|
---|
Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] Category:Technical Specification
MONTHYEARRA-19-019, Submittal of Changes to Technical Specifications Bases2019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases RA-18-018, Submittal of Changes to Technical Specifications Bases2018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases RA-14-035, Submittal of Changes to Technical Specifications Bases2014-04-10010 April 2014 Submittal of Changes to Technical Specifications Bases RA-13-039, Submittal of Changes to Technical Specifications Bases2013-04-10010 April 2013 Submittal of Changes to Technical Specifications Bases RA-12-046, Submittal of Changes to Technical Specifications Bases2012-04-12012 April 2012 Submittal of Changes to Technical Specifications Bases RA-11-021, Submittal of Changes to Technical Specifications Bases2011-04-15015 April 2011 Submittal of Changes to Technical Specifications Bases RA-10-027, Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable2010-06-25025 June 2010 Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable RA-10-037, Submittal of Changes to Technical Specifications Bases2010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases ML1006200112010-02-25025 February 2010 Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary RA-10-009, Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary2010-02-25025 February 2010 Oyster Creek, License Amendment Request, Changes to Trunnion Room Secondary Containment Boundary RA-09-065, Application for Technical Specifications Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (Adoption of TSTF-425, Rev 3)2009-10-30030 October 2009 Application for Technical Specifications Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (Adoption of TSTF-425, Rev 3) RA-09-036, Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 20092009-04-17017 April 2009 Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 2009 RA-08-091, Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)2008-09-29029 September 2008 Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-060, Transmittal of Supplemental Response - Amergen Application to Revise Technical Specifications Secondary Containment Operability Requirements During Refueling2008-07-0303 July 2008 Transmittal of Supplemental Response - Amergen Application to Revise Technical Specifications Secondary Containment Operability Requirements During Refueling RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im ML0810505452008-04-30030 April 2008 Technical Specification Pages for License Amendment No. 265 the Incorporation of TSTF-448, Revision 3, Control Room Habitability. (Tac MD5281) RA-08-041, Submittal of Changes to Technical Specifications Bases2008-04-28028 April 2008 Submittal of Changes to Technical Specifications Bases ML0731804012007-11-0202 November 2007 Technical Specification Change Request No. 338 - Secondary Containment Operability Requirements During Refueling RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0712401382007-04-27027 April 2007 Submittal of Changes to Technical Specifications Bases RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0627200562006-09-28028 September 2006 Technical Specification Change Request No. 339 - License Amendment Request to Revise Technical Specification Definitions of Channel Calibration, Channel Check and Channel Test ML0615103502006-05-25025 May 2006 Technical Specification Change Request No. 328 - Response to Request for Additional Information Concerning a Revision to Surveillance Requirements for Testing of Main Steam Line Electromatic Relief Valve ML0612902192006-04-24024 April 2006 Submittal of Changes to Technical Specifications Bases ML0534302552005-12-0202 December 2005 License Amendment Request Increase Safety Valve As-Found Setpoint Tolerance from 1% to 3% ML0513704932005-05-10010 May 2005 Oyster Creek Generating Station, Submittal of Changes to Technical Specifications Bases ML0508705402005-03-25025 March 2005 Technical Specification Change Request No. 332 - Upgrade of 69 Kv Offsite Power Transmission Line ML0506002452005-02-25025 February 2005 Technical Specification Pages Re Control Rod Operability Requirements RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program ML0432200942004-11-16016 November 2004 Tech Spec Page for Amendment No. 252, Safety Limit Minimum Critical Power Ratio ML0432201012004-11-0808 November 2004 Unit 1 Amendment to Technical Specification ML0429505442004-10-15015 October 2004 Correction of Amendment No. 245 to Technical Specification Pages Electrical Power Sources ML0409003432004-03-23023 March 2004 Technical Specification Change Request No. 304/320 (Tscr) - Relocation of Independent Onsite Safety Review Group Function to the Quality Assurance Topical Report ML0409003312004-03-19019 March 2004 Technical Specification Change Request No. 322 Regarding Implementation of Option B Scram Time Testing ML0404002262004-02-0505 February 2004 Tech Spec Pages for License Amendment 240, Extension of Delay Period as Result of Missed Surveillance ML0326510472003-09-11011 September 2003 Supplement to License Amendment Request No. 306 for Revision to Technical Specifications Regarding DC Electrical Power Sources Based on TSTF-360 ML0316110292003-06-0202 June 2003 Technical Specification Change Request No. 314 - Startup Transformer and Emergency Diesel Generator Unavailability Periods ML0312006612003-04-21021 April 2003 License Amendment Request No. 306 - DC Electrical Power Sources Based on TSTF-360 ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0215401332002-05-31031 May 2002 TS Pages to Amendment 289 Cycle-Specific Safety Limit Minimum Critical Power Ratio ML0215503542002-05-0707 May 2002 Tech Spec Change Request No. 294, Transmittal of Camera - Ready Tech Spec Pages ML0212900522002-04-26026 April 2002 Technical Specification Change Request No. 308 - General Electric Stability Analysis Methodology ML0208705752002-03-27027 March 2002 Technical Specifications, Amendment 227 - Allowing 24-month Capacity Test for DG Starting Batteries ML0208000102002-03-18018 March 2002 Technical Specification - Amendment, Correction of Pages Issued by Amendment No. 219 (Tac Nos. MA7804 and MB1748) ML0205801792002-02-11011 February 2002 Transmittal of Revised Oyster Creek Technical Specification Page 3 (Revision 224), Lep 1 (Revision 224), Lep 4 (Revision 224), Xxiv (Revision 224), TS Appendix a Pages 6-4 & 6-6 (Revision 224) ML0204300932002-02-0707 February 2002 Amendment 225, Tech Spec Pages ML0203005342002-01-23023 January 2002 Amendment 223, Technical Specification 5.3 Re Auxiliary Equipment ML0204501572002-01-17017 January 2002 Technical Specification Change Request 287, Transmittal of Camera-Ready Technical Specification Pages ML17037C1771975-12-19019 December 1975 Letter Enclosing a Corrected Attachment to License Amendment No. 11 Change No. 27 to the Technical Specifications Provisional Operating License No. DPR-16 2019-04-12
[Table view] Category:Bases Change
MONTHYEARRA-19-019, Submittal of Changes to Technical Specifications Bases2019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases RA-18-018, Submittal of Changes to Technical Specifications Bases2018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases RA-14-035, Submittal of Changes to Technical Specifications Bases2014-04-10010 April 2014 Submittal of Changes to Technical Specifications Bases RA-13-039, Submittal of Changes to Technical Specifications Bases2013-04-10010 April 2013 Submittal of Changes to Technical Specifications Bases RA-12-046, Submittal of Changes to Technical Specifications Bases2012-04-12012 April 2012 Submittal of Changes to Technical Specifications Bases RA-11-021, Submittal of Changes to Technical Specifications Bases2011-04-15015 April 2011 Submittal of Changes to Technical Specifications Bases RA-10-027, Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable2010-06-25025 June 2010 Technical Specification Change Request No. 356, Elimination of Daily Testing of an Operable Emergency Diesel Generator (EDG) When the Other EDG Is Declared Inoperable RA-10-037, Submittal of Changes to Technical Specifications Bases2010-04-22022 April 2010 Submittal of Changes to Technical Specifications Bases RA-09-036, Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 20092009-04-17017 April 2009 Submittal of Changes to Technical Specifications Bases, Includes Changes Through April 2, 2009 RA-08-091, Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)2008-09-29029 September 2008 Submittal of Revised Bases Page - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) RA-08-041, Submittal of Changes to Technical Specifications Bases2008-04-28028 April 2008 Submittal of Changes to Technical Specifications Bases ML0731804012007-11-0202 November 2007 Technical Specification Change Request No. 338 - Secondary Containment Operability Requirements During Refueling RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0712401382007-04-27027 April 2007 Submittal of Changes to Technical Specifications Bases RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0615103502006-05-25025 May 2006 Technical Specification Change Request No. 328 - Response to Request for Additional Information Concerning a Revision to Surveillance Requirements for Testing of Main Steam Line Electromatic Relief Valve ML0612902192006-04-24024 April 2006 Submittal of Changes to Technical Specifications Bases ML0513704932005-05-10010 May 2005 Oyster Creek Generating Station, Submittal of Changes to Technical Specifications Bases ML0508705402005-03-25025 March 2005 Technical Specification Change Request No. 332 - Upgrade of 69 Kv Offsite Power Transmission Line ML0316110292003-06-0202 June 2003 Technical Specification Change Request No. 314 - Startup Transformer and Emergency Diesel Generator Unavailability Periods ML0215503542002-05-0707 May 2002 Tech Spec Change Request No. 294, Transmittal of Camera - Ready Tech Spec Pages ML0212900522002-04-26026 April 2002 Technical Specification Change Request No. 308 - General Electric Stability Analysis Methodology ML0204501572002-01-17017 January 2002 Technical Specification Change Request 287, Transmittal of Camera-Ready Technical Specification Pages 2019-04-12
[Table view] |
Text
AmerGen AmerGen Energy Company, LLC www.exeloncorp.com An Exe]on/British Energy Company 200 Exelon Way Suite 345 Kennett Square, PA 19348 10 CFR 50.90 January 17, 2002 2130-02-20028 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Technical Specification Change Request No. 287, Transmittal of Camera - Ready Technical Specification Pages Oyster Creek Generating Station (Oyster Creek)
Facility Operating License No. DPR-1 6 NRC Docket No. 50-219 This letter transmits the camera-ready Technical Specification pages to support NRC issuance of an amendment approving Oyster Creek Technical Specification Change Request No. 287.
If you have any questions or require additional information, please do not hesitate to contact us.
I declare under penalty of perjury that the foregoing is true and correct.
Very truly yours, Executed On Michael P. Galla~gher Director, Licensing & Regulatory Affairs Mid-Atlantic Regional Operating Group
Enclosure:
Oyster Creek Technical Specification Revised Pages for Technical Specification Change Request No. 287 cc: H. J. Miller, USNRC, Regional Administrator, Region I H. N. Pastis, USNRC, Senior Project Manager, Oyster Creek L. A. Dudes, USNRC, Senior Resident Inspector, Oyster Creek File No. 01059
ENCLOSURE Oyster Creek Technical Specification Revised Pages for Technical Specification Change Request No. 287 (Pages 3.5-4, 3.5-10, and 3.5-12)
- 5. Pressure Suppression Chamber - Drywell Vacuum Breakers
- a. When primary containment is required, all suppression chamber drywell vacuum breakers shall be OPERABLE except during testing and as stated in Specification 3.5.A.5.b and c, below.
Suppression chamber - drywell vacuum breakers shall be considered OPERABLE if:
(1) The valve is demonstrated to open from closed to fully open with the applied force at all valve positions not exceeding that equivalent to 0.5 psi acting on the suppression chamber face of the valve disk.
(2) The valve disk will close by gravity to within not greater than 0.10 inch of any point on the seal surface of the disk when released after being opened by remote or manual means.
(3) The position alarm system will annunciate in the control room if the valve is open more than 0.10 inch at any point along the seal surface of the disk.
- b. Five of the fourteen suppression chamber - drywell vacuum breakers may be inoperable provided that they are secured in the closed position. With one of the nine required suppression chamber
- drywell vacuum breakers inoperable, restore one vacuum breaker to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- c. One position alarm circuit for each OPERABLE vacuum breaker may be inoperable, provided that each OPERABLE suppression chamber - drywell vacuum breaker with one defective alarm circuit, and associated remaining position alarm circuit are verified to be OPERABLE immediately, and monthly in accordance with 4.5.F.5.a.
Additionally, a daily verification using the OPERABLE position alarm circuit that the affected vacuum breaker is closed shall be performed.
- d. If Specifications 3.5.A.5 (a), (b) or (c) can not be met, the reactor shall be PLACED IN the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 6. After completion of the startup test program and demonstration of plant electrical output, the primary containment atmosphere shall be reduced to less than 4.0% 02 with nitrogen gas within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the reactor mode selector switch is placed in the RUN MODE.
Primary containment deinerting may commence 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to a scheduled shutdown.
- 7. Deleted.
OYSTER CREEK 3.5-4 Amendment No.: 21, 32, 41, 86, 87, 196
The capacity of the 14 suppression chamber to drywell vacuum relief valves is sized to limit the external pressure of the drywell during post-accident drywell cooling operations to the design limit of 2 psi. They are sized on the basis of the Bodega Bay pressure 1 with NEDE-24802( 6) suppression tests' )"1'°. A calculation (15) was performed in accordance 9
to determine the required number of vacuum breakers by using a mass and energy balance to determine vacuum breaker flow area. The results of the calculation indicate that 8 vacuum breakers are required to provide vacuum relief capability. An additional vacuum breaker is included for single failure criteria, bringing the total required to 9.
Each suppression chamber drywell vacuum breaker is fitted with a redundant pair of limit switches to provide fail safe signals to panel mounted indicators in the reactor building and alarms in the control room when the disks are open more than 0.1" at any point along the seal surface of the disk. These switches are capable of transmitting the disk closed-to-open signal with 0.01" movement of the switch plunger. Continued reactor operation with failed components is justified because of the redundancy of components and circuits and, most importantly, the accessibility of the valve lever arm and position reference external to the valve. The fail-safe feature of the alarm circuits assures operator attention if a line fault occurs.
Conservative estimates of the hydrogen produced, consistent with the core cooling system provided, show that the hydrogen air mixture resulting from a loss-of-coolant accident is considerably below the flammability limit and hence it cannot burn, and inerting would not be needed. However, inerting of the primary containment was included in the proposed design and operation. The 5% oxygen limit is the oxygen concentration limit stated by the American Gas Association for hydrogen-oxygen mixtures below which combustion will not occur.(4) The 4% oxygen limit was established by analysis of the Generation and Mitigation of Combustible Gas Mixtures in (12)
Inerted BWR Mark I Containments.
To preclude the possibility of starting up the reactor and operating a long period of time with a significant leak in the primary system, leak checks must be made when the system 0
is at or near rated temperature and pressure. It has been shown(9)(1 ) that an acceptable margin with respect to flammability exists without containment inerting. Inerting the primary containment provides additional margin to that already considered acceptable.
Therefore, permitting access to the drywell for the purpose of leak checking would not reduce the margin of safety below that considered adequate and is judged prudent in terms of the added plant safety offered by the opportunity for leak inspection. The 24-hour time to provide inerting is judged to be a reasonable time to perform the operation and establish the required 02 limit.
OYSTER CREEK 3.5-10 Amendment No.: 75, ,,6, 196_,l~
Two separate filter trains are provided, each having 100% capacity(6). If one filter train becomes inoperable, there is no immediate threat to secondary containment and reactor operation may continue while repairs are being made. Since the test interval for this system is one month (Specification 4.5), the time out-of-service allowance of 7 days is based on considerations presented in the Bases in Specification 3.2 for a one-out-of-two system.
Two automatic secondary containment isolation valves are installed in each reactor building ventilation system supply and exhaust duct penetration. Both isolation valves for each supply duct penetration are located inside the secondary containment boundary, and the two exhaust duct penetration isolation valves are located outside of the secondary containment boundary. Removal of an inboard supply or exhaust valve (closest to the boundary) is permitted only when secondary containment is not required. The outboard isolation supply or exhaust valve can be removed when secondary containment is required as long as the inboard valve is secured in the closed position.
References:
(1) FDSAR, Volume I, Section V-1 (2) FDSAR, Volume I, Section V-1.4.1 (3) FDSAR, Volume I, Section V-1.7 (4) Licensing Application, Amendment 11, Question 111-25 (5) FDSAR, Volume I, Section V-2 (6) FDSAR, Volume I, Section V-2.4 (7) Licensing Application, Amendment 42 (8) Licensing Application, Amendment 32, Question 3 (9) Robbins, C. H., "Tests on a Full Scale 1/48 Segment of the Humboldt Bay Pressure Suppression Containment, "GEAP-3596, November 17, 1960.
(10) Bodega Bay Preliminary Hazards Summary Report, Appendix I, Docket 50-205, December 28, 1962.
(11) Report H. R. Erickson, Bergen-Paterson To K. R. Goller, NRC, October 7, 1974.
Subject:
Hydraulic Shock Sway Arrestors.
(12) General Electric NEDO-22155 "Generation and Mitigation of Combustible Gas Mixtures in Inerted BWR Mark I Containment" June 1982.
(13) Oyster Creek Nuclear Generating Station, Mark I Containment Long-Term Program, Plant Unique Analysis Report, Suppression Chamber and Vent System, MPR-733; August, 1982.
(14) Oyster Creek Nuclear Generating Station, Mark I Containment Long-Term Program, Plant Unique Analysis Report, Torus Attached Piping, MPR-734; August, 1982.
(15) AmerGen Calculation C-1302-243-El70-087, "Wetwell-to-Drywell Vacuum Breaker Sizing."
(16) General Electric NEDE-24802, "Mark I Containment Program Mark I Wetwell-to-Drywell Vacuum Breaker Functional Requirements, Task 9.4.3," April, 1980.
OYSTER CREEK 3.5-12 Amendment No.: 14, 1-, 75, 86, ,7, 168,, 196 Corrected: 12/24/84