ML020460317

From kanterella
Jump to navigation Jump to search

Tech. Spec. Pages for Amendment Nos. 204 and 200 - Issuance of Amendment Reactor Pressure Vessel Level Instrumentation Surveillance Frequencies and Allowable Values
ML020460317
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/12/2002
From:
NRC/NRR/DLPM
To:
Chawla M
References
TAC MB2733, TAC MB2734
Download: ML020460317 (9)


Text

Feedwater System and Main Turbine High Water Level Trip Instrumentation 3.3.2.2 SURVEILLANCE REQUIREMENTS


.NOTE ------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

SURVEILLANCE FREQUENCY SR 3.3.2.2.1 Perform CHANNEL CHECK.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.3.2.2.2 Perform CHANNEL FUNCTIONAL TEST.

92 days SR 3.3.2.2.3 Calibrate the trip unit.

92 days SR 3.3.2.2.4 Perform CHANNEL CALIBRATION.

The 24 months Allowable Value shall be : 50.34 inches.

SR 3.3.2.2.5 Perform LOGIC SYSTEM FUNCTIONAL TEST, 24 months including breaker and valve actuation.

Amendment No.204/200 Quad Cities 1 and 2 3.3.2.2-2

ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS


NOTES --------------------------------

1.

Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.5.1.2 Perform CHANNEL FUNCTIONAL TEST.

92 days SR 3.3.5.1.3 Calibrate the trip unit.

92 days SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.

92 days SR 3.3.5.1.5 Perform CHANNEL CALIBRATION.

184 days (continued)

Amendment No.204/200 I

I Quad Cities 1 and 2 3.3.5.1-8

ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.5.1.6 Perform CHANNEL CALIBRATION.

24 months SR 3.3.5.1.7 Perform LOGIC SYSTEM FUNCTIONAL TEST.

24 months Amendment No.20 4 / 2 0 0 Quad Cities I and 2 3.3.5.1-9

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page I of 4)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES REQUIRED REFERENCED OR OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

1. Core Spray System
a.

Reactor Vessel Water Level-Low Low

b.

Drywell Pressure-High

c.

Reactor Steam Dome Pressure-Low (Permissive)

d.

Core Spray Pump Discharge Flow-Low (Bypass)

e.

Core Spray Pump Start-Time Delay Relay 1,2.3, 4(-].

5W.

1,2,3 1,2,3 4(-

5, )

1,2,3, 41 :, 5(2 3

1. 2, 3

4W 4(-

2 2

I per pump 1 per pump SR SR SR SR SR 3.3.5.1.1 3.3.5.1.2 3.3.5.1.3 3.3.5.1.6 3.3.5.1.7 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 C

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 B

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 E

SR SR SR SR 3.3.5.1.2 3.3.5.1.3 3.3.5.1.6 3.3.5.1.7 C

SR 3.3.5.1.6 SR 3.3.5.1.7

? -55.2 inches 5 2.43 psig 2 306 psig and s 342 psig S306 psig and

342 psig t 577 gpm and

! 830 gpm

11.4 seconds
2.

Low Pressure Coolant Injection (LPCI)

System

a.

Reactor Vessel Water Level-Low Low

b.

Drywell Pressure-High

c.

Reactor Steam Dome Pressure -Low (Permissive) 1,2.3.

4 * -, 5(a) 1,2,3 1,2,3 4(a),

5C.)

4 B

SR SR SR SR SR B

SR SR SR 3.3.5.1.1 3.3.5.1.2 3.3.5.1.3 3.3.5.1.6 3.3.5.1.7 3.3.5.1.2 3.3.5.1.4 3.3.5.1.7 C

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 B

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 2

z -55.2 inches

2.43 psig 2 306 psig and
342 psig z 306 psig and
342 psig Amendment No.204/ 2 0 0 (continued)

(a) When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2, "ECCS-Shutdown."

(b) Also required to initiate the associated diesel generator (DG).

I I I

Quad Cities I and 2 3.3.5.1-10

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 2 of 4)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES REQUIRED REFERENCED OR OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION AVTION A.1 REQUIREMENTS VALUE

2.

LPCI System (continued)

d.

Reactor Steam Dome 1.2.3 4

B SR 3.3.5.1.2 2 668 psig and Pressure-Low (Break SR 3.3.5.1.5

891 psig Detection)

SR 3.3.5.1.7

e.

Low Pressure Coolant 1.2,3, 1 per pump C

SR 3.3.5.1.6 s 6.7 seconds Injection Pump SR 3.3.5.1.7 Start-Time Delay Relay Pumps B and D

f.

Low Pressure 1,2,3.

1 per loop E

SR 3.3.5.1.2 2 2526 gpm Coolant Injection Pump SR 3.3.5.1.3 Discharge Flow-Low 4:-!.

5;,)

SR 3.3.5.1.6 (Bypass)

SR 3.3.5.1.7

g.

Recirculation Pump

1. 2, 3

4 per pump C

SR 3.3.5.1.2

n.

Recirculation Riser 1,2.3 C

SR 3.3.5.1.2

2,15 psid Differential SR 3.3.5.1.6 Pressure-High (Break SR 3.3.5.1.7 Detection)
i.

Recircjlation Pump 1, 2. 3 2

C SR 3.3.5.1.6 s 0.82 seconds Differential Pressure SR 3.3.5.1.7 Time Delay-Relay (Break Detection)

j.

Reactor Steam Dome 1, 2, 3

2 B

SR 3.3.5.1.6

! 2.26 seconds Pressure Time Delay-SR 3.3.5.1.7 Relay (Break Detection)

k.

Recirculation Riser

1. 2, 3

2 C

SR 3.3.5.1.6 s 0.82 seconds Differential Pressure SR 3.3.5.1.7 Time Delay-Relay (Break Detection)

(continued)

(a)

When associated ECCS subsystem(s) are required to be OPERABLE per LCD 3.5.2.

Amendment No. 204/200 I I Quad Cities I and 2 3.3.5.1-11

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 4)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.I REQUIREMENTS VALUE

3.

High Pressure Coolant Injection (HPCI)

System

a.

Reactor Vessel Water Level -Low Low

b.

Drywell Pressure-High

c.

Reactor Vessel Water Level - High

c.

Contaminated Conoensate Storage Tank (CCST)

Level -Low

e.

Suppression Pool Water Level-High f,

High Pressure Coolant Injection Pump Discharge Flow-Low (Bypass)

g.

Manual Initiation

4. Automatic Depressurization System (ADS)

Trip System A

a.

Reactor Vessel Water Level-Low Low

b.

Drywell Pressure-High

c.

Automatic Depressurization System Initiation Timer 1,

2:*.

3(c¢ 1,

2(0,310)

I, 2(c),

3(")

1.

2'0, 3(-.

1.

1, 2t 3W 1,

2(c, 3(c I.

2%),

3!)0 1,

2(c).

3(c) 1, 2(c),

3(c) 4 4

2 2

B SR SR SR SR SR B

SR SR SR C

SR SR SR SR O

SR SR SR D

SR SR SR 3.3.5.1.1 3.3.5.1.2 3.3.5.1.3 3.3.5.1.6 3.3.5.1.7 3.3.5.1.2 3.3.5.1.4 3.3.5.1.7 3.3.5.1.2 3.3.5.1.3 3.3.5.1.6 3.3.5.1.7 3.3.5.1.2 3.3.5.1.6 3.3.5.1.7 3.3.5.1.2 3.3.5.1.6 3.3.5.1.7 E

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 C

SR 3.3.5.1.7 F

SR SR SR SR SR 2

2 1

3.3.5.1.1 3.3.5.1.2 3.3.5.1.3 3.3.5.1.6 3.3.5.1.7 F

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 G

SR 3.3.5.1.6 SR 3.3.5.1.7 t -55.2 inches

2.43 psig 5 50.34 inches a 598 ft 1 inch
15 ft 11.25 inches gpm NA S-55.2 inches 5 2.43 psig 5 119 seconds (continued)

(c)

With reactor steam dome pressure > 150 psig.

Amendment No. 204/200 Quad Cities 1 and 2 3.3.5.1-12

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 4)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

4.

ADS Trip System A (continued)

d.

Core Spray Pump Discharge Pressure-High

e.

Low Pressure Coolant Injection Pump Discharge Pressure-High

f.

Automatic Depressurization System Low Low Water Level Actuation Timer

5. ADS Trip System B
a.

Reactor Vessel Water Level-Low Low

b.

Drywell Pressure-High

c.

Automatic Depressurization System Initiation Timer

d.

Core Spray Pump Discharge Pressure-High

e.

Low Pressure Coolant Injection Pump Discharge Pressure-High

f.

Automatic Depressurization System Low Low Water Level Actuation Timer 1,

2(c),

3(c) 1, 1.

2-c.

3cc

1.

2cc, 3(cc 1,

2(c),

3-cc

1.

1, 2-,)

3-c 1,

2(c),

3(c) 1, 210). 3-c 2

4 2

2 G

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 SR 3.3.5.1.6 SR 3.3.5.1.7 SR SR SR SR SR 3.3.5.1.1 3,3.5.1.2 3.3.5.1.3 3.3.5.1.6 3.3.5.1.7 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 G

SR 3.3.5.1.6 SR 3.3.5.1.7 G

SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.7 2

4 G

SR SR SR 3.3.5.1.2 3.3.5.1.4 3.3.5.1.7 G

SR 3.3.5.1.6 SR 3.3.5.1.7 (c)

With reactor steam dome pressure > 150 psig.

Amendment No.20 4 /20 0 S101.9 psig and S 148.1 psig a 101.6 psig and s 148.4 psig 5 530 seconds S-55.2 inches

<_ 2.43 psig I

S119 seconds 2 101.9 psig and 5 148.1 psig

? 101.6 psig and 5 148.4 psig

530 seconds I

I I

Quad Cities 1 and 2 3.3.5.1-13

RCIC System Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS NOTES ----------------------------------

1.

Refer to Table 3.3.5.2-1 to determine which SRs apply for each RCIC Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 2 and 5; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1, 3, and 4 provided the associated Function maintains RCIC initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.5.2.2 CALIBRATE the trip unit.

92 days SR 3.3.5.2.3 Perform CHANNEL FUNCTIONAL TEST.

92 days SR 3.3.5.2.4 Perform CHANNEL CALIBRATION.

24 months SR 3.3.5.2.5 Perform LOGIC SYSTEM FUNCTIONAL TEST.

24 months Amendment No. 204/200 Quad Cities I and 2 3.3.5.2-3

RCIC System Instrumentation 3.3.5.2 Table 3.3.5.2-1 (page 1 of 1)

Reactor Core Isolation Cooling System Instrumentation CONDITIONS REQUIRED REFERENCED CHANNELS FROM REQUIRED SURVEILLANCE ALLOWABLE FUNCTION PER FUNCTION ACTION A.1 REQUiREMENTS VALUE

1.

Reactor vessel Water 4

SR 3.3.5.2.1 a -55.2 inches Level-Low LOw SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4 SR 3.3.5.2.5

2.

Reactor Vessel Water 2

C SR 3.3.5.2.1

50.34 inches Level-Hi gn SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4 SR 3.3.5.2.5
3.

Contaminated Condensate 2

D SR 3.3.5.2.3 a 598 ft 1 inch Storage Tank (CCST)

SR 3.3.5.2.4 Level -Low SR 3.3.5.2.5

4.

Suppression Pool Water 2

D SR 3.3.5.2.3

-< 15 ft Level-High SR 3.3.5.2.4 11.25 inches SR 3.3.5.2.5

5.

Manual Initiation 1

C SR 3.3.5.2.5 NA Amendment No.204/2 0 0 I

I Quad Cities 1 and 2 3.3.5.2-4