ML020510531
ML020510531 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 02/06/2002 |
From: | Operator Licensing and Human Performance Branch |
To: | |
References | |
50-302/02301 | |
Download: ML020510531 (208) | |
See also: IR 05000302/2002301
Text
Final Submittal
(Blue Paper)
1. Administrative Questions/JPMs
2. In-plant JPMs
3. Control Room JPMs (simulator JPMs)
CRYSTAL RIVER EXAM
50-302/2002-301
JAN. 28 - FEB. 6, 2002
a -
ES-301 Administrative Topics Outline Form ES-301-1
Facility: Crystal River Unit 3 Date of Examination: 01-28-2002
Exam Level: RO/SRO Operating Test No.: 1
Administrative Describe method of evaluation:
Topic/Subject 1. ONE Administrative JPM, OR
Description 2. TWO Administrative Questions
A.1 Plant JPM - Perform an Estimated Critical Boron Calculation (ECB)
Parameter /001A4.10/ 3.5/3.9 (OP-210 Enclosures 4/5) [D, bank]
Verification
Plant JPM - Perform a Time to Boil Calculation / 025AA1.02/ 3.8/3.9
Parameter (OP-103H) IN, new]
Verification
A.2 Surveillance JPM - Perform RCP Seal Data Sheet / 003A4.04/ 3.1/3.0 (SP-300
Testing Enclosure 2 page 5) [D, bank]
A.3 Radiation JPM - Determine worker stay times and dose requirements with
Hazards survey maps/ 2.3.4/ 2.5/3.1 (RSP-101, and HPP-300) [N, new]
A.4 SRO JPM - Determine Emergency Action Level and Complete the
Emergency action levels State of Florida Notification Message Form for Nuclear Power
and classifications Plants/2.4.41/4.1 (EM-202) [N, new]
A.4 RO JPM - Complete an OFF-Site Dose Assessment during
Emergency Radiological Emergencies (Control Room Method) 2.3.10/ 2.9
Dose Assessment (EM-204A) [D, bank]
CRYSTAL RIVER UNIT 3
ADMINISTRATIVE JOB PERFORMANCE MEASURE
Task: Perform Estimated Critical Boron
Alternate Path: N/A
JPM #: AIA (2K2) [BANK # 234]
K/A Ratinetlmportance: 001A4.10/3.5/3.9
Task Number/Position: 115010201 1/RO
Task Standard: Calculate an ECB
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ In-Plant_ Admin x Perform x Simulate
References:
1. OP-210 Rev. 58
Validation Time: 40 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finsn:
SAT UNSAT Performance Time:
Performance Ratilng: _
Examiner: /
Printed Name Signature Date
Comment:
Tools/EouiDment/Procedures Needed:
1. SP-210 Enclosure 4 and 5
2. Calculator
3. OP-103C
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
The plant has just completed a 27-day outage, the core has 10 EFPD, and it had to shutdown for
provided the
the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to repair a MSIV. Due to the time frame the reactor engineer has
following data:
Xenon -2.43 DeltaK/K Samarium -.03 DeltaK/K
Plant conditions are as follows:
RCS boron is 2250 ppm RCS temperature is 532 OF
Anticipated critical rod position is 40% on group 6, with group 8 rods at 30%.
Boron 10 atom percent is 19.8
Initiating Cues:
You are requested to perform an ECB.
2
START TIME:
I
STEP 1:
Obtain a copy of appropriate procedure. UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
Provide candidate with a clean copy of OP-210 Enclosure 4 and 5, and OP-103C.
Calculators will also be provided if the candidate does not have one.
COMMENTS:
3
STEP 2: uritical Step
Candidate should complete OP-210 Enclosure 4 and 5. UNSAT
STANDARD:
Candidate completes. OP-210. Candidate returns materials to you.
EXAMINER CUE:
EXAMINER NOTE:
See attached key for answers; each reactivity listed should be within + 0.05
%Ak/k.
COMMENTS:
END OF TASK
TIME STOP
4
KEY
Enclosure 4
1. 1OEFPDX.991 = 9.91 EFPD
Curve 1 +15.375
2. Xenon - 2.43
3. Samarium - 0.03
4. Temperature 532 therefore no factor 0000
5. Rod Index curve Group 1-7 -1.541
Group 8 -0.1605
6. Sum 11.2135DK/K
6b. HZP inverse boron worth 148.8343
6c. Multiply
6d. ECB 1668.95 (round to 1669) ppm
6e. Boron 10 a/o 19.8
6f. Adjusted B-10 a/o 1669 ppm
6g. +1.0 DK/K 12.2135 DK/K
6h. -1.0 DK/K 10.2135 DK/K
6i. Multiply +1 1817.78 (round to 1818) ppm
6j. +1 boron 1818 ppm
6k. +1 B-10 a/o 1818 ppm
61. Multiply-I 1520 ppm
6m. -1 boron 1520 ppm
6n. -1 B-10 a/o 1520 ppm
TOLERANCE on boron of + 100 ppm (this is approximately 5 %)
Enclosure 5
Step 1 a single ECB is necessary may only use enclosure 4
Step 2 rod positions are given just a repeat
Step 3 1520/1669/1818 Boron concentrations (-1 / ECB / +1)
Step 4 to be completed N/A
Step 5 to be completed N/A
Step 6 data transfer may or may not complete
5
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
The plant has just completed a 27-day outage, the core has 10 EFPD, and it had to shutdown for the last
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to repair a MSIV. Due to the time frame the reactor engineer has provided the following data:
Xenon -2.43 DeltaK/K Samarium -.03 DeltaK/K
Plant conditions are as follows:
RCS boron is 2250 ppm RCS temperature is 532 'F
Anticipated critical rod position is 40% on group 6, with group 8 rods at 30%.
Boron 10 atom percent is 19.8
Initiating Cues:
You are requested to perform an ECB.
6
CRYSTAL RIVER UNIT 3
ADMINISTRATIVE JOB PERFORMANCE MEASURE
Task: Operate the plant within the guidelines specified for mode 5 outages and reduced
reactor coolant system RCS inventory operations.
Alternate Path: N/A
JPM#: AiB (2K2) [NEW]
K/A Rating/Importance: 025AA1.02 3.8/3.9
Task Number/Position: 1190102001/RO
Task Standard: Perform a time to boil / core uncovery calculation
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ In-Plant_ Admin x Perform x Simulate
References:
1. OP-103H Rev. 3
Validation Time: 30 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT - UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Equipment/Procedures Needed:
1. OP-103H
2. Calculator
3.
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
Plant is in MODE 6,
RCS temperature is 100°F,
RCS pressure 0 psig,
Nozzle dams installed,
RCS vessel level 131 feet.
Refueling in progress, 120 burned fuel assemblies in the core.
Plant was shutdown at 0800 01/12/02
Current date is 0800 01/19/02
Initiating Cues:
You are requested to perform a time to boil / time to core uncovery calculation (OP-103H).
2
START TIME:
I
STEP 1:
Obtain a copy of appropriate procedure. UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
Provide candidate with a clean copy of OP-103H. Calculators will also be
provided if the candidate does not have one.
COMMENTS:
3
I
STEP 2: Critical Step
Candidate should complete OP-103H using enclosure 7
UNSAT
STANDARD:
Candidate completes. OP- 103H. Candidate returns materials to you.
EXAMINER CUE:
EXAMINER NOTE:
See attached key for answers;
COMMENTS:
I
END OF TASK
TIME STOP
4
KEY PROCEDURE 103H rev. 3
1.1 100°F
1.2 131 Ft.
1.3 120
1.4 1/12/02
1.5 1/19/02
2.0 7 Days
3.1 1.965
3.2 177/120 = 1.475
3.3 1.965 X 1.475 = 2.898375
4.0 No; the head is off the vessel, and Nozzle dams installed
5.0 No; the head is off the vessel
6.0 No; Nozzle dams installed
7.0 Yes; RCS vented, Head OFF, Nozzle dams installed
7.1 14.21
7.2 120.79
7.3 2.8983 X 14.21 = 41.85 min (40 to 43 minutes tolerance)
7.4 2.8983 X 120.79 = 350.08 min (345 to 355 minutes tolerance)
8.0 No; RCS intact
5
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
Plant is in MODE 6,
RCS temperature is 100F,
RCS pressure 0 psig,
Nozzle dams installed,
RCS vessel level 131 feet.
Refueling in progress, 120 burned fuel assemblies in the core.
Plant was shutdown at 0800 01/12/02
Current date is 0800 01/19/02
Initiating Cues:
You are requested to perform a time to boil / time to core uncovery calculation (OP-103H).
6
CRYSTAL RIVER UNIT 3
ADMINISTRATIVE JOB PERFORMANCE MEASURE
Task: Perform RC Pump Seal Data Sheet.
Alternate Path: N/A
JPM #: A2 (2K2) [BANK #255]
K/A RatinWImportance: 003A4.04 3.1/3.0
Task Number/Position: 0150202001RO
Task Standard: Perform RC Pump Seal Data Sheet, SP-300, enclosure 2.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ In-Plant_ Admin x Perform x Simulate
References:
1. SP-300 Rev. 176
Validation Time: 20 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT - UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Eouipment/Procedures Needed:
1. SP-300
2. Calculator
3.
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the REACTOR OPERATOR.
The plant is at 100% rated thermal power (N766).
Reactor inlet temperature is 557°F (R730).
RC system pressure is 2160 psig (R724).
MUT temperature is 108'F (X208).
Beginning time for seal leak-off was 0800.
Ending time for seal leak-off flow was 1200.
Seal leak-off count at the beginning time for all RCPs was 0.
Seal leak-off count at the ending time: RCP-1A, 110; RCP-1B, 92; RCP-IC, 86; RCP-1D, 120.
Seal injection flow for each pump: RCP-IA, 9 gpm; RCP-1B, 10 gpm; RCP-1C, 9 gpm; RCP
ID, 11 gpm.
All the RCPs have a controlled bleed-off flow rate of 1.5 gpm.
Component cooling water temperature is 79°F (X334).
Initiating Cues:
Given a copy of Group 15, Seal Data, you are directed to perform the RC Pump Seal Data
Sheet in SP-300.
2
START TIME:
I
STEP 1:
Obtain a copy of appropriate procedure. UNSAT___
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
Provide candidate with a copy of the RC Pump Seal Data Sheet in SP-300 and
Group 15 data sheet.
COMMENTS:
3
STEP 2: Critical Step
Complete SP-300 RC Pump Seal Data Sheet
UNSAT
STANDARD:
Candidate will complete the RC Pump Seal Data Sheet and return completed SP to
examiner.
EXAMINER CUE:
EXAMINER NOTE:
If this JPM is conducted in the control room, allow the candidate to collect the
data from plant parameters to show they can find the information. Then
provide the data to complete from the cue sheet. See attached key for answers;
COMMENTS:
END OF TASK
TIME STOP
4
KEY
SP-300 Enclosure 2 page 5
RCS inlet temperature 557OF
RCS Pressure 2160 psig
Rx Power 100%
MUT Temperature 108°F
RCP "A" 110 X .25 / 240 min =. 1145 -.05 = .06 4
RCP "B" 92 X .25 / 240 min = .0958 -.05 = .045
RCP "C" 86 X .25 / 240 min = .0895 -.05 = .039
RCP "D" 120 X .25 / 240 min =. 125 -.05 = .075
5
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the REACTOR OPERATOR.
The plant is at 100% rated thermal power (N766).
Reactor inlet temperature is 557°F (R730).
RC system pressure is 2160 psig (R724).
MUT temperature is 108lF (X208).
Beginning time for seal leak-off was 0800.
Ending time for seal leak-off flow was 1200.
Seal leak-off count at the beginning time for all RCPs was 0.
Seal leak-off count at the ending time: RCP-IA, 110; RCP-1B, 92; RCP-LC, 86; RCP-1D, 120.
Seal injection flow for each pump: RCP-lA, 9 gpm; RCP-1B, 10 gpm; RCP-1C, 9 gpm; RCP-lD, 11
gpm.
All the RCPs have a controlled bleed-off flow rate of 1.5 gpm.
Component cooling water temperature is 79'F (X334).
Initiating Cues:
Given a copy of Group 15, Seal Data, you are directed to perform the RC Pump Seal Data Sheet in
6
CRYSTAL RIVER UNIT 3
ADMINISTRATIVE JOB PERFORMANCE MEASURE
Task: Perform RC Pump Seal Data Sheet.
Alternate Path: N/A
JPM #: A2 (2K2) [BANK #255]
K/A Rating/Importance: 003A4.04 3.1/3.0
Task Number/Position: 0150202001RO
Task Standard: Perform RC Pump Seal Data Sheet, SP-300, enclosure 2.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ In-Plant_ Admin x Perform x Simulate
References:
1. SP-300 Rev. 176
Validation Time: 20 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT - UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Eouinment/Procedures Needed:
1. SP-300
2. Calculator
3.
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the REACTOR OPERATOR.
The plant is at 100% rated thermal power (N766).
Reactor inlet temperature is 557°F (R730).
RC system pressure is 2160 psig (R724).
MUT temperature is 108'F (X208).
Beginning time for seal leak-off was 0800.
Ending time for seal leak-off flow was 1200.
Seal leak-off count at the beginning time for all RCPs was 0.
Seal leak-off count at the ending time: RCP-IA, 110; RCP-1B, 92; RCP-LC, 86; RCP-1D, 120.
Seal injection flow for each pump: RCP-1A, 9 gpm; RCP-1B, 10 gpm; RCP-1C, 9 gpm; RCP
ID, 11 gpm.
All the RCPs have a controlled bleed-off flow rate of 1.5 gpm.
Component cooling water temperature is 79°F (X334).
Initiating Cues:
Given a copy of Group 15, Seal Data, you are directed to perform the RC Pump Seal Data
Sheet in SP-300.
2
START TIME:
STEP 1:
Obtain a copy of appropriate procedure. UNSAT___
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
Provide candidate with a copy of the RC Pump Seal Data Sheet in SP-300 and
Group 15 data sheet.
COMMENTS:
3
STEP 2: Critical Step
Complete SP-300 RC Pump Seal Data Sheet
UNSAT
STANDARD:
Candidate will complete the RC Pump Seal Data Sheet and return completed SP to
examiner.
EXAMINER CUE:
EXAMINER NOTE:
If this JPM is conducted in the control room, allow the candidate to collect the
data from plant parameters to show they can find the information. Then
provide the data to complete from the cue sheet. See attached key for answers;
COMMENTS:
END OF TASK
TIME STOP
4
KEY
SP-300 Enclosure 2 page 5
RCS inlet temperature 557 0 F
RCS Pressure 2160 psig
Rx Power 100%
MUT Temperature 108F
RCP "A" 110 X.25 / 240 min =. 1145 -.05 = .064
RCP "B" 92 X .25 / 240 min = .0958 -.05 = .045
RCP "C" 86 X .25 / 240 min = .0895 -.05 = .039
RCP "D" 120 X .25 / 240 min =. 125 -.05 = .075
5
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the REACTOR OPERATOR.
The plant is at 100% rated thermal power (N766).
Reactor inlet temperature is 557 0 F (R730).
RC system pressure is 2160 psig (R724).
MUT temperature is 108'F (X208).
Beginning time for seal leak-off was 0800.
Ending time for seal leak-off flow was 1200.
Seal leak-off count at the beginning time for all RCPs was 0.
Seal leak-off count at the ending time: RCP-1A, 110; RCP-LB, 92; RCP-lC, 86; RCP-1D, 120.
Seal injection flow for each pump: RCP-1A, 9 gpm; RCP-1B, 10 gpm; RCP-LC, 9 gpm; RCP-ID, 11
gpm.
All the RCPs have a controlled bleed-off flow rate of 1.5 gpm.
Component cooling water temperature is 79 0 F (X334).
Initiating Cues:
Given a copy of Group 15, Seal Data, you are directed to perform the RC Pump Seal Data Sheet in
6
CRYSTAL RIVER UNIT 3
ADMINISTRATIVE JOB PERFORMANCE MEASURE
Task: Comply with station health physics procedures RSPs, HPPs.
Alternate Path: N/A
JPM #: A3 (2K2) [NEW]*
K/A Ratinzfmportance: G2.3.4 / 2.5/3.1
Task Number/Position: 1190104005 /AO, RO, SRO
Task Standard: Using a survey map, and personnel exposures determine stay times and dose
rates using RSP-101 and HPP-300.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ In-Plant_ Admin x Perform x Simulate
References:
1. RSP-101 and HPP-300
Validation Time: 45 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT - UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Euuipment/Procedures Needed:
1. HP-300
2. RSP-101
3. Provided Survey
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
A work platform must be erected over the two letdown coolers inside the RB.
The individual that erects the platform must stand between the two coolers for 45 minutes.
The attached survey 01-10-0127 identifies the dose rates for the letdown room, the attached
sheet provides the data on the individuals that can perform this work
Initiatinig Cues:
For each of the three individuals listed; identify WHY and/or WHY NOT they can perform this
work.
For dose calculations only consider the dose during the 45 minute job, all other doses for
transient and escorts are not to be used.
2
START TIME:
I
STEP 1:
Obtain a copy of appropriate procedure. UNSAT
STANDARD:
Operator obtains copies of HPP-300 and RSP- 101.
EXAMINER CUE:
EXAMINER NOTE:
Provide operator with the pre-marked survey, and the data sheet with each
individual's information.
COMMENTS:
3
STEP 2: Critical Step
Determination of radiation conditions.
UNSAT
STANDARD:
Operator determines that:
SEE ATTACHED KEY
EXAMINER CUE:
EXAMINER NOTE:
Provide Operator with the pre-marked survey.
COMMENTS:
4
STEP 3: Critical Step
Determinations of stay times.
UNSAT
STANDARD:
Operator determines:
SEE ATTACHED KEY
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
END OF TASK
TIME STOP
5
KEY
WORKER HISTORY
Worker #1 John Paul Jones
1. Contract worker with completed NRC form 5
2. This worked is not badged at CR3 so he will be issued dosimetry and escorted (The
escort does not need to be considered for the dose, they will be in a low dose area)
3. 2.0 REM TEDE (from another work location)
Can complete the job in stay time for 1.5 Rem (45 minutes) Would be able to do the
job, limits are the same as other radiation workers (2 REM CR3; total 4)
Worker #2 George Custer
1. CR3 employee with completed NRC form 5 and yellow badge.
CAN NOT do the job, would exceed 2 Rem CR3 dose
Worker #3 Don Corleone
1. Contract worker with completed NRC form 5 and yellow badge.
2. 3.5 Rem TEDE (from another work location)
CAN NOT do the job, would exceed 4 Rem total dose.
NO SPECIAL AUTHORIZATIONS OR EXTENUATING CIRCUMSTANCES ARE
ALLOWED.
6
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
A work platform must be erected over the two letdown coolers inside the RB.
The individual that erects the platform must stand between the two coolers for 45 minutes.
The attached survey 01-10-0127 identifies the dose rates for the letdown room, the attached sheet
provides the data on the individuals that can perform this work
Initiating Cues:
For each of the three individuals listed; identify WHY and/or WHY NOT they can perform this work.
For dose calculations only consider the dose during the 45 minute job, all other doses for transient and
escorts are not to be used.
7
DATA SHEET
WORKER HISTORY
Worker #1 John Paul Jones
1. Contract worker with completed NRC form 5
2. This worked is not badged at CR3 so he will be issued dosimetry and escorted (The
escort does not need to be considered for the dose, they will be in a low dose area)
3. 2.0 REM TEDE (from another work location)
Worker #2 George Custer
1. CR3 employee with completed NRC form 5 and yellow badge.
Worker #3 Don Corleone
1. Contract worker with completed NRC form 5 and yellow badge.
2. 3.5 Rem TEDE (from another work location)
NO SPECIAL AUTHORIZATIONS OR EXTENUATING CIRCUMSTANCES ARE
ALLOWED.
8
CRYSTAL RIVER UNIT 3
ADMINISTRATIVE JOB PERFORMANCE MEASURE
Task: Complete an Off-Site Dose Assessment during Radiological Emergencies (Control
Room Method).
Alternate Path: N/A
JPM #: A4R (2K2) [BANK #306]
K/A Rating/Importance: G 2.3.10 2.9/3.3
Task Number/Position: 0150202001/RO
Task Standard: Complete an Off-Site Dose Assessment during Radiological Emergencies
(Control Room Method), EM-204A
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ In-Plant_ Admin x Perform x Simulate
References:
1. EM-204A Rev 23
Validation Time: 20 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT - UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Eauipment/Procedures Needed:
1. EM-204A
2. Calculator
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the REACTOR OPERATOR.
A Radiological Emergency is in progress.
RM-A2 low-range gas channel reads 6000 cpm.
Initiating Cues:
You are directed to perform EM-204A.
2
START TIME:
I
STEP 1:
Obtain a copy of appropriate procedure.
UNSAAT
STANDARD:
Candidate obtains a copy of EM-204A.
EXAMINER CUE:
EXAMINER NOTE:
Provide candidate with a copy of the EM-204A.
COMMENTS:
3
STEP 2:
Completes EM-204A Enclosure 1.
UNSAT
STANDARD:
Candidate will complete EM-204A; meteorological data may vary per candidate.
EXAMINER CUE:
EXAMINER NOTE:
Each completed procedure will have to be evaluated during and following the
administration of the JPM.
If this JPM is conducted in the control room, allow the candidate to collect the
data from plant parameters to show they can find the information. Then
provide the data to complete from the cue sheet. See attached key for answers;
COMMENTS:
END OF TASK
TIME STOP
4
KEY
EM-204 A
Step 4.1.2 RMA-2 Low range gas channel 6000 cpm
Step 4.2.1 Sigma Theta if in Control Room
Step 4.2.2 Primary tower Delta T -1.50
Step 4.2.3 Wind direction (33') 268
Step 4.2.4 Wind Speed (33') 5.2
Step 4.2.4.1 Wind Speed MPH 11.648
Step 4.2.5 Stability Class A
Step 4.3.1 DDE 4.7 E-02 THYROID 1.3 E-01 TEDE 5.9 E-02
Step 4.4.1 DDE .009 THYROID .025 TEDE .011
Step 4.5.1 Duration of release 1 Hour
Step 4.5.2 DDE .009 THYROID .025 TEDE .011
Step 4.6.1 NOBLE GAS 7.9 E-03 IODINE 7.9 E-05
Step 4.6.2 Affected Sectors DEF
Step 4.7.1 Signature
5
DATA Sheet for completion after data taken at plant indications
EM-204 A
Step 4.1.2 RMA-2 Low range gas channel 6000 cpm
Step 4.2.1 Sigma Theta if in Control Room
Step 4.2.2 Primary tower Delta T -1.50
Step 4.2.3 Wind direction (33') 268
Step 4.2.4 Wind Speed (33') 5.2
6
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the REACTOR OPERATOR.
A Radiological Emergency is in progress.
RM-A2 low-range gas channel reads 6000 cpm.
Initiating Cues:
You are directed to perform EM-204A.
7
CRYSTAL RIVER UNIT 3
ADMINISTRATIVE JOB PERFORMANCE MEASURE
Task: Determine emergency action level for given plant conditions.
Alternate Path: N/A
JPM #: A4S (2K2) [BANK 00-23S]
K/A Rating/Importance: G2.4.41/2.3/4.1
Task Number/Position: 1150101002/SRO
Task Standard: Determine emergency action level for given plant conditions using EM-202.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ In-Plant_ Admin x Perform x Simulate
References:
1. EM-202, Rev. 69
Validation Time: 25 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT _ UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Euuiament/Procedures Needed:
1. EM-202
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the Superintendent of Shift Operations (SSO).
See attached data sheet
Initiating Cues:
Determine the highest emergency action level for the time line data provided. Document your
answer on the first 7 blocks of Enclosure 2 of EM-202 for time 1400 based on the information
provided.
2
At 1300 today the plant was as 100% power, the plant experiences a transient and the following
15 minute time line, of indications occur:
TIME 1315
0'
PRESSURIZER LEVEL
INCORES 370°F
RX BLDG SPRAY FLOW 0 GPM
RX BLDG PRESSURE 45 PSIG
RMG - 29 & 30 9 R/HR
TIME 1330
0"
PRESSURIZER LEVEL
INCORES 370°F
RX BLDG SPRAY FLOW OGPM
RX BLDG PRESSURE 46 PSIG
RMG - 29 & 30 72 R/HR
TIME 1345
0"
PRESSURIZER LEVEL
INCORES 370°F
RX BLDG SPRAY FLOW OGPM
RX BLDG PRESSURE 48 PSIG
RMG - 29 & 30 127 R/HR
TIME 1400
0"
PRESSURIZER LEVEL
INCORES 370°F
RX BLDG SPRAY FLOW OGPM
RX BLDG PRESSURE 47 PSIG
RMG - 29 & 30 245 R/HR
Based on the above information identify the highest EAL.
FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!
3
START TIME:
STEP 1: Critical Step
Candidate determines classification for the data provided.
UNSAT
STANDARD:
Candidate determines the classification:
MATRIX:
FUEL CLAD LOSS FACTOR +4
RCSLOSSFACTOR +4
CONTAINMENT POT LOSS +1.5
TOTAL 9.5
GENERAL EMERGENCY
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
END OF TASK
TIME STOP
4
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the Superintendent of Shift Operations (SSO).
See attached data sheet
Initiating Cues:
Determine the highest emergency action level for the time line data provided. Document your answer on
the first 7 blocks of Enclosure 2 of EM-202 for time 1400 based on the information provided.
5
At 1300 today the plant was as 100% power, the plant experiences a transient and the following
time line of indications occur:
TIME 1315
01.
PRESSURIZER LEVEL
INCORES 370°F
RX BLDG SPRAY FLOW 0 GPM
RX BLDG PRESSURE 45 PSIG
RMG - 29 & 30 9 R/HR
TIME 1330
01"
PRESSURIZER LEVEL
INCORES 370°F
RX BLDG SPRAY FLOW 0 GPM
RX BLDG PRESSURE 46 PSIG
RMG - 29 & 30 72 R/HR
TIME 1345
PRESSURIZER LEVEL 011
INCORES 370°F
RX BLDG SPRAY FLOW 0 GPM
RX BLDG PRESSURE 48 PSIG
RMG - 29 & 30 127 R/HR
TIME 1400
0'"
PRESSURIZER LEVEL
INCORES 370°F
RX BLDG SPRAY FLOW 0 GPM
RX BLDG PRESSURE 47 PSIG
RMG - 29 & 30 245 R/HR
Based on the above information identify the highest EAL.
FOR THIS EXERCISE DO NOT USE ANY EC DISCRETION!
6
ES-3Ol Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2
Facility: Crystal River Unit 3 Date of Examination: 01-28-2002
Exam Level: RO/SRO(I) Operating Test No.: 1
B.1 Control Room Systems
SystemnJPM Title/KA Type Safety
Code* Function
a. CRD - Transfer Control Rod Group 1 to the Auxiliary Power Supply / D, S 1
001K4.03/ 3.5/3.8/ (OP-502)
b. MUP - Perform an Emergency Boration / 024AA2.01/ 3.8/4.1 / (AP-490) N, A, S 2
c. ECCS - Transfer ECCS suction to the RB sump / 009EK3.21/ 4.2/4.5 D, S 3
(EOP-14 Enclosure 19)
d. AFW - Emergency Feedwater Management/ E14.EA1.3/ 3.6/3.8 / (EOP-14 D, A, S 4
Enclosure 7)
e. BS - Ensure BS actuation / 026A3.01/ 4.3/4.5 / (EM-225C) D, A, S 5
f. RPS - Energize RPS Channel/ 012A2.02/ 3.6/3.9 / (OP-507) D, S 7
g. RM - Adjust RM-L2 setpoints for release/ 059AAI.01/ 3.5/3.5 / (OP-505) NLS 9
B.2 Facility Walk-Through
a. VITAL ELEC - Energize VBIT-lA and supply the vital bus / 062A4.07/ N 6
3.1/3.1 / (OP-703)
b. FS/OTSG - Transfer contaminated secondary inventory to FST/ D 8
037AK3.07/ 4.2/4.4 / (EOP-14 Enclosure 9)
c. WG - Perform a Waste Gas release / G2.3.11/2.7/3.2 / (OP-412B) D, A, R 9
- Type Codes: (D)irect, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator,
(L)ow-Power, (R)CA, **PRA High System Importance
ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2
Facility: Crystal River Unit 3 Date of Examination: 01-28-2002
Exam Level: SRO(U) Operating Test No.: 1
B.1 Control Room Systems
SystemIJPM Title/KA Type Safety
Code* Function
a. MUP - Perform an Emergency Boration / 024AA2.01/ 3.8/4.1 / (AP-490) N, A, S 2
b. ECCS - Transfer ECCS suction to the RB sump / 009EK3.21/ 4.2/4.5 D, S 3
(EOP-14 Enclosure 19)
c. CRD - Transfer Control Rod Group 1 to the Auxiliary Power Supply / D, S 1
001K4.03/ 3.5/3.8/ (OP-502)
B.2 Facility Walk-Through
a. FS/OTSG - Transfer contaminated secondary inventory to FST/ D 8
037AK3.07/ 4.2/4.4 / (EOP-14 Enclosure 9)
b. WG - Perform a Waste Gas release / G2.3.11/2.7/3.2 / (OP-412B) D, A R 9
- Type Codes: (D)irect, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator,
(L)ow-Power, (R)CA, **PRA High System Importance
CRYSTAL RIVER UNIT 3
SIMULATOR JOB PERFORMANCE MEASURE
Task: Transfer a group of control rods to the Auxiliary Power Supply
Alternate Path: N/A
JPM#: BlA (2K2) [BANK #43]
K/A Ratine/Importance: 001A4.03/4.0/3.7
Task Number/Position: 0010102010 / RO/SRO
Task Standard: Transfer a group of control rods to the Auxiliary Power Supply by using OP
502, Control Rod Drive System, Section 4.16, Transferring a Group or Rod
to the Auxiliary Power Supply.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator x In-Plant_ Admin __ Perform x Simulate
References:
1. OP-502 Rev. 45
Validation Time: 15 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. Alarm override Deaerator level (1500)
SIMULATOR OPERATOR INSTRUCTIONS:
I. Any power IC #11
2
Tools/Equipment/Procedures Needed:
1. OP-502 Rev. 45
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the Reactor Operator, the plant is stable at power, Control Rod surveillance is in
progress.
Initiating Cues:
You are requested to transfer group 3 rods to the Auxiliary Power Supply. Following transfer of
the group, leave the reactor diamond and demand stations in manual for further manipulations.
3
START TIME:
STEP 1:
Obtain a copy of appropriate procedure.
UNSAT
STANDARD:.
Candidate obtains a copy of OP-502.
EXAMINER CUE:
For purposes of this JPM assume the CRS concurs with each rod manipulation.
EXAMINER NOTE:
COMMENTS:
4
STEP 2: (Step 4.16.1) Critical Step
CAUTION: Tave control could go to Feedwater regulation.
UNSAT
Place Reactor Diamond in MANUAL.
DEPRESS "MANUAL"
VERIFY "MANUAL" light on, " AUTO." light is off
STANDARD:
Operator depresses the Diamond Panel MANUAL pushbutton, and observes the
MANUAL light ON and the AUTO light OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
5
STEP 3: (Step 4.16.2) Critical Step
Place Reactor Demand control station in Hand. SAT
DEPRESS HAND
VERIFY "REACTOR DEMAND" in Mini Track ("AUTO." and UNSAT
"HAND" lights on)
STANDARD:
Operator depresses the HAND pushbutton on the Reactor Demand (Bailey)
HAND/AUTO station and observes that both the HAND and AUTO lights are
"ON".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
6
STEP 3: (Step 4.16.3) Critical Step
Select GROUP SELECT Switch to desired group. SAT
UNSAT
STANDARD:
Operator verifies that GROUP SELECT Switch is selected to Group 3.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
7
STEP 4: (Step 4.16.4) Critical Step
Select ALL or desired rod. Use SINGLE SELECT Switch.
UNSAT
STANDARD:.
Operator verifies that SINGLE SELECT Switch is selected to all.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
8
step
STEP 5: (Step 4.16.5) Critical Step
Select SEQ OR. Verify SEQ OR light "ON", SEQ light "ON".
UNSAT
STANDARD:.
Operator depresses the SEQ/SEQ OR pushbutton and verifies both lights "ON".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
9
STEP 6: (Step 4.16.6) Critical Step
Select AUXIL.
UNSAT
STANDARD:.
Operator depresses the AUXIL/GROUP pushbutton and verifies AUXIL light
"ON" and GROUP light "OFF". VERIFY control on light for GP 3 is "ON".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
10
STEP 7: (Step 4.16.7) Critical Step
Place SPEED SELECTOR switch in JOG.
UNSAT
STANDARD:
Operator rotates RUN/JOG switch to JOG and verify SY light "ON".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
11
STEP 8: (Step 4.16.8) Critical Step
Select CLAMP.
UNSAT
STANDARD:
Operator depresses CLAMP/CLAMP RELEASE pushbutton and verifies
CLAMP light "ON" and CLAMP REL light "OFF".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
12
STEP 9: (Step 4.16.9) Critical Step
CAUTION: If Amber control ON lights for more than one group is ON,
STOP, and notify CRS.
UNSAT
Depress MAN TRANS.
STANDARD:
Operator depresses MAN TRANS pushbutton and verifies TR CF light "ON".
The operator will also verify the amber CONTROL ON light for group 3 is "ON".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
13
STEP 10: (Step 4.16.10) Critical Step
Select CLAMP REL.
UNSAT
STANDARD:
Operator depresses CLAMP/CLAMP RELEASE pushbutton and verifies
CLAMP REL light "ON" and CLAMP light "OFF".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
14
STEP 11: (Step 4.16.11) Critical Step
Select GROUP
UNSAT
STANDARD:
Operator depresses GROUP/AUXIL pushbutton and verifies GROUP light "ON"
and AUXIL light "OFF". The operator will also verify the SY light "OFF".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
15
STEP 12: (Step 4.16.12) Critical Step
If latching Safety Rods in accordance with section 4.2, return to Section 4.2.3
after completion of this step
UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
16
STEP 13: (Step 4.16.13) Critical Step
Place SPEED SELECTOR switch in RUN.
UNSAT
STANDARD:
Operator rotates RUN/JOG switch to RUN, observes the white (Diamond panel)
"CONTROL ON" light for group 3 is "ON", and the amber (PI panel)
"CONTROL ON" lights for rod group 3 rods is "ON".
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
17
18
STEP 15: (Step 4.16.15) Critical Step
Restore GROUP SELECT Switch. Place GROUP SELECT Switch to OFF.
UNSAT
STANDARD:
Operator rotates GROUP SELECT switch to OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
19
STEP 16: (Step 4.16.16) Critical Step
NOTE: When in "SEQ" the Control ON lamp and Amber Control ON
lamps are on for rods on the Aux Power Supply and controlling rod group
(Usually group 7)
UNSAT
Select SEQ. Verify SEQ light "ON" and SEQ OR light "OFF".
STANDARD:
Operator depresses SEQ/SEQ OR pushbutton and verifies SEQ light "ON" and
SEQ OR light "OFF".
EXAMINER CUE:
You have transferred group 3 rods to the Auxiliary Power Supply; the JPM is
complete.
EXAMINER NOTE:
COMMENTS:
TIME STOP
20
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the Reactor Operator, the plant is stable at power, Control Rod surveillance is in progress..
Initiating Cues:
You are requested to transfer group 3 rods to the Auxiliary Power Supply. Following transfer of
the group, leave the reactor diamond and demand stations in manual for further manipulations.
21
CRYSTAL RIVER UNIT 3
SIMULATOR JOB PERFORMANCE MEASURE
Task: Borate the RCS to ensure >1% SDM 730
System: Chemical Addition
Alternate Path: Yes
JPM#: BiB (2K2) [NEW]
K/A Rating/Importance: 024AA1.17/3.9/3.9
Task Number/Position: 1150502013 / RO
Task Standard: Perform an emergency boration in accordance with AP-490
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator x In-Plant_ Admin .__ Perform x Simulate
References:
1. AP-490 Rev. 3
Validation Time: 15 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT - UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. Dropped rod IC # 64
2. CAV-60 is failed where it will not open as part of the IC
3.
4. Alarm override hotwell level (0092 ; 0094)
5.
SIMULATOR OPERATOR INSTRUCTIONS:
2
Tools/EuuiDment/Procedures Needed:
1. AP-490
2.
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
The plant has experienced a dropped rod. After completion of SP-42 1, SDM is less than 1%
delta K/K which places the plant in LCO 3.1.1
Initiating Cues:
Initiate boration to restore SDM within limits.
3
START TIME:
STEP 1:
Obtain a copy of appropriate procedure.
UNSAT
STANDARD:
Candidate obtains a copy of AP-490
EXAMINER NOTE:
COMMENTS:
4
STEP 2: (step 3.1)
IF entry into this procedure was directed by an EOP, THEN GO TO Step 3.17
in this procedure.
UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
5
STEP 3: (step 3.2)
IF at any time, in Modes 3 through 5, AND an unacceptable increase in neutron
flux exists, THEN ensure Rx is tripped.
UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
6
STEP 4: (step 3.3)
IF in Mode 6, THEN stop core alterations and positive reactivity changes.
UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
7
STEP 5: (step 3.4)
IF RB is occupied, THEN evacuate RB.
UNSAT
STANDARD:
N/A
EXAMINER CUE:
RB is unoccupied.
EXAMINER NOTE:
COMMENTS:
8
STEP 6: (step 3.5)
Notify personnel of entry into AP-490
UNSAT
PA announcement
SSO (evaluate plant conditions for potential entry into the Emergency Plan)
Reactor Engineer
Chemistry (to sample RCS boron)
STANDARD:
Perform announcement on the PA, all others are understood as complete.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
9
STEP 7: (step 3.6)
IF RCS cooldown is in progress, THEN stop cooldown.
UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
10
STEP 8: (step 3.7)
Stop any deborations in progress.
UNSAT
STANDARD:
N/A
EXAMINER CUE:
No deborations are in progress
EXAMINER NOTE:
If student ask: MU demin 1A has been in service for the last 100 days
COMMENTS:
11
STEP 9: (step 3.8)
IF in Mode 5, OR 6, THEN GO TO Step 3.25 in this procedure.
UNSAT
STANDARD:
N/A
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
12
13
STEP 11: (step 3.10) Critical Step
Initiate RCS boration from BAST.
UNSAT
1. Open CAV-60
2. IF CAV-60 is NOT available, THEN PERFORM Enclosurel, Operation of
the Batch Controller, in this procedure.
STANDARD:
1. CAV-60 fails to open
2. Perform Enclosure 1
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
14
STEP I la: (step 1.1) Critical Step
Adjust batch controller for feed.
UNSAT
1. Depress "STOP"
2. Depress "BATCH SET"
3. Enter 1200 gallons and depress "ENTER"
4. Depress upper "DISPLAY" to exit the Batch Set Mode
5. Depress "TOTAL" and verify "TOT GAL" is displayed.
STANDARD:
Operate batch controller as directed in procedure steps
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
15
STEP I lb: (step 1.2) Critical Step
Ensure MUV-108 demand is set to "0%" (closed).
UNSAT
1. Depress "VALVE SET"
2. Depress "VALVE CE"
3. Ensure the entered value for MUV-108 is "0%" (closed):
4. Depress "0"
5. Depress "ENTER"
6. Depress "RUN"
STANDARD:
Operate batch controller as directed in procedure steps
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
16
STEP lIc: (step 1.3) Critical Step
Select "FEED SELECTOR SW." to BAST and pull handle up.
UNSAT
STANDARD:
Rotate switch to BAST and pull "UP"
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
17
I STEP lId: (step 1.4) Critical Step
Open CAV-57
UNSAT
STANDARD:
Rotate switch and observe the valve "OPENS"
EXAMINER CUE:
I EXAMINER NOTE:
COMMENTS:
18
19
STEP I1 f: (step 1.6) Critical Step
Prepare batch controller for boration.
UNSAT
1. Set MUV-108 to 100% in batch controller and depress "ENTER"
2. Depress lower "DISPLAY"
3. Depress "RATE" and verify "RATE GPM" is shown.
STANDARD:
Operate batch controller as directed in procedure steps
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
20
STEP 12g: (step 1.7)
EXIT this enclosure. Return to step 3.11.
UNSAT
STANDARD:
Return to Step 3.11
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
21
STEP 12: (step 3.11) Critical Step
Ensure all available CAPs are running.
CAP-IA UNSAT
CAP-1B
STANDARD:
Rotate pump start switches to start and observe both pumps start
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
22
STEP 13: (step 3.12) Critical Step
Ensure post-filter bypass valve is open.
Open MUV- 100 UNSAT
STANDARD:
Rotate switch and observe the valve "OPENS"
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
23
STEP 14: (step 3.13)
Determine boration flow rate.
Determine flow rate using any of the following: UNSAT
MUT level (30.8 gal/in)
Computer point X359 for MUT level (30.8 gal/in)
Computer point X201 for A BAST level
See OP-103F, Tank Volumes, Figure 7
Computer point X204 for B BAST level
See OP-103F, Tank Volumes, Figure 7
Batch controller
STANDARD:
Verify batch controller flow is >10 gpm
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
24
TIME STOP
25
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
The plant has experienced a dropped rod. After completion of SP-42 1, SDM is less than 1% delta K/K
which places the plant in LCO 3.1.1
Initiating Cues:
Initiate boration to restore SDM within limits.
26
CRYSTAL RIVER UNIT 3
SIMULATOR JOB PERFORMANCE MEASURE
Task: Perform ECCS Suction Transfer
Alternate Path: N/A
JPM#: BIC (2K2) [BANK 00-05]
K/A Rating/Importance: 009EK3.21/4.2/4.5
Task Number/Position: 0050502005/RO
Task Standard: While aligning DHR the BWST decreases below 15 ft, perform ECCS
Suction Transfer using EOP-14 Enclosure 19.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator x In-Plant Admin ___ Perform x Simulate
References:
1. EOP-14 Enclosure 19, Rev. 8
Validation Time: 15 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. BWST level is 19 feet
2. Acknowledge subcooling margin alarm.
3. IC # 65
4. Alarm override MUT level High/Low (1065), and Hotwell level (0094) both done in IC
SIMULATOR OPERATOR INSTRUCTIONS:
1. Booth operator will take the roles for the various operators
2
Tools/EauiDment/Procedures Needed:
1. EOP-14, Enclosure 19
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the REACTOR OPERATOR.
A LOCA has occurred.
Cooldown is in progress using EOP-08
BWST level is 19 feet.
Initiating Cues:
You are requested to transfer suction for both ECCS trains in accordance with EOP-14,
Enclosure 19.
3
START TIME:
STEP 1: Critical Step
Obtain a copy of appropriate procedure.
STANDARD: UNSAT
Candidate obtains a copy of EOP- 14 enclosure 19.
EXAMINER NOTE:
When candidate demonstrates they can locate procedure then hand them
Enclosure 19 of EOP-14.
COMMENTS:
4
STEP 2: (step 19.1 of EOP-14 enclosure 19) Critical Step
PROCEDURE CAUTION: DHV-34 AND DHV-35 must be closed prior to
BWST level < 7ft. SAT
UNSAT
If 1 LPI pump is aligned for DHR, then go to step 19.17 in this enclosure.
STANDARD:
Candidate continues to step 19.2.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
5
STEP 3: (step 19.2) Critical Step
Ensure at least 1 train of LPI is properly aligned.
1. BWST to DHP valves open: UNSAT
A Train B Train
DHV-34 DHV-35
2. LPI pumps and required cooling water pumps operating:
A Train B Train
DCP-1A DCP-lB
RWP-3A RWP-3B
DHP-lA DHP-1B
[Rule 5, EDG Control]
3. DHP isolation valves open:
A Train B Train
DHV-210 DHV-211
4. LPI injection valves open:
A Train B Train
DHV-5 DHV-6
STANDARD:.
Candidate verifies DHV-34 and DHV-35 are open by red light ON and green
light OFF for each valve. Candidate verifies DCP-1A, RWP-3A, DHP-lA, DCP
IB, RWP-3B, and DHP- 1B are running by red light ON and green light OFF for
each pump. Candidate verifies DHV-210 and DHV-211 are open by red light ON
and green light OFF for each valve. Candidate verifies DHV-5 and DHV-6 are
open by red light ON and green light OFF for each valve.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
6
STEP 4: (step 19.3) Critical Step
Adjust LPI control valve setpoint for RB sump operation.
While observing for proper control, adjust LPI control valve setpoint to 2000 UNSAT
gpm:
A Train B Train
DHV-110 DHV- 111
STANDARD:
Candidate adjusts thumb wheels of DHV- 110 and DHV- 111 to 2000 gpm and
verifies flow follows.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
7
STEP 5: (step 19.4) Critical Step
When BWST level is < 15 ft, then adjust BS for RB sump operation. UNSAT
Select 1200 gpm and LOCAL for BSP discharge valves:
A Train B Train
BSV-3 BSV-4
STANDARD:
Candidate selects BSV-3 and BSV-4 control stations to REMOTE/LOCAL
switch to LOCAL.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
8
STEP 6: (step 19.5) Critical Step
Align LPI pump discharge to MUP suction.
If DHP- 1A is running, then open DHV- 11 UNSAT
IF DHP-LB is running, the open DHV-12
STANDARD:.
Candidate rotates control switches for DHV-1 1 and DHV-12 to open and verifies
for each valve red light ON and green light OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
9
STEP 7: (step 19.6) Critical Step
PROCEDURE CAUTION: Aligning ECCS to RB sump may cause high
radiation in AB.
UNSAT
Align ECCS pump suction to RB sump.
A Train B Train
DHV-42 DHV-43
STANDARD:.
Candidate rotates control switches for DHV-42 and DHV-43 to open and verifies
for each valve red light ON and green light OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
10
STEP 8: (step 19.7) Critical Step
UNSAT
Isolate BWST from LPI.
Close BWST to DHP valves:
A Train B Train
DHV-34 DHV-35
STANDARD:.
Candidate rotates control switches for DHV-34 and DHV-35 to close and verifies
for each valve green light ON and red light OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
END OF TASK
TIME STOP
11
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the REACTOR OPERATOR.
A LOCA has occurred.
Cooldown is in progress using EOP-08
BWST level is 19 feet.
Initiating Cues:
You are requested to transfer suction for both the ECCS trains in accordance with EOP-14, Enclosure 19.
12
CRYSTAL RIVER UNIT 3
SIMULATOR JOB PERFORMANCE MEASURE
Task: Perform ECCS Suction Transfer
Alternate Path: N/A
JPM#: BIC (2K2) [BANK 00-05]
K/A Rating/Importance: 009EK3.21/4.2/4.5
Task Number/Position: 0050502005/RO
Task Standard: While aligning DHR the BWST decreases below 15 ft, perform ECCS
Suction Transfer using EOP-14 Enclosure 19.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator x In-Plant_ Admin __ Perform x Simulate
References:
1. EOP-14 Enclosure 19, Rev. 8
Validation Time: 15 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance RatinE: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. BWST level is 19 feet
2. Acknowledge subcooling margin alarm.
3. IC # 65
4. Alarm override MUT level High/Low (1065), and Hotwell level (0094) both done in IC
SIMULATOR OPERATOR INSTRUCTIONS:
1. Booth operator will take the roles for the various operators
2
Tools/Eauipment/Procedures Needed:
1. EOP-14, Enclosure 19
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the REACTOR OPERATOR.
A LOCA has occurred.
Cooldown is in progress using EOP-08
BWST level is 19 feet.
Initiating Cues:
You are requested to transfer suction for both ECCS trains in accordance with EOP-14,
Enclosure 19.
3
START TIME:
STEP 1: Critical Step
Obtain a copy of appropriate procedure.
STANDARD: UNSAT.
Candidate obtains a copy of EOP-14 enclosure 19.
EXAMINER NOTE:
When candidate demonstrates they can locate procedure then hand them
Enclosure 19 of EOP-14.
COMMENTS:
4
STEP 2: (step 19.1 of EOP-14 enclosure 19) Critical Step
PROCEDURE CAUTION: DHV-34 AND DHV-35 must be closed prior to
BWST level < 7ft. SAT
UNSAT
If 1 LPI pump is aligned for DHR, then go to step 19.17 in this enclosure.
STANDARD:
Candidate continues to step 19.2.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
5
STEP 3: (step 19.2) Critical Step
Ensure at least 1 train of LPI is properly aligned.
1. BWST to DHP valves open: UNSAT
A Train B Train
DHV-34 DHV-35
2. LPI pumps and required cooling water pumps operating:
A Train B Train
DCP-1A DCP-1B
RWP-3A RWP-3B
DHP-LA DHP-1B
[Rule 5, EDG Control]
3. DHP isolation valves open:
A Train B Train
DHV-210 DHV-211
4. LPI injection valves open:
A Train B Train
DHV-5 DHV-6
STANDARD:.
Candidate verifies DHV-34 and DHV-35 are open by red light ON and green
light OFF for each valve. Candidate verifies DCP-1A, RWP-3A, DHP-LA, DCP
lB, RWP-3B, and DHP-1B are running by red light ON and green light OFF for
each pump. Candidate verifies DHV-210 and DHV-211 are open by red light ON
and green light OFF for each valve. Candidate verifies DHV-5 and DHV-6 are
open by red light ON and green light OFF for each valve.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
6
STEP 4: (step 19.3) Critical Step
Adjust LPI control valve setpoint for RB sump operation.
While observing for proper control, adjust LPI control valve setpoint to 2000 UNSAT
gpm:
A Train B Train
DHV-110 DHV-1I1
STANDARD:
Candidate adjusts thumb wheels of DHV- 110 and DHV- 111 to 2000 gpm and
verifies flow follows.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
7
STEP 5: (step 19.4) Critical Step
When BWST level is < 15 ft, then adjust BS for RB sump operation. UNSAT
Select 1200 gpm and LOCAL for BSP discharge valves:
A Train B Train
BSV-3 BSV-4
STANDARD:
Candidate selects BSV-3 and BSV-4 control stations to REMOTE/LOCAL
switch to LOCAL.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
8
STEP 6: (step 19.5) Critical Step
Align LPI pump discharge to MUP suction.
If DHP- 1A is running, then open DHV- 11 UNSAT
IF DHP-1B is running, the open DHV-12
STANDARD:.
Candidate rotates control switches for DHV-1 1 and DHV-12 to open and verifies
for each valve red light ON and green light OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
9
STEP 7: (step 19.6) Critical Step
PROCEDURE CAUTION: Aligning ECCS to RB sump may cause high
radiation in AB.
UNSAT
Align ECCS pump suction to RB sump.
A Train B Train
DHV-42 DHV-43
STANDARD:.
Candidate rotates control switches for DHV-42 and DHV-43 to open and verifies
for each valve red light ON and green light OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
10
STEP 8: (step 19.7) Critical Step
UNSAT
Isolate BWST from LPI.
Close BWST to DHP valves:
A Train B Train
DHV-34 DHV-35
STANDARD:.
Candidate rotates control switches for DHV-34 and DHV-35 to close and verifies
for each valve green light ON and red light OFF.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
END OF TASK
TIME STOP
11
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the REACTOR OPERATOR.
A LOCA has occurred.
Cooldown is in progress using EOP-08
BWST level is 19 feet.
Initiating Cues:
You are requested to transfer suction for both the ECCS trains in accordance with EOP-14, Enclosure 19.
12
CRYSTAL RIVER UNIT 3
SIMULATOR JOB PERFORMANCE MEASURE
Task: Comply with EOP rules & enclosures (EOP-13, EOP-14)
Alternate Path: YES
JPM #: Bid (2K2) [BANK #291]
K/A Rating/Importance: E14.EA1.3 / 3.6/3.8
Task Number/Position: 1150502012 / RO
Task Standard: Comply with EOP rules & enclosures (EOP-13, EOP-14); IAW Enclosure 7
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator x In-Plant_ Admin Perform x Simulate
References:
1. EOP-14; Enclosure 7 Rev. 8
Validation Time: 15 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. Red Tag EFP-3 is red tagged OOS for maintenance
2. EFP-2 Tripped on overspeed when it started
3. EFP-1 in PTL
This JPM is without EFP-2/3 pumps and a LOOP that requires feeding with AFW.
SIMULATOR OPERATOR INSTRUCTIONS:
1. IC# 66
The IC does all of the evolutions with the exception of red tagging EFP-3.
2
Tools/Euuipment/Procedures Needed:
1. EOP-14; Enclosure 7
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
A Loss of Offsite Power has occurred, EFP-3 is red tagged for air start system repair. The
CRS is progressing through the EOP's for the plant conditions.
Initiating Cues:
You are the Reactor Operator and the CRS tells you to perform EOP-14; Enclosure 7.
3
START TIME:
STEP 1:
Obtain a copy of appropriate procedure.
STANDARD:. UNSAT
Candidate obtains a copy of EOP-14; Enclosure 7 Rev. 8
EXAMINER NOTE:
COMMENTS:
4
STEP 2: (Step 7.1)
Verify EFP-3 is running.
UNSAT
IF EFP-3 is NOT running, THEN GO TO Step 7.5 in this enclosure.
STANDARD:
The operator identifies the red tag on EFP-3 and the pump start switch is in PTL.
EFP-3 OOS alarm is actuated.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
5
STEP 3: (step 7.5)
Verify EFP-2 is running.
UNSAT
IF EFP-2 is NOT running, THEN GO TO Step 7.7 in this enclosure.
STANDARD:.
The operator observes that EFP-2 is not available, no flow is indicated, and
alarms for EFP-2 (Start Fail and Trip) are actuated.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
6
STEP 4: (step 7.7)
IF EDG A is supplying power to A ES 4160V Bus, THEN GO TO Step 7.13 in
this enclosure.
UNSAT
STANDARD:.
Verify the "A" EDG carrying the "A" ES 4160 V bus, observe the 3209 breaker is
closed and load is displayed on the Kw meter.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
7
STEP 5: (step 7.13)
Verify AFW is available.
FWP-7 UNSAT
CDT-I level > 9 ft
IF AFW is NOT available, THEN GO TO Step 7.19 in this enclosure.
STANDARD:
FWP-7 is available, no tags or initial conditions to the contrary. Verify CDT
level using MCB (CD-67-L12) indications.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
8
STEP 6: (step 7.14)
Verify 4160 Volt Reactor Aux Bus 3 is energized.
UNSAT
IF 4160 Volt Reactor Aux Bus 3 is NOT energized, THEN energize 4160
Volt Reactor Aux Bus 3
Open Bkr 3223
Select MTDG- 1 to "RUN"
Verify "MTDG- 1 "READY" light (red) is lit.
Close Bkr 3225
Verify 4160 Volt Reactor Aux Bus 3 voltage is stable.
STANDARD:.
The candidate should locate the Rx Aux Bus and verify that the Rx Aux Bus 3 is
de-energized, by observing no voltage on the bus.
EXAMINER CUE:
EXAMINER NOTE:
This now becomes an alternate path JPM; The alternate path steps are broken out on
the next five sub steps (6a through 6e).
COMMENTS:
9
STEP 6a: (Step 7.14) Continued
Open Breaker 3223
UNSAT
EXAMINER NOTE:
STANDARD:
Locate Breaker 3223 control handle, rotate breaker 3223 control handle to the
OPEN position, and observe breaker red light goes out and green light comes on
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
10
STEP 6b: (Step 7.14) Continued Critical Step
Select MTDG- 1 to "RUN".
UNSAT
STANDARD:
Locate MTDG- I control switch and rotate MTDG- 1 control switch to "RUN"
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
11
STEP 6c: (Step 7.14) Continued
Verify "MTDG- 1 "READY" light (red) is lit.
UNSAT
STANDARD:
Observe MTDG- 1 "READY" light (red) comes on
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
12
STEP 6d: (Step 7.14) Continued Critical Step
Close Breaker 3225
UNSAT
STANDARD:
Locate breaker 3225 control handle, rotate breaker 3225 control handle to the
CLOSED position, and observe voltage on the bus.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
13
STEP 6e: (Step 7.14) Continued
Verify 4160 Volt Reactor Aux Bus 3 voltage is stable.
UNSAT
STANDARD:
Observe stable voltage
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
14
STEP 7: (Step 7.15)
IF EFP-2 is running, THEN ensure EFW control valves are closed.
UNSAT
STANDARD:
The operator observes that EFP-2 is not available, no flow is indicated, and
alarms for EFP-2 show the pump is OOS.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
15
STEP 8: (Step 7.16) Critical Step
Establish AFW flow to each available OTSG.
FWV-216 UNSAT
FWV-217
Start FWP-7
STANDARD:
Verify that FWV-216 / 217 are closed, observe the valve controllers set to zero
and the flow indication is zero.
Locate FWP-7 control handle and rotate CW to start, verify current increase and
the red running light ON.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
16
STEP 8a: (Step 7.16) Continued Critical Step
Estabi ish EFW flow to each available OTSG.
UNSAT
IF adequate SCM exists, AND OTSG level is * 121/2 in, THEN feed each
available dry OTSG with continuous AFW flow within the following limits:
Cooldown rate minimized
See Table 2
Flow rate < 300 gpm to each dry OTSG
STANDARD:
Monitor RCS parameters using SPDS indications and/or Alpha pages of SPDS.
Review table 2, and when flow is established feed at a rate of < 300 gpm. IF
OTSG IS NOT DRY THIS IS N/A!!!
EXAMINER CUE:
EXAMINER NOTE:
The OTSG may or may not be DRY depending on the simulator setup for this JPM.
If this step is not appropriate then this step is NOT CRITICAL!
COMMENTS:
17
STEP 8b: (Step 7.16) Continued Critical Step
IF adequate SCM exists, AND OTSG level is > 121/22 in, THEN ensure AFW flow
is controlled.
[Rule 3, EFW/AFW Control] UNSAT
STANDARD:
Control FWV-216, and FWV-217 to feed OTSG(s) in a controlled manner, lAW
rule 3.
IF adequate SCM does NOT exist,
THEN feed available OTSGs at inadequate SCM flow rate.
[Rule 3, EFW/AFW Control]
STANDARD:
N/A, SCM exists for this JPM.
EXAMINER CUE:
When flow is established with FWP-7 this JPM is complete.
EXAMINER NOTE:
COMMENTS:
TIME STOP
18
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
A Loss of Offsite Power has occurred, EFP-3 is red tagged for air start system repair. The CRS is
progressing through the EOP's for the plant conditions.
Initiating Cues:
You are the Reactor Operator and the CRS tells you to perform EOP-14; Enclosure 7.
19
CRYSTAL RIVER UNIT 3
SIMULATOR JOB PERFORMANCE MEASURE
Task: Ensure Building Spray (BS) actuation.
Alternate Path: BSP-1A will have a shaft shear when started.
JPM#: B1E (2K2) [BANK 00-04]
K/A Rating/Importance: 026A3.01/4.3/4.5
Task Number/Position: 0260502001/RO
Task Standard: Initiate Building Spray for high Reactor Building temperature using EM
225C.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator x In-Plant_ Admin __ Perform x Simulate
References:
1. EM-225C, Rev 2
Validation Time: 7 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance RatinE: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. Description: A LOCA is in progress; Reactor Building pressure is < 30 psig; the BWST
level is > 20 ft.
2. IC # 67
3. Acknowledge SCM alarm.
4. BSP-1A shaft shears, must start BSP-lB this is done in the IC
5. Check CRTs to ensure RB temperatures (if displayed) are high
SIMULATOR OPERATOR INSTRUCTIONS:
1. Booth operator will take the roles for the various operators for notifications.
2
Tools/Eauivment/Procedures Needed:
1. EM-225C
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
You are the REACTOR OPERATOR.
A LOCA is in progress.
Reactor Building (RB) temperatures are high.
The Emergency Coordinator (EC) has given concurrence to start Building Spray to reduce RB
temperatures.
Initiating Cues:
You are requested to start Building Spray (BSP- 1A preferred) per section 4.6 of EM-225C.
3
START TIME:
STEP 1:
Obtain a copy of appropriate procedure.
STANDARD:. UNSAT
Candidate obtains a copy of EM-225C.
EXAMINER NOTE:
When candidate demonstrates they can locate procedure then hand them EM
225C.
COMMENTS:
4
STEP 2: (step 4.6)
If a building spray pump is required and EC concurrence has been obtained, then
perform the following:
UNSAT
STANDARD:
Candidate performs the following steps.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
5
STEP 3: (step 4.6. 1)
Ensure load is available on the emergency diesel generators per EOP-13, Rule 5.
UNSAT
STANDARD:.
N/A, the emergency diesel generators are not running.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
6
STEP 4: (step 4.6.2) Critical Step
Ensure Building Spray flow controls are set at 1500 gpm and REMOTE if pumps
are aligned to BWST, or 1200 gpm and LOCAL if aligned to the RB sump.
UNSAT
STANDARD:
Candidate verifies suction source to Building Spray pumps and ensures the
REMOTE/LOCAL lever on BSV-3 and BSV-4 is set to REMOTE and the 1500
gpm.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
7
STEP 5: (step 4.6.3) Critical Step
Notify the control room to start one building spray pump.
UNSAT
STANDARD:
Candidate rotates the control handle for BSP-1A to the start position and notes
that the pump did not start (shaft shear, low amps, no flow, red light ON and
green light OFF). Pump start failure is reported to Control Room Supervisor
(CRS). Candidate repeats the guidance of EM-225C section 4.6 to start BSP-1B
(some of the required steps may have been performed in parallel with BSP- IA
alignment).
EXAMINER CUE:
(If required) the TSC requests you start Building Spray.
EXAMINER NOTE:
Role-play as Control Room Supervisor (CRS) when candidate discovers
problem with BSP-1A. Direct candidate to establish Building Spray with the
"B" train. (Once BSP-1B is started the JPM is complete.)
COMMENTS:
TIME STOP
8
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the REACTOR OPERATOR.
A LOCA is in progress.
Reactor Building (RB) temperatures are high.
The Emergency Coordinator (EC) has given concurrence to start Building Spray to reduce RB
temperatures.
Initiating Cues:
You are requested to start Building Spray (BSP- 1A preferred) per section 4.6 of EM-225C.
9
CRYSTAL RIVER UNIT 3
SIMULATOR JOB PERFORMANCE MEASURE
Task: Set radiation monitor warning and high alarm setpoints.
System: Rad Monitoring
Alternate Path: No
JPM#: BiG(2K2) [NEW]
K/A Rating/Importance: 073A4.03 3.7/3.7
Task Number/Position: 0720102001/RO
Task Standard: Reset alarm setpoints for liquid release
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator x In-Plant Admin __ Perform x Simulate
References:
1. OP-505 Rev 18
Validation Time: 7 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT - UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. OP-505
2. Ensure Setpoints are reset prior to performing JPM
3. Initial Settings:
WARNING 1.00 E3
HIGH 1.00 E5
They do not reset when the simulator resets!!!
4.
5. IC # 11, or any IC will work.
SIMULATOR OPERATOR INSTRUCTIONS:
2
Tools/EauiDment/Procedures Needed:
1. OP-505
2.
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be performed for this JPM. I will provide initiating cues and
reports on other actions when directed by you. Ensure you indicate to me when you understand
your assigned task. To indicate that you have completed your assigned task, return the handout
sheet to the examiner.
Initial Conditions:
The plant is lining up to perform a liquid release
Initiatin2 Cues:
You are requested to change the setpoints on RML-2 as follows:
Warning should be set at 3.75 E 5
High alarm should be set at 4.25 E 6
3
START TIME:
STEP 1:
Obtain a copy of appropriate procedure.
STANDARD: UNSAT
Candidate obtains a copy of OP-505.
EXAMINER NOTE:
COMMENTS:
4
STEP 2: (step 4.4.2.1)
NOTE: The logic of the circuit does not allow HIGH alarm setpoint to be
lower than the WARNING setpoint. SAT
PULL OUT monitor to allow access to setpoint controls, if required
UNSAT
STANDARD:
N/A the setpoints for this monitor can be changed on the front panel
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
5
STEP 4: (step 4.4.2.2) Critical Step
ADJUST Warning setpoint, as required
UNSAT
SELECT the function switch to "1"
DEPRESS "Enter" to display Warning setpoint
DEPRESS "Digit" to select desired digit (flashing)
DEPRESS "Value" to change selected digit as required
DEPRESS "Enter"
DEPRESS "Warning" and VERIFY proper setpoint
STANDARD:
Locate the indications and depress the pushbuttons as directed. When the
"DIGIT" is selected it selects the specific number to change. Select "VALUE"
and depress it as necessary to change the specific number to setpoint of 3.75 E 5.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
6
STEP 5: (step 4.4.2.3) Critical Step
ADJUST High setpoint, as required
UNSAT
SELECT the function switch to "0"
DEPRESS "Enter" to display High setpoint
DEPRESS "Digit" to select desired digit (flashing)
DEPRESS "Value" to change selected digit as required
DEPRESS "Enter"
DEPRESS "High" and VERIFY proper setpoint
I STANDARD:
Locate the indications and depress the pushbuttons as directed. When the
"DIGIT" is selected it selects the specific number to change. Select "VALUE"
and depress it as necessary to change the specific number to setpoint of 4.25 E6.
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
END OF TASK
TIME STOP
7
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
The plant is lining up to perform a liquid release
Initiating Cues:
You are requested to change the setpoints on RML-2 as follows:
Warning should be set at 3.75 E 5
High alarm should be set at 4.25 E 6
8
CRYSTAL RIVER UNIT 3
IN-PLANT JOB PERFORMANCE MEASURE
Task: Perform a normal S/U of the AC electrical distribution system
Alternate Path: N/A
JPM #: B2A (2K2) NEW
K/A Rating/Importance: 062.A4.07
Task Number/Position: 0620102001/ RO
Task Standard: Start up VBIT-1A and transfer the vital bus to the normal power supply
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant x Admin Perform Simulate X
References:
1. OP-703 Rev. 68
Validation Time: 25 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Euuioment/Procedures Needed:
1. OP-703 Section 4.7
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be simulated for this JPM. Under no circumstances are you to
operate any plant equipment. I will provide initiating cues and reports on other actions when
directed by you. Ensure you indicate to me when you understand your assigned task. To
indicate that you have completed your assigned task, return the handout sheet to the examiner.
Initial Conditions:
VBIT-lA is de-energized, maintenance has been completed, the vital bus is aligned to the
alternate power source.
Initiating Cues:
You are the Primary Plant Operator:
While operating at 100% full power, the Control Room Supervisor (CRS) directs you to
STARTUP Inverter "1A" (VBIT-lA) and TRANSFER Vital bus "A" in accordance with OP 703, section 4.7.
2
START TIME:
STEP 1:
Obtain a copy of appropriate procedure.
UNSAT
STANDARD:
Candidate obtains a copy of OP-703 Rev. 68
EXAMINER NOTE:
COMMENTS:
3
STEP 2: (step 4.7.1)
DETERMINE Plant effects of inadvertent de-energization of Vital Bus prior to
Transfer AND REVIEW Enclosure 1, Static Switch Schematic to familiarize yourself
with the static switch
UNSAT
Vital Bus "A";
VBXS- lA
VBXS-3A
VBDP-3
VBDP-8
STANDARD:
N/A
EXAMINER CUE:
This would be done in a pre-job brief and is complete. The enclosure is the last page
of the procedure and you have that page for their review if they so desire.
EXAMINER NOTE:
Only one Vital Bus should be transferred at a time. All reset functions should be
completed prior to transfer of subsequent Vital Bus power supplies.
SP-32 1, Power Distribution Breaker Alignment and Power Availability Verification,
should be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (if possible) to verify the Vital Bus lineup after
energizing a vital bus from its redundant transformer power supply.
EXAMINER NOTE:
COMMENTS:
4
STEP 3: (step 4.7.2)
IF transferring Vital Bus "A", "C" or "D", SAT
THEN NOTIFY Security prior to transfer UNSAT
Security notified
STANDARD:
Call the control room to notify security
EXAMINER CUE:
Control room will notify security
EXAMINER NOTE:
COMMENTS:
5
STEP 4: (step 4.7.3) Critical Step
IF A, Inverter startup is required, SAT
THEN ENERGIZE Inverter VBIT-1A per the following details UNSAT
ENSURE "CT SHORTING SWITCH" toggle is in the "ON"
position.
DEPRESS AND HOLD "precharge pushbutton until the
"Precharged" Light is lit and the "BATTERY INPUT" circuit
breaker is closed on VBIT-IA.
CLOSE "BATTERY INPUT" circuit breaker AND RELEASE
the "Precharge" pushbutton on VBIT-1A.
CLOSE "AC INPUT" circuit breaker on VBIT- IA.
VERIFY the "IN SYNC" light is lit on VBIT- 1A.
CLOSE "INVERTER OUTPUT" circuit breaker on VBIT-lA.
STANDARD:
Locate components and simulate indications as stated
EXAMINER CUE:
CT Short toggle switch is in the ON position
When the precharge pushbutton is depressed the white light will be LIT, must hold
the precharge pushbutton until the Battery Input breaker is closed.
Battery Input breaker is closed.
AC Input breaker is closed.
"IN SYNC" light is LIT
Inverter Output Breaker is Closed.
EXAMINER NOTE:
Inverter Startup and Shutdown procedures are posted on plaques on the inverters.
Any changes to the following instructions requires there to be identical changes to the
installed plaques.
VBTR-4A/4B/4C/4D inlet and outlet breakers are to remain closed at all times unless
required open for maintenance.
COMMENTS:
6
STEP 5: (step 4.7.4)
AFTER Inverter startup, THEN NOTIFY Electric Shop to verify CVT core
temperature
UNSAT
Have Electric Shop verify the CVT core temp is > 90'C by measuring > 134.7 ohms
at CVT core temperature test points "CVT Temp. (T801)" TC-4 J2-7 to J2-8
STANDARD:
Notify control room to contact electric shop
EXAMINER CUE:
Electricians have checked temperatures and they are > 90'C.
EXAMINER NOTE:
COMMENTS:
7
STEP 6: (step 4.7.5)
VERIFY Normal Inverter AC Output Voltage SAT
Approximately 120V
UNSAT
STANDARD:
Observe Inverter voltage at 120V
EXAMINER CUE:
Inverter Voltage is approximately 120V
EXAMINER NOTE:
COMMENTS:
8
STEP 7: (step 4.7.6) Critical Step
EXAMINER CUE: SAT
WHEN transferring Vital Bus from Alternate Source to the INVERTER, UNSAT
THEN VERIFY following indications on respective VBXS- 1A
"Inverter Supplying Load" lamp is OFF
"Alternate Source Supplying Load" lamp is OFF
"In Sync" lamp is OFF
"Inverter Available FU-204" lamp is ON
"Auto Retransfer" switch is OFF
"Alternate Source AC Input" circuit breaker is OFF
"Manual Bypass" switch is in ALTERNATE SOURCE TO LOAD
position
STANDARD:
Locate components and simulate indications as stated
EXAMINER CUE:
"Inverter Supplying Load" lamp is OFF (amber light off)
"Alternate Source Supplying Load" lamp is OFF (red light off)
"In Sync" lamp is OFF (green light off)
"Inverter Available FU-204" lamp is ON (green light on)
"Auto Retransfer" switch is OFF (toggle switch off)
"Alternate Source AC Input" circuit breaker is OFF (circuit breaker off)
"Manual Bypass" switch is in ALTERNATE SOURCE TO LOAD position (rotary
switch selected to alternate source to load)
EXAMINER NOTE:
VBTR-4A/4B/4C/4D inlet and outlet breakers are to remain closed at all times unless
required open for maintenance.
COMMENTS:
9
STEP 8: (step 4.7.7) Critical Step
SELECT "Alternate Source AC Input" Circuit Breaker on VBXS-1A to the ON
position
UNSAT
STANDARD:
Locate component and simulate indication to ON
EXAMINER CUE:
"Alternate Source AC Input" Circuit Breaker on VBXS-IA to the ON position
EXAMINER NOTE:
COMMENTS:
10
STEP 9: (step 4.7.8) Critical Step
VERIFY "Alternate Source Supplying Load" lamp and "In Sync" lamp on VBXS-1A
are ON
UNSAT
"Alternate Source Supplying Load" lamp ON
"In Sync" lamp ON
STANDARD:
Locate component and simulate indication to ON
EXAMINER CUE:
"Alternate Source Supplying Load" lamp ON (red light on)
"In Sync" lamp ON (green light on)
EXAMINER NOTE:
COMMENTS:
11
STEP 10: (step 4.7.9) Critical Step
SELECT "Manual Bypass" switch on VBXS-IA to NORMAL OPERATION SAT
position
UNSAT
STANDARD:
Locate component and simulate indication to Normal Operation
EXAMINER CUE:
SELECT "Manual Bypass" switch on VBXS-1A to NORMAL OPERATION
position (rotary switch selected to normal operation)
EXAMINER NOTE:
COMMENTS:
12
STEP 11: (step 4.7.10) Critical Step
DEPRESS "Inverter to Load" pushbutton for VBXS- IA SAT
UNSAT
STANDARD:
Locate component and simulate depressing pushbutton
EXAMINER CUE:
DEPRESS "Inverter to Load" pushbutton for VBXS-1A (depress pushbutton)
EXAMINER NOTE:
COMMENTS:
13
STEP 12: (step 4.7.11) Critical Step
VERIFY "Inverter Supplying Load" lamp comes ON and "Alternate Source SAT
Supplying Load" lamp goes OFF
"Inverter Supplying Load" lamp ON UNSAT
"Alternate Source Supplying Load" lamp OFF
STANDARD:
Locate components and simulate indications "ON" and "OFF"
EXAMINER CUE:
"Inverter Supplying Load" lamp ON (amber light on)
"Alternate Source Supplying Load" lamp OFF (red light off)
EXAMINER NOTE:
COMMENTS:
14
STEP 13: (step 4.7.12) Critical Step
SELECT "Auto Retransfer" switch on VBXS-IA to ON SAT
UNSAT
STANDARD:
Locate components and simulate indication "ON"
EXAMINER CUE:
SELECT "Auto Retransfer" switch on VBXS-IA to ON (toggle switch to on)
EXAMINER NOTE:
COMMENTS:
15
STEP 14: (step 4.7.13)
VERIFY Inverter VBIT-1A status meters are Stable SAT
UNSAT
STANDARD:
Observe Inverter meters are stable
EXAMINER CUE:
VERIFY Inverter VBIT-1A status meters are Stable (meter indications are stable)
EXAMINER NOTE:
COMMENTS:
16
STEP 15: (step 4.7.14) Critical Step
VERIFY following indications on respective VBXS-3A SAT
"Inverter Supplying Load" lamp is OFF UNSAT
"Alternate Source Supplying Load" lamp is OFF
"In Sync" lamp is OFF
"Inverter Available FU-204" lamp is ON
"Auto Retransfer" switch is OFF
"Alternate Source AC Input" Circuit Breaker is OFF
"Manual Bypass" switch is in ALTERNATE SOURCE TO LOAD
position
STANDARD:
Locate components and simulate indications "ON" and "OFF"
EXAMINER CUE:
"Inverter Supplying Load" lamp is OFF (amber light off)
"Alternate Source Supplying Load" lamp is OFF (red light off)
"In Sync" lamp is OFF (green light off)
"Inverter Available FU-204" lamp is ON (green light on)
"Auto Retransfer" switch is OFF (toggle switch off)
"Alternate Source AC Input" circuit breaker is OFF (circuit breaker off)
"Manual Bypass" switch is in ALTERNATE SOURCE TO LOAD position (rotary
switch selected to alternate source to load)
EXAMINER NOTE:
VBTR-4A/4B/4C/4D inlet and outlet breakers are to remain closed at all times unless
required open for maintenance.
COMMENTS:
17
STEP 16: (step 4.7.15) Critical Step
SELECT "Alternate Source AC Input" Circuit Breaker on VBXS-3A to the ON
position
UNSAT
STANDARD:
Locate component and simulate indication to ON
EXAMINER CUE:
"Alternate Source AC Input" Circuit Breaker on VBXS-3A to the ON position
EXAMINER NOTE:
COMMENTS:
18
STEP 17: (step 4.7.16) Critical Step
VERIFY "Alternate Source Supplying Load" lamp and "In Sync" lamp on VBXS-3A
are ON
UNSAT
"Alternate Source Supplying Load" lamp ON
"In Sync" lamp ON
STANDARD:
Locate components and simulate indications to "ON"
EXAMINER CUE:
"Alternate Source Supplying Load" lamp ON (red light on)
"In Sync" lamp ON (green light on)
EXAMINER NOTE:
COMMENTS:
19
STEP 18: (step 4.7.17) Critical Step
SELECT "Manual Bypass" switch on VBXS-3A to NORMAL OPERATION SAT
position
UNSAT
STANDARD:
Locate component and simulate indication to Normal Operation
EXAMINER CUE:
SELECT "Manual Bypass" switch on VBXS-3A to NORMAL OPERATION
position (rotary switch selected to normal operation)
EXAMINER NOTE:
COMMENTS:
20
STEP 19: (step 4.7.18) Critical Step
DEPRESS "Inverter to Load" pushbutton for VBXS-3A SAT
Clears Control Room Inverter Bypass Alarm UNSAT
STANDARD:
Locate component and simulate depressing pushbutton
EXAMINER CUE:
Control room acknowledges alarm clear
EXAMINER NOTE:
Notification is not critical
COMMENTS:
21
STEP 20: (step 4.7.19) Critical Step
VERIFY "Inverter Supplying Load" lamp comes ON and "Alternate Source SAT
Supplying Load" lamp goes OFF
Sm
UNSAT
"Inverter Supplying Load" lamp ON
"Alternate Source Supplying Load" lamp OFF
STANDARD:
Locate components and simulate indications "ON" and "OFF"
EXAMINER CUE:
"Inverter Supplying Load" lamp ON (amber light on)
"Alternate Source Supplying Load" lamp OFF (red light off)
EXAMINER NOTE:
COMMENTS:
22
STEP 21: (step 4.7.20) Critical Step
SELECT "Auto Retransfer" switch on VBXS-3A to ON position SAT
UNSAT
STANDARD:
Locate components and simulate indication "ON"
EXAMINER CUE:
SELECT "Auto Retransfer" switch on VBXS-3A to ON (toggle switch to on)
EXAMINER NOTE:
COMMENTS:
23
STEP 22: (step 4.7.21)
VERIFY Inverter VBIT- 1A status meters are Stable
UNSAT
STANDARD:
Observe Inverter meters are stable
EXAMINER CUE:
VERIFY Inverter VBIT-1A status meters are Stable (meter indications are stable)
EXAMINER NOTE:
COMMENTS:
END OF TASK
TIME STOP
24
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
VBIT-lA is de-energized, maintenance has been completed, the vital bus is aligned to the alternate power
source.
Initiating Cues:
You are the Primary Plant Operator.
While operating at 100% full power, the Control Room Supervisor (CRS) directs you to STARTUP
Inverter "IA" (VBIT-IA) and TRANSFER Vital bus "A" in accordance with OP-703, section 4.7.
25
CRYSTAL RIVER UNIT 3
IN-PLANT JOB PERFORMANCE MEASURE
Task: Transfer excess contaminated secondary inventory to the "A" Fire Service Tank, FST-1
Alternate Path: No
JPM #: B2b (2K2) BANK #270
K/A Rating/Importance: 037AK3.07 4.2/4.4
Task Number/Position: 0860504001, 0560504005/SPO
Task Standard: Transfer excess contaminated secondary inventory to the "A" Fire Service
Tank, FST-1
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant x Admin Perform Simulate X
References:
1. EOP-14, Enclosure 9, Rev 8
Validation Time: 20 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/EouiomentlProcedures Needed:
1. EOP-14, Enclosure 9, Rev 8
2. A "P" key is required to gain entry to the Fire Pump House. CDV-103 lock should be
on the SPO key ring
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be simulated for this JPM. Under no circumstances are you to
operate any plant equipment. I will provide initiating cues and reports on other actions when
directed by you. Ensure you indicate to me when you understand your assigned task. To
indicate that you have completed your assigned task, return the handout sheet to the examiner.
Initial Conditions:
In EOP-6 OTSGs steaming to the condenser, with at least 1 RCP operating. Additional
secondary water inventory storage is desired.
Initiating Cues:
You are the Turbine Building Operator:
Perform EOP-14 enclosure 9, OTSG contaminated waste water management.
2
START TIME:
STEP 1:
Obtain a copy of appropriate procedure.
UNSAT
STANDARD:
Candidate obtains a copy of EOP- 14, Enclosure 9, Rev 8
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
3
STEP 2: (step 9.1 ) Critical Step
Align FSP recirc Hdr to FST-lB SAT
Ensure FSV-28 "FST-1B INLET ISO" is open (119 ft Berm between UNSAT
FSTs).
Close FSV-27 "FST-1A INLET ISO" (119 ft Berm between FSTs).
Open FSV-24 "FSP RECIRC LINE TO FST ISO" (119 ft FSPH
northwest wall)
STANDARD:
Locate the identified valves and simulate operation to the appropriate position.
EXAMINER CUE:
FSV -- 28 is OPEN
FSV - 27 is CLOSED
FSV - 24 is OPEN
EXAMINER NOTE:
COMMENTS:
4
STEP 3: (step 9.2) Critical Step
Verify FSP-2B is available. SAT
IF FSP-2B is NOT available, THEN GO TO Step 9.9 in this enclosure. UNSAT
STANDARD:
Go to Step 9.9
EXAMINER CUE:
FSP-2B is NOT available
EXAMINER NOTE:
SteDs 9.3 throu2h 9.8 are N/A. the next step is 9.9
COMMENTS:
5
STEP 4: (step 9.9) Critical Step
Open FSV-41 "FSP SUCTION HDR CROSS-TIE" (119 ft FSPH north wall). SAT
UNSAT
STANDARD:
Locate the identified valves and simulate operation to the appropriate position.
EXAMINER CUE:
FSV - 41 is OPEN
EXAMINER NOTE: STATUS
FSP-2B not available.
FSP-l available for alignment to FST-1B to support FS.
FSP-2A available to transfer FST-lA to FST-1B.
COMMENTS:
6
STEP 5: (step 9.10)
Close FSV-13 "FSP SUCTION HDR CROSS-TIE" (119 ft FSPH north wall). SAT
UNSAT
STANDARD:
Locate the identified valves and simulate operation to the appropriate position.
EXAMINER CUE:
FSV - 13 is CLOSED
EXAMINER NOTE:
COMMENTS:
7
STEP 6: (step 9.11) Critical Step*
Establish recirc flow to FST-1B SAT
Notify Control Room to start FSP-2A UNSAT
Verify FSP-2A is running (119 ft FSPH).
- Throttle open FSV-23 "FSP-2A RECIRC ISO" (119 ft FSPH
southeast wall) to establish 2100 gpm) as indicated on
FS-12-FIS"FSP-I/1A/IB RECIRC FLOW".
STANDARD:
Call control room to start FSP-2A
Observe FSP-2A is running
- Locate valve and throttle to 2100 gpm
EXAMINER CUE:
Control room reports that FSP-2A is running
Indicate that FSP-2A is running
As operator throttles FSV-23 indicate flow increase to 2100 gpm on FS-12-FIS
EXAMINER NOTE:
FSP-1 or FSP-2B aligned to FST-1B to support FS
FSP-2A available to transfer FST-1A to FST-1B
COMMENTS:
8
STEP 7: (step 9.12)
Notify Control Room that FST- 1A transfer is in progress and request to be notified SAT
when FST-1A level is 6 ft.
UNSAT
STANDARD:
Call control room and ask for notification
EXAMINER CUE:
Notify operator that level is 6 ft.
EXAMINER NOTE:
COMMENTS:
9
STEP 8: (step 9.13) Critical Step
WHEN notified by Control Room that FST-1A level is 6 ft, SAT
THEN stop recirc flow.
UNSAT
Close FSV-23 "FSP-2A RECIRC ISO" (119 ft FSPH southeast
wall).
Select FSP-2A "START MODE SELECTOR SWITCH" to
"OFF" (119 ft FSPH).
WHEN FSP-2A stops, THEN select FSP-2A "START MODE
SELECTOR SWITCH" to "AUTO" (119 ft FSPH).
Close FSV-24 "FSP RECIRC LINE TO FST ISO" (119 ft FSPH
northwest wall).
STANDARD:
Locate the identified valves and switches and simulate operation to the appropriate
position.
EXAMINER CUE:
FSV-23 is CLOSED
Start Mode is OFF
FSP-2A is stopped Start mode to AUTO
FSV-24 is CLOSED
EXAMINER NOTE:
COMMENTS:
10
STEP 9: (step 9.14) Critical Step*
Align FSP suctions to FST-1B SAT
Ensure the following pumps are stopped (119 ft FSPH): UNSAT
FSP-1
FSP-2A
- Close FSV-3 "FST-1A OUTLET ISO" (119 ft Berm behind
FST- IA).
north wall).
ft FSPH north wall).
STANDARD:
Locate the identified valves and simulate operation to the appropriate position.
EXAMINER CUE:
FSP-I / 2A are stopped
- FSV-3 is CLOSED
- FSV-41 is OPEN
- FSV-13 is OPEN
EXAMINER NOTE: STATUS
FST-IA level = 6 ft
FST transfer complete
COMMENTS:
11
STEP 10: (step 9.15)
Notify Control Room of FST- IA status. SAT
FST- 1A is pumped down and isolated. UNSAT
FST- 1A and CDT-I are to be cross-tied
STANDARD:
Notify control room of FST-1A status
EXAMINER CUE:
Respond as control room that FST-lA is pumped down and that it will be cross-tied
to CDT- I
EXAMINER NOTE:
COMMENTS:
12
STEP 11: (step 9.16) Critical Step
Cross-tie FST-1A to CDT-I SAT
Close CDV-288 "FST TO CDT-I CROSS-TIE DRAIN" (119 ft UNSAT
Berm by FST-1A).
Open CDV-289 "FST TO CDT-I CROSS-TIE ISO" (119 ft
Berm by FST-1A).
Open FSV-918 "FST TO CDT-I CROSS-TIE ISO" (119 ft
Berm by FST-1A)
Open CDV-103 "CDT-I TO EFP SUCTION" (119 ft Berm by
CDT-1).
STANDARD:
Locate the identified valves and simulate operation to the appropriate position.
EXAMINER CUE:
CDV-288 is CLOSED
CDV-289 is OPEN
FSV-918 is OPEN
CDV-103 is OPEN
EXAMINER NOTE:
COMMENTS:
13
14
STEP 13: (step 9.18)
Exit this Enclosure SAT
UNSAT
STANDARD:
EXAMINER CUE:
EXAMINER NOTE:
COMMENTS:
END OF TASK
TIME STOP
15
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
In EOP-6 OTSGs steaming to the condenser, with at least 1 RCP operating. Additional secondary water
inventory storage is desired.
Initiating Cues:
You are the Turbine Building Operator:
Perform EOP-14 enclosure 9, OTSG contaminated waste water management.
16
CRYSTAL RIVER UNIT 3
IN-PLANT JOB PERFORMANCE MEASURE
Task: Release waste gas decay tank to plant ventilation.
Alternate Path: When the release is started WD-19-FQI fails high.
JPM : B2c (2K2) REPEAT
K/A Rating/lmportance: G2.3.11/2.7/3.2
Task Number/Position: 0710103004/PPO
Task Standard: Release waste gas decay tank to plant ventilation using OP-412B.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator In-Plant x Admin Perform Simulate X
References:
1. OP-412B Rev. 19
Validation Time: 15 min. Time Critical: No
Candidate: Time Start:
Printed Name Time Finish:
Performance Rating: SAT UNSAT Performance Time:
Examiner: /
Printed Name Signature Date
Comment:
Tools/Eouinment/Procedures Needed:
1. OP-412B completed up to step 4.1.32
2. Waste Gas Release Permit
3. Key to WDV-478
4. Calculator
READ TO THE OPERATOR
Directions to the Student:
I will explain the initial conditions, and state the task to be performed. All steps, including any
required communications, shall be simulated for this JPM. Under no circumstances are you to
operate any plant equipment. I will provide initiating cues and reports on other actions when
directed by you. Ensure you indicate to me when you understand your assigned task. To
indicate that you have completed your assigned task, return the handout sheet to the examiner.
Initial Conditions:
You are the PRIMARY PLANT OPERATOR.
The previous shift has started the process of releasing the "C" Waste Gas Decay Tank to plant
ventilation.
Initiating Cues:
You are requested to continue with the release of the "C" Waste Gas Decay Tank, starting with
step 4.1.32 of OP-412B.
2
START TIME:
STEP 1:
Obtain a copy appropriate procedure.
UNSAT
STANDARD:
Candidate obtains a copy of OP-412B.
EXAMINER NOTE:
When the candidate has completed reading the cue provide them with the
GRWRP and a partially completed OP-412B.
COMMENTS:
3
STEP 2: (step 4.1.32) Critical Step
PERFORM Valve Alignment for WGDT "C" Discharge SAT
CLOSE the following: UNSAT
WDV-392, WGDT WDT IC Inlet Isol
WDV-435, WGDT WDT IC Drain Isol
WDV-395, WGDT WDT IC Outlet Isol to Recycle
OPEN the following:
WDV-439, Waste Gas Discharge CV
WDV-438, WGDT WDT IC Outlet Release
WDV-477, Outlet Isolation to RM-1 1A
STANDARD:
Candidate verifies green light ON and red light OFF for WDV-392. Candidate
rotates hand wheel for WDV-435 clockwise until hard stop. Candidate verifies
green light ON and red light OFF for WDV-395. Candidate rotates control switch
for WDV-439 open and verifies red light ON and green light OFF. Candidate
rotates control switch for WDV-438 open and verifies red light ON and green
light OFF. Candidate rotates hand wheel for WDV-477 counter-clockwise until
hard stop.
EXAMINER CUE:
WDV-392 and WDV-395 green lights are ON and red lights are OFF. WDV-439
and WDV-438 red lights are ON and green lights are OFF. WDV-477 hand
wheel rotates and comes to a hard stop.
EXAMINER NOTE:
IF the valve alley is inaccessible then report that WDV-435 was closed earlier by
an operator in the valve alley.
COMMENTS:
4
STEP 3: (step 4.1.33) Critical Step
COMPLETE Valve Alignment for WGDT Release SAT
CLOSE WDV-566, Nitrogen Gas Sampler Purge Isolation UNSAT
CLOSE WDV-549, Nitrogen Gas Sampler Purge Isolation
OPEN WDV-565, Inlet to RM-AI1 Isolation
STANDARD:
Candidate rotates manual valve operator of WDV-566 in clockwise direction until
hard stop. Candidate rotates hand wheel of WDV-549 in clockwise direction
until hard stop. Candidate rotates manual valve operator of WDV-565 in counter
clockwise direction until hard stop.
EXAMINER CUE:
WDV-566 hand wheel rotates and comes to a hard stop. WDV-549 hand wheel
rotates and comes to a hard stop. WDV-565 hand wheel rotates and comes to a
hard stop.
EXAMINER NOTE:
COMMENTS:
5
STEP 4: (step 4.1.34)
If RM-A II is inoperable, then complete enclosure 2, Independent Verification of SAT
Discharge Valves Lineup.
Perform independent verification of discharge lineup. UNSAT
Annotate completion of two independent verifications of the
discharge lineup on the GRWRP.
STANDARD:
N/A
EXAMINER CUE:
RM-AlI is operable.
EXAMINER NOTE:
COMMENTS:
6
STEP 5: (step 4.1.35)
Notify Security of Waste Gas Release. SAT
Verify roof patrols have been secured. UNSAT
STANDARD:
N/A
EXAMINER CUE:
This has been completed by the Control Room.
EXAMINER NOTE:
COMMENTS:
7
STEP 6: (step 4.1.36)
Ensure Channel Check on WD-19-FQI is completed. SAT
WD-19-FQI Channel Check Complete
Step 4.1.15 has been completed SAT UNSAT
PT-i168B, Section 4.1 has been completed SAT
Annotate completion of WD-19-FR Channel Check on the GRWRP
WD- 19-FQI is inoperable and to step 4.1.39
STANDARD:
Candidate observes step 4.1.15 has been checked and checks the first part of detail 1.
Candidate signs and dates GRWRP in appropriate section.
EXAMINER CUE:
Candidate checks step 4.1.15 has been completed SAT signs off step 4.1.36 and
continues on in the procedure
EXAMINER NOTE:
COMMENTS:
8
STEP 7: (step 4.1.37) Critical Step
PROCEDURE CAUTION: Do not pressurize GM tube in RM-Al 1 above 8 psig. SAT
Start WGDT release to ventilation filter units. UNSAT
Unlock and throttle WDV-478 adjusting flow to the most
conservative of the following:
Flow less than 10 scfm on WD-19-FQI.
Flow less than limits established on GRWRP.
STANDARD:
Candidate unlocks WDV-478 and rotates hand wheel counter-clockwise to a
throttled position.
EXAMINER CUE:
WDV-478 is in a throttled position
EXAMINER NOTE:
COMMENTS:
9
STEP 8: (step 4.1.38) Critical Step
Determine if WD- 19-FQI is operating properly. SAT
If flow rate appears accurate, then go to step 4.1.40 UNSAT
If no flow rate is indicated or appears inaccurate, then close WDV-478 and notify
the NSS/NSM
EXAMINER CUE:
WD-19-FQI reads 999.99
STANDARD:
Candidate rotates WDV-478 hand wheel clockwise until hard stop reached.
Candidate notifies NSS/NSM of inaccuracy of WD-19-FQI
EXAMINER CUE:
WDV-478 is closed. The JPM is complete.
COMMENTS:
END OF TASK
TIME STOP
10
CANDIDATE CUE SHEET
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
You are the PRIMARY PLANT OPERATOR:
The previous shift has started the process of releasing the "C" Waste Gas Decay Tank to plant ventilation
Initiatin2 Cues:
You are requested to continue with the release of the "C" Waste Gas Decay Tank, starting with step
4.1.32 of OP-412B
11