ML020460230

From kanterella
Jump to navigation Jump to search
Re Initial Licensing Examination Weeks of January 5, 2004 and January 12, 2004
ML020460230
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/12/2002
From: Dave Hills
Division of Reactor Safety III
To: Kingsley O
Exelon Generation Co, Exelon Nuclear
References
Download: ML020460230 (4)


Text

February 12, 2002 Mr. Oliver D. Kingsley, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Dear Mr. Kingsley:

In response to your facility management letter dated September 21, 2001, and as augmented by discussions with Thomas Shortel of your staff on January 28, 2002, we have tentatively scheduled an initial licensing examination for your operator license applicants at the Clinton Power Station during the weeks of January 5 and January 12, 2004. Validation of the examination will occur at the station during the week of December 15, 2003. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of November 24, 2003, to begin our review of your submitted examination.

Your letter indicated you are training approximately 11 candidates for the examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule. Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.

Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for NRC review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.

Hironori Peterson has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9707.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact David Pelton of my staff at 630-829-9732.

O. Kingsley In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc:

J. Heffley, Vice President W. Bohlke, Senior Vice President Nuclear Services J. Cotton, Senior Vice President -

Operations Support M. Pacilio, Plant Manager K. Ainger, Director - Licensing J. Skolds, Chief Operating Officer C. Crane, Senior Vice President -

Mid-West Regional Operating Group J. Benjamin, Vice President - Licensing And Regulatory Affairs R. Hovey, Operations Vice President R. Helfrich, Senior Counsel, Nuclear Mid-West Regional Operating Group W. Illiff, Regulatory Assurance Manager Document Control Desk-Licensing Illinois Department of Nuclear Safety F. Tsakeres, Training Department

O. Kingsley In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc:

J. Heffley, Vice President W. Bohlke, Senior Vice President Nuclear Services J. Cotton, Senior Vice President -

Operations Support M. Pacilio, Plant Manager K. Ainger, Director - Licensing J. Skolds, Chief Operating Officer C. Crane, Senior Vice President -

Mid-West Regional Operating Group J. Benjamin, Vice President - Licensing And Regulatory Affairs R. Hovey, Operations Vice President R. Helfrich, Senior Counsel, Nuclear Mid-West Regional Operating Group W. Illiff, Regulatory Assurance Manager Document Control Desk-Licensing Illinois Department of Nuclear Safety F. Tsakeres, Training Department DOCUMENT NAME: G:\\DRS\\CLI021202DRS.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd DLPelton DEHills DATE 02/8/02 02/11/02 02/12/02 OFFICIAL RECORD COPY

O. Kingsley ADAMS Distribution:

AJM DFT JBH1 RidsNrrDipmIipb GEG HBC PLL DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS