ML020660568

From kanterella
Jump to navigation Jump to search
Inspection / Activity Plan 03/01/2002 - 03/31/2002
ML020660568
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/01/2002
From:
Carolina Power & Light Co
To:
NRC/RGN-II
Shared Package
ML020660513 List:
References
IR-02-001
Download: ML020660568 (2)


Text

Brunswick Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2002 11:13:30 Report 22 1

EB2 ISI

- INSERVICE INSPECTION Baseline Inspections 03/04/2002 03/08/2002 Inservice Inspection Activities IP 7111108 1

2 PS-SEC

- SECURITY Baseline Inspections 03/18/2002 03/22/2002 Access Authorization Program (Behavior Observation Only)

IP 7113001 1, 2 Baseline Inspections 03/18/2002 03/22/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)

IP 7113002 1, 2 Baseline Inspections 03/18/2002 03/22/2002 Performance Indicator Verification IP 71151 1, 2 1

EB2-MODS - SPECIAL SEISMIC MODS INSPECTION Baseline Inspections 03/25/2002 03/29/2002 Permanent Plant Modifications IP 7111117B 1

1 EB2 HS

- HEAT SINK Baseline Inspections 06/10/2002 06/14/2002 Heat Sink Performance IP 7111107B 1, 2 1

PS-RP

- RADIATION PROTECTION-@ CORP ENV. LAB Baseline Inspections 06/19/2002 06/20/2002 Radiological Environmental Monitoring Program IP 7112203 1, 2 3

PS-RP

- RADIATION PROTECTION Baseline Inspections 07/22/2002 07/26/2002 Radiation Monitoring Instrumentation IP 7112103 1, 2 Baseline Inspections 07/22/2002 07/26/2002 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 07/22/2002 07/26/2002 Radiological Environmental Monitoring Program IP 7112203 1, 2 1

PS-SEC

- SECURITY Baseline Inspections 08/05/2002 08/09/2002 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)

IP 7113003 1, 2 1

PS-RP

- RADIATION PROTECTION Baseline Inspections 09/09/2002 09/13/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/09/2002 09/13/2002 Performance Indicator Verification IP 71151 1, 2 3

EB2-MODS - MODIFICATIONS/10CFR50.59 Baseline Inspections 09/23/2002 09/27/2002 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 09/23/2002 09/27/2002 Permanent Plant Modifications IP 7111117B 1, 2 1

BR4FLOOD - BASELINE FLOODING INSPECTION Baseline Inspections 10/07/2002 10/11/2002 Flood Protection Measures IP 7111106 1, 2 2

OL EP

- EMERGENCY EXERCISE Baseline Inspections 11/18/2002 11/22/2002 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 11/18/2002 11/22/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 11/18/2002 11/22/2002 Performance Indicator Verification IP 71151 1, 2 2

OL EXAM

- INITIAL EXAM Not Applicable 02/03/2003 02/07/2003 BRUNSWICK/EXAMS AT POWER FACILITIES V23179 1

3 PS-RP

- RADIATION PROTECTION Baseline Inspections 02/24/2003 02/28/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Brunswick Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2002 11:13:30 Report 22 3

PS-RP

- RADIATION PROTECTION Baseline Inspections 02/24/2003 02/28/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 02/24/2003 02/28/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 02/24/2003 02/28/2003 Performance Indicator Verification IP 71151 1, 2 1

EB2 ISI

- INSERVICE INSPECTION Baseline Inspections 03/10/2003 03/14/2003 Inservice Inspection Activities IP 7111108 2

3 PS-RP

- RADIATION PROTECTION Baseline Inspections 03/10/2003 03/14/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/10/2003 03/14/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/10/2003 03/14/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/10/2003 03/14/2003 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.