result out of 423 tests.

For this reporting period for CP&L, the positive test rate for contractors was approximately 0.98% with 18 positive results out of 1828 tests. For FPC, the positive test rate was 1.09% with 10 positive results out of 915 tests.

There were no identified abuses of over-the-counter or prescription medication during the reporting period.

One Operational Experience (OE) item was generated and distributed relative to the blind sample provider submitting two samples that had a higher concentration of opiates than certified in their certificate of analysis.

3

EVENTS REPORTED TO THE NRC Events Reported By Telephone Under 10 CFR 26.73 None.

4

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 July 1, 2001 to December 31, 2001 Carolina Power & Light Company Company Brunswick Steam Electric Plant Location Cindy Cunningham Contact Name 6 Months Ending 919-546-5360 Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

D--

Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300-------..

Alcohol (% BAC) 0.04%

/

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 888 N/A 256 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 24 0

N/A N/A 71 2

For Cause:

Post accident 0

0 N/A N/A 0

0 Observed behavior 0

0 N/A N/A 1

0 Random 235 0

N/A N/A 54 0

Follow-Up 0

0 N/A N/A 0

0 Other 0

0 N/A N/A 0

0 Total 259 0

N/A N/A 126 2

Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuan Amphet-Phency-Refusal a

Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4

5

_(NRCICP&L Licensee Employees 0/0 0

0 0

0 0

0 0

Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0/2 0

0 0

0 0

0 0

A Total 0/2 0

0 0

ll0 0

0 0

0/2

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 July 1, 2001 to December 31, 2001 6 Months Ending Carolina Power & Light Company Company Shearon Harris Nuclear Power Plant Location Cindy Cunningham Contact Name 919-546-5360 Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

F-1 Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 660 N/A 951 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 37 0

N/A N/A 1338 12 For Cause:

Post accident 0

0 N/A N/A 0

0 Observed behavior 0

0 N/A N/A 4

0 Random 238 0

N/A N/A 273 3

Follow-Up 0

0 N/A N/A 0

0 Other 0

0 N/A N/A 1

1 TOTAL 275 0

N/A N/A 1616 16

Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuan Amphet-Phency-Refusal a

Cocaine Opiates amines clidine Alcohol to Test 1

2 3

4 5

(NRC/CP&L Licensee Employees 0/0 0

0 0

0 0

0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 2/8 3

0 0

0 1

2 A

Total 2/8 3

0 0

0 1

j 2

j 1118/1

Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuan Amphet-Phency-Refusal a

Cocaine Opiates amines clidine Alcohol to Test 1

2 3

4 5

(NRC/CP&L Licensee Employees 0/0 0

0 0

0 0

0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0/0 0

0 0

0 0

0 A

Total 0/0 0

0 0

0 0

0 1

10/0

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company Company H. B. Robinson Steam Electric Plant Location Cindy Cunningham Contact Name July 1, 2001 to December 31, 2001 6 Months Ending 919-546-5360 Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

-- Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC 0.04%

/

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 511 N/A 123 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 8

0 N/A N/A 49 0

For Cause:

Post accident 0

0 N/A N/A 0

0 Observed behavior 0

0 N/A N/A 1

0 Random 107 0

N/A N/A 36 0

Follow-Up 0

0 N/A N/A 0

0 Other 0

0 N/A N/A 0

0 TOTAL 115 0

N/A N/A 86 0

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Florida Power Corporation Company Crystal River Nuclear Plant Location Cindy Cunningham Contact Name July 1, 2001 to December 31, 2001 6 Months Ending 919-546-5360 Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml)

F Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500

/

Cocaine 300/150 Phencyclidine 25/25

/

Opiates 300/300 Alcohol (% BAC) 0.04%

/

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 750 N/A 304 Unescorted Access CATEGORIES

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 222 1

N/A N/A 858 9

For Cause:

Post accident 1

0 N/A N/A 0

0 Observed behavior 0

0 N/A N/A 2

1 Random 198 0

N/A N/A 54 0

Follow-Up 0

0 N/A N/A 0

0 Other 2

0 N/A N/A 1

0 TOTAL 423 1

N/A N/A 915 10

Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuan Amphet-Phency-Refusal a

Cocaine Opiates amines clidine Alcohol to Test 1

2 3

4 5

(NRC/CP&L Licensee Employees 0/1 0

0 0

0 0

0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 6/3 2

0 0

0 0

0 Total 6/4 2

0 0

0 0

0

  • NOTE: One individual tested positive both for marijuana and cocaine.