Text

AmerGen AmerGen Energy Company, LLC An Exelon/British Energy Company Oyster Creek US Route 9 South PO. Box 388 Forked River, NJ 08731-0388 10 CFR 26.71(d)

January 31, 2002 2130-02-20037 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station (OC)

DPR-16/Docket 50-219 Fitness For Duty (FFD) Semi-Annual Report July 2001 - December 2001 Pursuant to 10 CFR 26.71 (d), AmerGen Energy Company, LLC hereby submits the FFD Performance Data Reports for Oyster Creek Generating Station for the period July 1, 2001 through December 31, 2001. As required, each separate report provides the following information:

i. Drugs tested for, and cut-off levels; ii. Number tested (by Category and Total), and results by population and type of test; iii. Substance(s) identified; iv. Random testing rate;
v. Summary of Management Action(s);

vi. Workforce population tested (average number with unescorted access); and, vii. List of events reported.

Yours truly, Ron De( gono Vice Pres.t, Oyster Creek c: Oyster Creek Senior Resident Inspector Oyster Creek Senior Project Manager Administrator Region I

PERFORMANCE DATA FOR PERSONNEL SUBJECT TO 10 CFR 26 REPORT F-RIOD: JULY 2001 - DECEMBER 2001 OYSTER CREEK - ATTACHMENT - Page 1 TESTING RATE

1. The annualized random testing rate for Oyster Creek Licensee Employees was 56.19%.
2. The annualized random testing rate for Oyster Creek Contractor Personnel was 68.09%.

SUMMARY

OF MANAGEMENT ACTIONS

1. There were no (0) Licensee Pre-Access Positive tests during the reporting period. There were two (2) Licensee Positive Random tests during the period. One positive test for Marijuana and one positive test for Alcohol. The individual who tested positive for Alcohol is a Licensed Operator. In addition, there was one (1) Licensee Positive "For-Cause/Observed Behavior" alcohol test during the period. In all of these cases, the individual's Access was immediately suspended and the matter was handled in accordance with the AmerGen FFD Policy/Disciplinary Policy.
2. There were three (3) Contractor Pre-Access Positive tests during the reporting period. Two (2) tested positive for Drugs, and one (1) tested positive for Alcohol. All of these individuals were denied access to the Protected Area. There were two (2) Contractor Random Positive tests during the reporting period. One (1) tested positive for Drugs, and one (1) tested positive for Alcohol. All of these individuals were denied access to the Protected Area.

LIST OF EVENTS REPORTED

1. On November 23, 2001, a Licensed Operator tested Positive for Alcohol during a Random Drug/Alcohol Test (noted in #1 above). The incident was reported to the NRC in accordance with 1 0-CFR-26.73. The individual's Access was immediately suspended and the matter was handled in accordance with the AmerGen FFD/Disciplinary Policy.

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 Company 6 Months Ending AmerGen Energy Company LLC December 31,2001 Location Operating License and Docket No.

DPR-16 / Docket 50-219 (OC)

Oyster Creek Generating Station Forked River, NJ Contact Name Phone R. Ewart (609) 971-4949 CUTOFFS: SCREEN/CONFIRMATION (ng/ml) APPENDIX A TO 10CFR26 MARIJAUNA / AMPHETAMINES COCAINE / PHENCYCLIDINE OPIATES / ALCOHOL (% BAC) /

LONG-TERM SHORT-TERM CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH 726 N/A 326 UNESCORTED ACCESS

PERFORMANCE DATA FOR PERSONNEL SUBJECT TO 10 CFR 26 REPORT PERIOD JULY 2001 - DECEMBER 2001 OYSTER CREEK. PAGE 2 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES (OYSTER CREEK)

MARIJUANA COCAINE OPIATES AMPHE- PHENCY- ALCOHOL REFUSAL TAMINES CLIDINE TO TEST LICENSEE EMPLOYEES 1 0 0 0 0 2 0 LONG-TERM CONTRACTORS 0 0 0 0 0 0 0 SHORT-TERM CONTRACTORS 2 I 1 0 0 2 0 TOTAL 3 1 1 0 01 4 0 t Note: The Contractor total substances identified are different from the total number of positive Tests reported due to multiple substances being identified on one individual.