ML020720137

From kanterella
Jump to navigation Jump to search
Report on Trip to Brunswick by Brian B. Bonser on 02/27/2002
ML020720137
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/11/2002
From: Brian Bonser
Division Reactor Projects II
To: Mallett B
NRC/RGN-II
References
Download: ML020720137 (3)


Text

March 11, 2002 MEMORANDUM TO: Bruce S. Mallett, Deputy Regional Administrator FROM: Brian R. Bonser, Chief /RA/

Reactor Projects Branch 4 Division of Reactor Projects

SUBJECT:

REPORT ON TRIP TO BRUNSWICK DATES OF VISIT: February 27, 2002 PURPOSE OF VISIT: Meet with resident inspectors and meet with licensee management INSPECTORS OBSERVED: Ted Easlick SENIOR LICENSEE PERSON CONTACTED: Neil Gannon, Director of Site Operations OBSERVATIONS NOTED WITH PLANT: Toured Unit 1 with Ted Easlick. There was a lot of activity due to the refueling outage beginning on Friday March 1. Made a comprehensive tour of Unit 1 and the control room. Overall Unit 1 looked in good material condition for a unit that had been on-line for over 700 days. The plant did not appear to be limping into the outage all equipment appeared to be functioning normally.

OTHER COMMENTS: The licensee had no concerns with the inspection program. Discussed inspection program and the cable spreading room sprinkler system issue with the residents.

Also toured cable spreading rooms.

Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 cc: Regional Administrator Technical Division Directors Cognizant Senior Resident Inspector Cognizant DRP Branch Chief Cognizant NRR Project Manager Division Secretary Distribution: (See page 2)

B. Mallett 2 Distribution:

Docket Files PUBLIC DOCUMENT (circle one): YES NO OFFICE DRP/RII SIGNATURE BBonser:vyg NAME 3/11/2002 DATE 3/11/2002 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\Tripbru11.wpd