Robinson Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2002 11:15:56 Report 22 3
EB2 MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 03/18/2002 03/22/2002 Evaluation of Changes, Tests, or Experiments IP 7111102 2
Baseline Inspections 03/18/2002 03/22/2002 Permanent Plant Modifications IP 7111117B 2
1 EB2 HS
- HEAT SINK Baseline Inspections 04/08/2002 04/12/2002 Heat Sink Performance IP 7111107B 2
1 PS-RP
- RADIATION PROTECTION-@ CORP ENV. LAB Baseline Inspections 06/19/2002 06/20/2002 Radiological Environmental Monitoring Program IP 7112203 2
1 EB2-MR
- MAINTENANCE RULE Baseline Inspections 07/15/2002 07/19/2002 Maintenance Rule Implementation IP 7111112B 2
2 OL PREP
- INITIAL EXAM PREP Not Applicable 07/15/2002 07/19/2002 ROBINSON/INITIAL EXAMS AT POWER FACILITIES V23151 2
3 OL EXAM
- INITIAL EXAM Not Applicable 07/29/2002 08/02/2002 ROBINSON/INITIAL EXAMS AT POWER FACILITIES V23151 2
3 PI&R
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 08/12/2002 08/16/2002 Identification and Resolution of Problems IP 71152 2
Baseline Inspections 08/26/2002 08/30/2002 Identification and Resolution of Problems IP 71152 2
3 PS-RP
- RADIATION PROTECTION Other Routine 10/07/2002 10/11/2002 Operation Of An ISFSI IP 60855 2
Baseline Inspections 10/07/2002 10/11/2002 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 10/07/2002 10/11/2002 ALARA Planning and Controls IP 7112102 2
Baseline Inspections 10/07/2002 10/11/2002 Radioactive Material Processing and Transportation IP 7112202 2
Baseline Inspections 10/07/2002 10/11/2002 Performance Indicator Verification IP 71151 2
1 EB2-ISI
- INSERVICE INSPECTION/TI 2515/145 Safety Issues 10/14/2002 10/23/2002 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01)
Baseline Inspections 10/14/2002 10/23/2002 Inservice Inspection Activities IP 7111108 2
- EMERGENCY PLANNING INSPECTION Baseline Inspections 10/21/2002 10/24/2002 Performance Indicator Verification IP 71151 2
Baseline Inspections 10/21/2002 10/25/2002 Alert and Notification System Testing IP 7111402 2
Baseline Inspections 10/21/2002 10/25/2002 Emergency Response Organization Augmentation Testing IP 7111403 2
Baseline Inspections 10/21/2002 10/25/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 2
Baseline Inspections 10/21/2002 10/25/2002 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 2
3 PS-RP
- RADIATION PROTECTION Other Routine 11/04/2002 11/08/2002 Operation Of An ISFSI IP 60855 2
Baseline Inspections 11/04/2002 11/08/2002 Access Control to Radiologically Significant Areas IP 7112101 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2002 11:15:56 Report 22 3
PS-RP
- RADIATION PROTECTION Baseline Inspections 11/04/2002 11/08/2002 ALARA Planning and Controls IP 7112102 2
Baseline Inspections 11/04/2002 11/08/2002 Radioactive Material Processing and Transportation IP 7112202 2
Baseline Inspections 11/04/2002 11/08/2002 Performance Indicator Verification IP 71151 2
1 PS-SEC
- SECURITY Baseline Inspections 11/18/2002 11/22/2002 Access Authorization Program (Behavior Observation Only)
Baseline Inspections 11/18/2002 11/22/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
Baseline Inspections 11/18/2002 11/22/2002 Performance Indicator Verification IP 71151 2
1 EB1-SSDI
- SSDI - PRE-INSPECTION VISIT Baseline Inspections 01/27/2003 01/31/2003 Safety System Design and Performance Capability IP 7111121 2
4 EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 02/24/2003 02/28/2003 Safety System Design and Performance Capability IP 7111121 2
4 EB1-SSDI
- SSDI - INSPECTION Baseline Inspections 03/10/2003 03/14/2003 Safety System Design and Performance Capability IP 7111121 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.