ML020640414

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure EI--ZZ-00200, Rev 10, Augmentation of the Emergency Organization.
ML020640414
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/27/2002
From:
AmerenUE
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EIP-ZZ-00200, Rev 10
Download: ML020640414 (12)


Text

DATE: 02/27/02 AMEREN/UE PAGE: 42 TIME: 09:08:22 DOCUMENT CONTROL SYSTEM ARDC8801 DOCUMENT TRANSMITTAL TRANSMITTAL NUMBER: 482464 RETURN ACKNOWLEDGED TRANSMITTAL AND TO CONTROL NUMBER: 338U SUPERSEDED DOCUMENTS (IF APPLICABLE) TO:

TITLE: OTHER ADMINISTRATION RECORDS DEPT: NUCLEAR REGULATORY COMM. ANEREN/UE LOCATION: USNRC - WASH DC CALLAWAY PLANT TRANSMITTAL DATE: 20020227 P.O. BOX 620 FULTON, MO 65251 TRAN DOC RET ALT ALT CODE TYPE DOCUMENT NUMBER REV REV MED COPY MED COPY AFFECTED DOCUMENT R PROC EIP-ZZ-00200 010 009 C 1 ACKNOWLEDGED BY: DATE:

EIP-ZZ-00200 Revision 010 January 17, 2002 CALLAWAY PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EIP-ZZ-00200 AUGMENTATION OF THE EMERGENCY ORGANIZATION RESPONSIBLE DEPARTMENT Emergency Preiparedness PROCEDURE OWNER S. J. Crawford WRITTEN BY D. E. Trokev PREPARED BY G. R. Penderniraff APPROVED BY 1/- -

DATE ISSUED This procedure contains the following:

Pages 1 through 4 Attachments 1 through 4 Tables through Figures through Appendices through Checkoff Lists through This procedure has 0 checkoff list(s) maintained in the mainframe computer.

Conversion of commitments to TRS reference/hidden text completed by Revision Number:

Non-T/S Commitments 007

EIP-ZZ-00200 Rev. 010 TABLE OF CONTENTS Section Page Number 1 PURPOSE AND SCOPE 1 2 DEFINITIONS 3 RESPONSIBILITIES 2 4 INITIATING CONDITIONS 2 5 PROCEDURE 2 5.1 CALLAWAY PLANT EMERGENCY PAGING SYSTEM ACTIVATION 2 5.2 EMERGENCY RESPONSE FACILITIES (ERFS) 3 5.3 FAILURE OF THE PAGING SYSTEM 4 6 REFERENCES 4 7 RECORDS 4 Pager Response - Rapid Responder Emergency Response 1 Page Organization Pager Response - TSC Emergency Response Organization 1 Page Pager Response - EOF/JPIC Emergency Response Organization 1 Page Manual Callout List 2 Pages

-i-

EIP-ZZ-00200 Rev. 010 AUGMENTATION OF THE EMERGENCY ORGANIZATION 1 PURPOSE AND SCOPE 1.1 PURPOSE This procedure provides guidance for the augmentation of the Callaway Plant Emergency Response Organization (ERO).

1.2 SCOPE 1.2.1 This procedure outlines the proper use of the Callaway Plant's Emergency Paging System.

2 DEFINITIONS 2.1 Callaway Plant Emergency Paging System - An alpha/numeric paging system that uses a computer program and modem to alert and activate the Emergency Response Organization.

2.2 Emergency Response Facility (ERF) - A collective name for specifically designated locations which are equipped to facilitate the control and coordination of emergency activities and assessment.

2.3 Emergency Response Personnel - AmerenUE and/or contract personnel trained to fill emergency response positions within the Emergency Response Organization.

I 2.4 System Activation - Initiating the Emergency Paging System for an event, such as an Emergency, Drill, or Test.

2.4.1 Emergency Message - An actual event, thus giving the message to the responders that an emergency has been declared, this is not a drill, and response to their Emergency Response Facility is necessary.

2.4.2 Drill Message - A planned mock event, thus giving the message to the responders that this is a drill, but response to their Emergency Response Facility is still necessary.

EIP-ZZ-00200 Rev. 010 2.4.3 Test Message - A planned event, where the message to the responders is that a test is being conducted, only a test, and response to their Emergency Response Facility is not required.

3 RESPONSIBILITIES 3.1 The Shift Supervisor (SS)/Emergency Coordinator (EC) is responsible for providing the Secondary Alarm Station (SAS)

Operator with proper information to initiate the Callaway Plant Paging System.

3.2 The SAS Operator is responsible for activating the Callaway Plant Emergency Paging System as per KOA-ZZ-00200, Activation of the Callaway Plant Emergency Paging System.

4 INITIATING CONDITIONS 4.1 Implement this procedure upon any of the following conditions:

  • Declaration of an Alert.
  • Declaration of a Site Emergency.
  • Declaration of a General Emergency.
  • At the discretion of the Shift Supervisor/Emergency Coordinator.

5 PROCEDURE 5.1 CALLAWAY PLANT EMERGENCY PAGING SYSTEM ACTIVATION 5.1.1 The SS/EC notifies the Secondary Alarm Station (SAS) Operator to activate the Callaway Plant Emergency Paging System using KOA-ZZ-00200, Activation of the Callaway Plant Emergency Paging System.

EIP-ZZ-00200 Rev. 010 5.1.2 The SAS Operator records responses to the first two initial pages for Rapid Responders on Attachment 1 by retrieving Audix messages per KOA-ZZ-00200.

5.1.3 The SAS operator should initiate a third page if an incomplete response is attained from Responders on Attachment 1 within the first 15 minutes prior to delivery of Attachment 1 to the SS/EC.

5.1.4 The SAS Operator forwards Attachment I to the SS/EC when complete or in approximately fifteen (15) minutes.

5.1.5 If positions on Attachment 1 remain unfilled the SS/EC should initiate a manual callout per section 5.3.

5.1.6 When Attachment 1 is complete, FAX it to the TSC (68604) and EOF (64900).

5.2 EMERGENCY RESPONSE FACILITIES (ERFS) 5.2.1 Each Emergency Response Facility is responsible for their respective mailbox. The activity of verifying ERO Staffing for each facility should be assigned to the Logistics Support Group in the EOF, or the Admin Coordinator in the TSC.

5.2.2 To access the Audix mailbox, dial 64777 and enter the proper extension listed below, followed by the (#) key. Press the (#) key again for the password.

"* TSC Emergency Response Organization - 68400

"* EOF/JPIC Emergency Response Organization - 68202 5.2.3 Follow the Audix directions to get messages.

5.2.4 Do NOT delete messages. Press the (#) key to skip messages without deleting. Emergency Preparedness WILL delete the messages after the event.

5.2.5 Fill out Attachment 2 for the TSC and Attachment 3 for the EOF/JPIC.

EIP-ZZ-00200 Rev. 010 5.3 FAILURE OF THE PAGING SYSTEM 5.3.1 If the paging system should fail or if some of the positions fail to respond, the SS/EC will identify available personnel to perform a manual callout.

5.3.2 Using the Emergency Telephone Directory, Attachment 1, and Attachment 4, locate the page that contains the list of personnel qualified for the position desired and call each until positions are filled with the appropriate number of responders.

NOTE: The Responders MUST be asked if they are fit for duty and given any additional information stipulated by the SS/EC.

6 REFERENCES 6.1 KOA-ZZ-00200, Activation of the Callaway Plant Emergency Paging System.

7 RECORDS 7.1 After the event, send Attachments 1, 2, 3, and 4 to Emergency Preparedness for proper dissemination to QA Record File K171.0010.

EIP-ZZ-00200 Rev. 010 PAGER RESPONSE (Audix 64600)

RAPID RESPONDERS EMERGENCY RESPONSE ORGANIZATION DATE TIME OF DECLARATION ESTIMATED TIME OF NAME POSITION ARRIVAL

_ EDO/EMERGENCY COORDINATOR (EDO/EC)

___________TECHNICAL ASSESSMENT COORDINATOR (A)_____

_ TSC COMMUNICATOR (ENS)_ _

___________*__RECOVERY MANAGER (RM)

OFF-SITE LIAISON COORDINATOR (OSL- ..........

_____'DOSE ASSESSMENT COORDINATOR (DAC) _

_HEALTH PHYSICS COORDINATOR (HPC)

NOTE: For Rapid Responder positions not filled, the SS/EC should I initiate a manual callout per EIP-ZZ-00200 section 5.3.

Page 1 of 1 ATTACHMENT 1

EIP-ZZ-00200 Rev. 010 PAGER RESPONSE (Audix 68400)

TSC EMERGENCY RESPONSE ORGANIZATION DATE TIME OF DECLARATION ESTIMATED

_ NUMBER TIME OF NAME I POSITION REOUIRED ARRIVAL I . CHEMISTRY CONTROL ROOM/TSC CTOORCDOINATTOOR LIAISON (CTL- Mc a 1I I

_________ &ELECTRICAL

'ADMERGNCYTRTIEA ENGINEERER.COORDINATOR -Eetia _______

M.......... ECH................----


2 EMERGENCY TEAM COORDINATOR - Electrical 1 _

SEMERGENCY TEAM COORDINATOR - Mechanical 1

- - - - - - ~ ~~---- --- - ------

RAD CHEM SUPPORT 14 I&RECTO/ULA ENGINEER

! 1 I M__ ECADICAENGINEER............................... ----------------------------------


iiI I -i __ _ _ _ _ _

___________SSUPPORTCOORDINATOR - --------- I- 1OC I .___

REACTOR/NUCLEAR ENGINEER 1 i[

i * ~~SECURITY COORDINATOR-...... ........ ... ......... 1 [

STORES PERSONNEL1 ,

!  !~~

TSC LEAD ,ENGINER ii Page 1 of 1 ATTACHMENT 2

EIP-ZZ-00200 Rev. 010 PAGER RESPONSE (Audix 68202)

EOF/JPIC EMERGENCY RESPONSE ORGANIZATION DATE TIME OF DECLARATION S- ------------------ ----- ---------

ESTIMATED NUMBER TIME OF NAME POSITION REQUIRED ARRIVAL COMPANY SPOKESPERSON 1 DOSE ASSESSMENT COORDINATOR (DAC) 1 _

EOF COMMUNICATOR 1 _

_ JPIC ADMINISTRATOR 1 _

iJPIC COORDINATOR 1 I

_______________JPIC EDITOR 1 ________

IJPIC MEDIA HOST 1 JPIC TECHNICAL REPRESENTATIVE 2

___________LOGISTICAL SUPPORT COOODIUNAT-OR '(LSC) _ _____

_____________LOGISTICAL SUPPORT STAFF2 _______

____________PLANT ASSESSMENT COORDINATOR (PAC) __1 ______

1PLANT ASSESSMENT STAFF 1_______

PROTECTIVE MEASURES COORDINATOR (PMC) 1 _____

Page 1 of 1 ATTACHMENT 3

EIP-ZZ-00200 Rev. 010 MANUAL CALLOUT LIST POSITION Number ACCEPTING INDIVIDUAL Required (name) 1 Rad Chem Support 14 2 Electricians 2 3 Protective Measures Coordinator (PMC) 1 4 Chemistry -Goordinator I 5 Operations Support Coordinator (OSC) 1 6 Emerg. Team Coordinator Electrical 1 7 Emerg. Team Coordinator Mechanical 1 8 Control Room (CR)/TSC Liaison 1 9 TSC Lead Engineer 1 10 Dose Assessment Coordinator 1 11 EOF Communicator 1 Page 1 of 2 ATTACHMENT 4

EIP-ZZ-00200 Rev. 010 MANUAL CALLOUT LIST POSITION Number ACCEPTING INDIVIDUAL Required (name) 12 Mechanics 2 13 I&C Engineer 1 14 Reactor/Nuclear Engineer 1 15 Mechanical Engineer 1 16 Electrical Engineer 1 17 Plant Assessment Coordinator (PAC) 1 18 Engineering Status Board/Logkeepers 3 19 Plant Assessment Staff 1 20 Stores Personnel 1 21 Security Coordinator 1 22 Administrative Coordinator 1 23 Logistical Support Coordinator 1 24 Logistical Support Staff 2 25 -Company Spokesperson I1 26 JPIC Technical Representative 2 27 JPIC Coordinator 1 28 JPIC Administrator 1 29 JPIC Editor 1 30 JPIC Media Host 1 31 I&C Technician 1 Page 2 of 2 ATTACHMENT 4