ML020580252
ML020580252 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 02/12/2002 |
From: | Detroit Edison |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML020580252 (8) | |
Text
DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/12/02 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvi Date Sec Status TMTRM TRM VOL I 52 11 IR 02/12/02 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: e51833 a0 V
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 52 dated 02/12/02 Immediately, upon receipt of the item(s) below, please insert and/or remove the documents indicated. Please destroy the removed documents. Please be sure that Revision 51 dated 11/16/01 has been inserted prior to inserting these pages.
Location Remove Insert In Front of TRM Title Page Rev 51 11/16/01 Title Page Rev 52 02/12/02 Manual Immediately following List of Effective Pages List of Effective Pages Title Page LEP- 1 through LEP- 4 Rev 51 11/16/01 LEP- 1 through LEP- 4 Rev 52 02/12/02 3.3 Instrumentation Page TRM 3.3-18 Rev 31 10/99 Page TRM 3.3-18 Rev 52 02/12/02 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM ,1File: 1754 DSN: TRM VOL I Rev: 52 Date: 02/12/02 Recipient C z's.
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i - Revision 31 TRM 3.3-32 Revision 31 TRM ii Revision 31 TRM 3.3-33 Revision 31 TRM iii Revision 31 TRM 3.3-34 Revision 31 TRM iv Revision 34 TRM 3.3-35 Revision 31 TRM v Revision 31 TRM 3.3-36 Revision 41 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 1.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-40 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-41 Revision 31 TRM 3.0-1 Revision 31 TRM 3.3-42 Revision 45 TRM 3.0-2 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-3 Revision 31 TRM 3.3-44 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-b Revision 31 TRM 3.4-a Revision 31 TRM 3.3-c Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-d Revision 31 TRM 3.4-la Revision 34 TRM 3.3-1 Revision 34 TRM 3.4-lb Revision 34 TRM 3.3-2 Revision 39 TRM 3.4-2 Revision 31 TRM 3.3-3 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-11 Revision 31 TRM 3.5-1 Revision 31 TRM 3.3-12 Revision 31 TRM 3.6-a Revision 31 TRM 3.3-13 Revision 31 TRM 3.6-1 Revision 31 TRM 3.3-14 Revision 31 TRM 3.6-2 Revision 31 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 31 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 31 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 39 TRM 3.6-9 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 31 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 31 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM 3.3-31 Revision 31 TRM 3.6-19 Revision 31 TRM Vol1. 1 LEP-I REV 52 02/12/02
- PMT Sm ? '1~MT -TECHNICALREOUIREMENTS MANUAL VOL II FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL LIST OF EFFECTIVE PAGES Paqe Revision Page Revision TRM 3.6ý20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 47 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 31 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 31 TRM 3.12-4 Revision 31 TRM 3.7-2 Revision 31 TRM 3.12-5 Revision 38 TRM 3.7-3 Revision 31 TRM 3.12-6 Revision 31 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 40 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 31 TRM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 31 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 31 TRM 5.0-5 Revision 31 TRM Vol. I LEP-2 REV 52 02/12/02
- T
- m AT -, - '
I'D ýMfhTtr7AT 'D 'MWf=jr MkAi'KWTAT. IMT. T LIST OF EFFECTIVE PAGES Pacre Revision Pacre Revision TRM 5 .-
0-6 Revision 31 TRM B3.6.3-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.6.4-1 Revision 31 TRM 5.0-8 Revision 31 TRM B3.6.5-1 Revision 31 TRM 5.0-9 Revision 31 TRM B3.6.6-1 Revision 31 TRM BI.0-1 Revision 31 TRM B3.6.7-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6. 8-1 Revision 31 TRM B3.0-1 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3.0-2 Revision 31 TRM B3.7.2-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.7.3-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.4-1 Revision 31 TRM B3.0-5 Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.0-6 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.0-7 Revision 31 TRM B3 .7.6-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3 .7.7-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3 .7.8-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3 .7.9-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3 7.9-2 Revision 31 TRM B3.3.2-1 Revision 31 TRM B3 .8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3 .8.2-1 Revision 31 TRM B3.3.3-1 Revision 31 TRM B3 .8.3-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3 .8.4-1 Revision 31 TRM B3.3.4-2 Revision 31 TRM B3 .8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3 .8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3 .9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3 .9.2-1 Revision 31 TRM B3.3.6-2 Revision 31 TRM B3 .9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3 .9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3 .10-1 Revision 31 TRM B3.3.6-5 Revision 31 TRM B3 11. 1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3 .12. 1-1 Revision 31 TRM B3.3 .7-2 Revision 31 TRM B3 .12.2-1 Revision 44 TRM B3.3.8-1 Revision 31 TRM B3 .12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3 .12.4-1 Revision 31 TRM B3.3. 10-1 Revision 31 TRM B3 .12.5-1 Revision 31 TRM B3.3. 11-1 Revision 45 TRM B3 .12.6-1 Revision 31 TRM B3.3.12-1 Revision 31 TRM B3 .12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3 .12.8-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4. 1-1 Revision 31 TRM B3.4 .1-2 Revision 34 TRM B3.4.1-3 Revision 34 TRM B3.4 .1-4 Revision 34 TRM B3.4.1-5 Revision 34 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM B3.4.6-1 Revision 31 TRM B3.4.7-1 Revision 31 TRM B3.5-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B3.6.2-1 Revision 31 TRM Vol. I LEP- 3 REV 52 02/12/02
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9,-Revision 0 Pacre Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 TRM Vol. I LEP-4 REV 52 02/12/02
ECCS Instrumentation TR 3.3.5.1 TABLE TR3.3.5.1-l (Page 2 of 3)
Emergency Core Cooling System Instrumentation RESPONSE TIME FUNCTION TRIP SETPOINT (seconds)
- 3. High Pressure Coolant Injection (HPCI) System
- a. Reactor Vessel Water Level - Low Low, Level 2 > 110.8 inches(c) <60(a)
I
- b. Drywell Pressure - High < 1.68 psig NA
- c. Reactor Vessel Water Level - High, Level 8 < 214 inches(c) NA
- d. Condensate Storage Tank Level - Low > 3 inches NA (27 inches above tank bottom)
- e. Suppression Pool Water Level - High < 2 inches(d) NA
- f. Manual Initiation NA NA
- 4. Automatic Depressurization System Initiation System (ADS) Trip System A
- a. Reactor Vessel Water Level - Low Low Low, > 31.8 inches(c) NA Level 1
- b. Drywell Pressure - High < 1.68 psig NA
- c. Automatic Depressurization System Initiation < 105 seconds NA Timer
- d. Reactor Vessel Water Level - Low, Level 3 > 173.4 inches(c) NA (Confirmatory)
- e. Core Spray Pump Discharge Pressure - High > 145 psig, NA increasing
- f. Low Pressure Coolant Injection Pump Discharge > 125 psig, NA Pressure - High increasing
- g. Drywell Pressure - High Bypass < 420 seconds NA
- h. Manual Inhibit NA NA
- i. Manual Initiation NA NA (continued)
(a) Instrument response time need not be measured and may be assumed to be the design instrumentation response time. Prior to return to service of a new transmitter or following refurbishment of a transmitter (e.g., sensor cell or variable damping components), a hydraulic response time test will be performed to determine an initial sensor-specific response time value. This value is the maximum analyzed, combined instrument and system hydraulic response time. The system hydraulic response time test criterion is maintained by the Fermi 2 IST program to ensure the integrated system response time remains well within the analyzed limit.
(c) As referenced to instrument zero Top of Active Fuel (TAF).
(d) Suppression Pool Water Level instrument zero is 14 ft 6 inches above bottom of Torus at elevation 557 ft 0 inches.