William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P.O. Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00691-WEI/SMM February 14, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JANUARY 2002 Enclosed are the Monthly Operating Reports for JANUARY 2002, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Sue Meyer at (602) 250-3078.
Sincerely, WEI/SMM/cj
Enclosures:
JANUARY 2002 Monthly Operating Reports cc:
E. W. Merschoff (all w/enclosures)
J. H. Moorman INPO Records Center Utility Data Institute
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-528 PVNGS-1 02/11/02 S. M. Marie-Meyer (602) 250-3078 Reporting Period:
January 2002
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
- 3.
- 4.
- 5.
6.
UNIT SHUTDOWNS No.
Date Outage Duration Type 1 Hours Reason 2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of January 2002.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- 1243 Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 744.0 106,975.1 Hours Generator was On-Line 744.0 744.0 105,631.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 942,991 942,991 126,906,549 1F-Forced S-Scheduled
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Repo 1.
50-529 PVNGS-2 02/11/02 S. M. Marie-Meyer (602) 250-3078 rting Period:
January 2002 Design Electrical Rating (Net MWe):
1il
- 2.
Maximum Dependable Capacity (Net MWe):
- 3.
- 4.
- 5.
6.
UNIT SHUTDOWNS Outage Duration TypeI Hours Reason 2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of January 2002.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- 265 1243 Unit 2 Generating Statistics This Month Yr. To Date Cumulative Hours Reactor was Critical 744.0 744.0 106,645.5 Hours Generator was On-Line 744.0 744.0 105,342.0 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 949,906 949,906 127,874,417 No.
Date 1F-Forced S-Scheduled
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-530 PVNGS-3 02/11/02 S. M. Marie-Meyer (602) 250-3078 Reporting Period:
January 2002
- 1.
Design Electrical Rating (Net MWe):
126!
- 2.
Maximum Dependable Capacity (Net MWe):
- 3.
- 4.
- 5.
6.
UNIT SHUTDOWNS Reason 2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of January 2002.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- 9 1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 744.0 102,167.7 Hours Generator was On-Line 744.0 744.0 101,179.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 951,422 951,422 123,320,872 No.
Date Type 1 Outage Duration Hours IF-Forced S-Scheduled