Nuclear Operating Company South Texas Projet ectnc Gcncrat'n Station PO. Box 289 Wadsworth. Txs 77483 February 13, 2002 NOC-AE-02001263 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 & 2 Docket Nos. STN 50-498 & 50-499 Annual Reports Required by Technical Specification 6.9.1.2 Attached are the Annual Reports required by the South Texas Project Technical Specification 6.9.1.2. Attachment 1 is the Annual Personnel Exposure Report required by Technical Specification 6.9.1.2.a. Attachment 2 is the annual report required by Technical Specification 6.9.1.2.b of the results of specific activity analyses for any primary coolant samples exceeding Technical Specification 3.4.8 limits.
If you have any questions on this matter, please contact Mr. S. M. Head at (361) 972 7136 or me at (361) 972-7566.
G.T. Powell
- Manager, Health Physics RDP/
Attachments: 1) 2001 Annual Personnel Exposure Report
- 2)
Primary Coolant Specific Activity Report For Samples Exceeding Technical Specification Limits O:\\QUALITY & LICENSING\\NL\\Rrep-2002\\0200L263 STI: 31404075
NOC-AE-02001263 Page 2 Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani Project Manager U. S. Nuclear Regulatory Commission 1 White Flint North, Mail Stop: O-7D1 11555 Rockville Place Rockville, MD 20852-2738 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code MN1 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius 1111 Pennsylvania Avenue Washington, DC 20004 M. T. Hardt/W. C. Gunst City Public Service P. 0. Box 1771 San Antonio, TX 78296 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, Texas 78205-3692 Institute of Nuclear Power Operations - Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 R. L. Balcom/D. G. Tees Reliant Energy, Inc.
P. 0. Box 1700 Houston, TX 77251 C. A. Johnson/A. C. Bakken, III AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5022 Wadsworth, TX 77483 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Attachment I NOC-AE-02001263 Page 1 of 3 2001 Annual Personnel Exposure Report (Technical Specification 6.9.1.2.a)
Technical Specification 6.9.1.2.a requires a tabulation on an annual basis of the number of station, utility, and other personnel (including contractors) receiving exposures greater than 100 mrem/yr according to work and job functions. This data is based on self-reading dosimetry results and is presented on page two of this attachment. Specific tasks included in the Special Maintenance work and job function are listed on page three.
O:\\QUALITY & LICENSING\\NL\\PRrp-2002(\\02001263 STI:31404075
61t28102 AT 17:08 Plant Radiation Exposure Planning And REporting Database Licensee STP NUCLEAR OPERATING COMPANY Address Post Office Box 289 Wadsworth, Texas 77483 APPENDIX A REPORTING YEAR 2001 Page 1
OF 1
NRC License Number (s) : NPF - 76; NPF -80 STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION NUMBER OF PERSONNEL(> 100 MREM)
TOTAL MAN-REM (ALL PERSONNEL)
STATION UTILITY CONTRACTORS STATION UTILITY CONTRACTORS WORK & JOB REACTOR OPS & SURVEILANCE OPERATIONS MAINTENANCE ENGINEERING GEN. SUPPORT NUCLEAR A&L PROJECTS OTHER ROUTINE MAINTENANCE OPERATIONS MAINTENANCE ENGINEERING GEN. SUPPORT NUCLEAR A&L PROJECTS OTHER IN-SERVICE INSPECTION OPERATIONS MAINTENANCE ENGINEERING GEN. SUPPORT NUCLEAR A&L PROJECTS OTHER SPECIAL MAINTENANCE OPERATIONS MAINTENANCE ENGINEERING GEN. SUPPORT NUCLEAR A&L PROJECTS OTHER WASTE PROCESSING OPERATIONS MAINTENANCE ENGINEERING GEN. SUPPORT NUCLEAR A&L PROJECTS OTHER REFUELING OPERATIONS MAINTENANCE ENGINEERING GEN. SUPPORT NUCLEAR A&L PROJECTS OTHER TOTAL WORK & JOB FUNCTION OPERATIONS MAINTENANCE ENGINEERING GEN. SUPPORT NUCLEAR A&L PROJECTS OTHER GRAND TOTAL EMPLOYEES EMPLOYEES AND OTHERS EMPLOYEES EMPLOYEES ANDU UOHE 22 69 15 38 4
6 8
162 0
0 0
0 0
0 0
0 38 3
69 3
329 0
442 6.181 0.385 1.361 6.493 0.135 0.216 0.379 0.029 11.750 0.236 0.713 0.047 0.158 0.341 0.053 1.647 1.998 0.122 0.134 0.639 0.157 0.000 2.038 0.476 4.469 0.515 0.297 0.359 0.559 0.148 0.000 1.562 0.006 0.035 0.018 0.005 7.306 0.596 1.637 0.219 0.013 0.958 6.827 23.274 4.667 14.996 1.056 1.358 2.212 54.390 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.028 0.078 5.469 0.065 0.928 0.056 0.000 5.673 0.102 0.544 0.033 22.822 0.002 0.000 4.258 0.481 0.234 0.165 1.087 0.000 0.000 1.604 0.067 14.780 0.037 86.148 0.041 0.000 0.000 0.000 5.807 0.000 0.083 0.008 0.000 0.054 0.010 1.467 0.369 14.407 0.000 0.000 11.617 0.738 28.301 0.669 125.475 0.107 166.907 NOC-AE-02001263 Page 3 of 3 2001 Annual Personnel Exposure Report (Technical Specification 6.9.1.2.a)
Additional Information
- 1.
The South Texas Project includes two 1250 MWe Westinghouse four-loop pressurized water reactors.
- 2.
During 2001, Unit 1 completed its tenth refueling outage, IRE10. Outage IRE10 involved refueling and baseline eddy current testing of four steam generators.
- 3.
Outage IRE10 was completed in 21.6 days with a total dose of 90 rem. The following are major activities that occurred during this outage.
a)
Steam Generator Testing and Maintenance Activities (40.7 rem) b)
Refueling Maintenance Activities (10.2 rem) c)
Reactor Coolant Pump Maintenance and Modifications (8.7 rem) d)
Plant Projects* (6.8 rem)
- 4.
During 2001, Unit 2 completed its eighth refueling outage, 2RE08. Outage 2RE08 involved refueling, maintenance of four steam generators, and preparations for steam generator replacement.
- 5.
Outage 2RE08 was completed in 26.9 days with a total dose of 118 rem. The following are major activities that occurred during this outage.
a)
Steam Generator Maintenance Activities (44.3 rem) b)
Refueling Maintenance Activities (10.3 rem) c)
Reactor Coolant Pump Maintenance and Modifications (7.9 rem) d)
Plant Projects* (6.5 rem) e)
Preparations for Unit 2 Steam Generator Replacement (17.1 rem)
- 6.
For 2001, eleven individuals exceeded one rem deep dose equivalent with the highest exposed individual receiving 1.576 rem by electronic dosimeter records. All eleven individuals worked both refueling outages.
Plant Projects includes motor operated valve testing, snubbers, in-service weld inspections, non-intrusive check valves, local leak rate tests, and jib crane modifications.
O\\QUAL[TY & LICENSING\\NL\\Rrep-2002\\02001263 STI: 314040175 NOC-AE-02001263 Page 1 of 1 Primary Coolant Specific Activity Report For Samples Exceeding Technical Specification Limits Technical Specification 6.9.1.2.b requires the results of the specific activity analyses in which the primary coolant exceeded the limits of Technical Specification 3.4.8 to be reported on an annual basis.
Unit 1 and Unit 2 have not exceeded the limits of Technical Specification 3.4.8 for the calendar year of 2001.
O\\QUALITY & LICENSING\\NL\\Rrep-2002\\02001263 STI: 31404075
NRC CORRESPONDENCE SIGNOFF SHEET OPGP05-ZN-0006-01 (Page 1 of 1)
Correspondence
Title:
NOC-AE:
Condition Report No.:
Annual Reports Required by Technical Specification 6.9.1.2 02001263 Review Due Date: 2/28/02 01-5482 The persons whose initials appear below have personally reviewed the enclosed materials with regards to their area of responsibility and have verified that it is accurate to the best of their knowledge and belief. Initialing below constitutes acceptance of attached assigned commitments.
Preparer ZLZ *X Date z Reviewer Date 2./13 VP Generation Date Reviewer Date VP Business Services Date Reviewer Date VP Engineering & Technical Services Date Reviewer Date Plant General Manager Date Reviewer Date Director, Quality & Licensing Date Reviewer Date Manager, Licensing I
Date zuat' Reviewer Date____
Dept. Manager Date Reviewer-Mlk-"
Date Dept. Manager 4
Date Ij 4
- OJ_,
Reviewer Date 2 /2 Technical
Contact:
Leonard Earls/Dan Bryant Licensing
Contact:
Robyn Dally Piggott o.
Ext: 7759/7172 Ext: 7438 CALL LICENSING CONTACT WHEN READY FOR PICK-UP