ML020510027
| ML020510027 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 01/29/2002 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML020510027 (2) | |
Text
T e e o of x S ity, T
7 ATLON Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381 -2000 JAN 2 9 2B" 10 CFR 50.54(p)
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN)
UNIT 1 AND 2 AND CONTINGENCY PLAN (PS/CP) REVISION 5 Docket No.50-390 50-391 PHYSICAL SECURITY Pursuant to 10 CFR 50.54(p),
this letter provides Revision 5 of the PS/CP which supersedes Pages 1 (cover page),
3D, and 29 of Revision 4 submitted on May 29, 2001.
TVA is submitting this change to incorporate the alternate methods for verifying military service as detailed in NRC's letter from Samuel J.
Collins, Director of Nuclear Reactor Regulation to Ralph E.
Beedle, Vice President Nuclear Energy Institute (NEI) dated November 14, 2001.
TVA has evaluated these changes and does not consider these revisions to decrease the overall effectiveness of the security plan.
Enclosed are four copies (Nos.
6 through 9) assigned to NRC.
Copies 10 and 11 are being provided to Region II by copy of this letter.
The information is being sent by certified mail and the signed receipt will signify that NRC has received this information.
TVA requests this submittal be withheld from public disclosure under 10 CFR 2.790(d) (1) as the information enclosed is part of a safeguards document.
THIS-P0 SiEPI
~THIS PAGE R*T*ED FROM THE kTTACHED Z D..COONTTOLL.'
~yC~ed ~,
r CONTAJNS ?.70 IMMAUWTION
) )
~uA~iS NF I UTION U.S. Nuclear Regulatory Commission Page 2 JAN 2 9 2002 If you have any questions about this revision, please contact me at (423) 365-1824.
P. L.* Pace Manager, Site Licensing and Industry Affairs Enclosure (Nos.
6 through 9) cc:
NRC Resident Inspector (w/o Enclosure)
Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.
L.
Mark Padovan, Senior Project Manager (w/o Enclosure)
U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission(
Enclosure:
Copies 10 and 11)
Region II P.
- 0. Box 2257 Atlanta, Georgia 30323 CONTAINS 2.790 INFORMATION S E UARD0`I FORMATION